2020-2021 Global Affiars Canada departmental progress report for Canada’s National Action Plan on Women, Peace and Security
Table of contents
- Definitions
- Abbreviations
- Executive summary
- Thematic programs
- 1. Global Issues and Development Branch
- 2. Peace and Stabilization Operations Program Bureau (PSOPs)
- 3. Canada Fund for Local Initiatives (CFLI)
- 4. Counter-Terrorism, Crime and Intelligence Bureau
- 5. Policy and Programming on Non-Proliferation, Arms Control and Disarmament
- 6. Partnerships for Development Innovation Branch
- Multilateral engagement
- Bilateral engagement
- Annex 1: Methodology for Objective Ratings
- Annex 2: Summary of progress in meeting targets
- Annex 3: Tracking of International Assistance Investments to advance Women, Peace and Security
Definitions
Target: What Canada aims to accomplish by the end of the lifespan of the Action Plan OR by the proposed target date.
Baseline: A “baseline” is a clearly defined starting point identified for comparative purposes. A baseline can be described in a quantitative or qualitative manner.
Activity: The actions Canada will undertake to advance from the baseline to the target.
Indicator: The quantitative or qualitative marker used to gauge how well Canada is moving from the baseline to the target.
Objectives: The five main objectives of Canada’s National Action Plan represent the outcome level in the Action Plan’s theory of change. Progress in achieving a specific target contribute to advancing one of these objectives. We have assigned targets – which are generally at the action or immediate outcome level in the theory of change, to objectives to facilitate the measuring and presentation of results at the aggregate, outcome level.
Internal capacity and efficiency: The Internal capacity and efficiency category was added to collect targets that include activities aiming at improving our own capacity to implement the Action Plan, such as mandating GBA Plus training or creating gender advisor positions.
Abbreviations
- ACCBP
- Anti-Crime Capacity Building Program
- CFLI
- Canada Fund for Local Initiatives
- CSO
- Civil society organizations
- CT
- Counter-terrorism
- CTCBP
- Counter-Terrorism Capacity Building Program
- CVE
- Counter-violent extremism
- DRC
- Democratic Republic of Congo
- FARC
- Revolutionary Armed Forces of Colombia
- FY
- Fiscal year
- GBA Plus
- Gender-based Analysis Plus
- GBV
- Gender-based violence
- GE
- Gender Equality
- ICRC
- International Committee of the Red Cross
- IGAD
- Intergovernmental Authority on Development
- IOF
- International Organisation of La Francophonie
- LGBTQ2I
- Lesbian, gay, bisexual, transgender and intersex
- NAP
- National Action Plan
- NATO
- North Atlantic Treaty Organization
- NGO
- Non-governmental organization
- OECD
- Organisation for Economic Co-operation and Development
- OSCE
- Organization for Security and Co-operation in Europe
- P/CVE
- Prevention and Countering of Violent Extremism
- PSOPs
- Peace and Stabilization Operations Program
- SEA
- Sexual exploitation and abuse
- SGBV
- Sexual and gender-based violence
- SRHR
- Sexual and reproductive health and rights
- UNGA
- United Nations General Assembly
- UNSCR
- United Nations Security Council Resolution
- VAW
- Violence against women
- WMD
- Weapons of mass destruction
- WTRP
- Weapons Threat Reduction Program
- WPS
- Women, Peace and Security
Executive summary
Global Affairs Canada’s implementation plan for the Government of Canada’s National Action Plan on Women, Peace and Security (WPS) includes 98 targets across development assistance, humanitarian action and peace and stabilization efforts.
The targets in the implementation plan are set for a selection of countries and programs to focus our efforts and facilitate progress measurement. Global Affairs Canada recognizes that implementation of the WPS agenda is a cross-cutting effort, and strives to integrate the agenda into all relevant lines of effort. This report is therefore not an exhaustive overview of all departmental efforts to implement the WPS agenda, but rather provides a snapshot of this work to provide transparency and identify successes, progress, challenges, and areas for improvement.
This report covers the period of 1 April 2020 to 31 March 2021. Every target is assigned a rating based on progress achieved to date, provides details on completed activities, and analyzes results. Changes were made to the GAC implementation plan in FY 2018/19 to ensure that targets, activities, and indicators better capture progress, clarify language, reduce redundancies, and become more ambitious.
Each target has been assigned a ratingFootnote 1 as follows:
0 - Too Early to Report
1 - Attention Required
2 - Mostly on Track
3 - On Track
4 - Target Achieved or Surpassed
In total, 30 targets contribute to achieving Objective 1: Increase the meaningful participation of women, women’s organizations and networks in conflict prevention, conflict resolution, and post-conflict statebuilding. This objective includes targets on supporting greater representation of women in institutions and mechanisms responsible for conflict prevention and resolution, as well as supporting gender mainstreaming efforts of these institutions; providing support to women’s organizations for advancing gender equality, including on preventing sexual and gender-based violence (SGBV); as well as all targets related to advocacy on WPS. Of the targets contributing to this objective, 20% have been achieved or surpassed (6), 40% are on track (12), and 40% (12) are mostly on track.
Nine targets contribute to Objective 2: Prevent, respond to and end impunity for SGBV perpetrated in conflict and sexual exploitation and abuse (SEA) by peacekeepers and other international personnel, including humanitarian and development staff. This objective includes targets such as building the capacity of health institutions to address SGBV cases; enhancing the knowledge and exercise of women’s and girls’ human rights, including those related to SGBV and sexual and reproductive health and rights (SRHR); as well as enhancing the use of justice support services, particularly in cases related to SGBV. Of the nine targets contributing to this objective, 78% are rated as on track (7), and 22% are rated as mostly on track (2).
In total, 31 targets contribute to Objective 3: Promote and protect women’s and girls’ human rights, gender equality and the empowerment of women and girls in fragile and conflict-affected settings. This objective includes targets on gender mainstreaming in counter-terrorism and international anti-crime policy and advocacy; integration of gender issues into diplomacy on disarmament; women’s political, social and economic empowerment in fragile and conflict-affected states; gender-sensitive criminal investigations; women’s access to justice and legal representation; as well as girls’ access to education. Of these targets, 65% are on track (12) or have been achieved or surpassed (8), while 29% (9) targets have been rated as mostly on track. One of the targets (3%) is too early to report on and one requires attention (3%).
Two targets contribute to Objective 4: Meet the specific needs of women and girls in humanitarian settings, including the upholding of their sexual and reproductive rights and access to sexual and reproductive health services; both targets continue to be rated as on track.
A total of four targets contribute to the Action Plan’s final objective, Objective 5: Strengthen the capacity of peace operations to advance the WPS agenda. The rating remains the same as last year; three of the targets are rated as on track, and one target has been achieved or surpassed.
Beyond the targets assigned to meet the five objectives of the Action Plan, the GAC implementation plan also measures internal capacity and efficiency, as success in this area is critical to ensuring that WPS principles are advanced in all of the department’s work. The GAC implementation plan has 22 dedicated targets to improve internal capacity and efficiency, which supports the achievement of the five objectives without contributing to them directly. Of these targets, 90% are on track (13) or have been achieved or surpassed (5), one is mostly on track (5%) and one requires attention (5%).
Overall, the report demonstrates that significant efforts have been made towards the implementation and reporting of Action Plan targets. Targets that are “too early to report on” have decreased from 14 in FY 2017/18 to 1 in FY 2020/21, demonstrating that increased efforts have been made across the department to collect the necessary data to produce this report. 42 targets have consistently remained “on track” since FY 18/29. Furthermore, the number of targets that have been achieved or surpassed has steadily increased from 5 in FY 2017/18, 14 in FY 2018/19, 20 in FY 2019/20, to 23 in FY 2020/21.
Thematic programs
1. Global Issues and Development Branch
Context: Through the Global Issues and Development Branch, Global Affairs Canada engages with multilateral and international organizations to advance Canadian development and humanitarian priorities. These partners have the capacity, expertise, and mandate to address global challenges, achieve sustainable development results, including in fragile and conflict-affected states, and respond effectively in humanitarian crises. Initiatives supported by this program help Canada shape international assistance policy, promote an effective and efficient multilateral development and humanitarian system, and address global issues – including Gender Equality (GE) and the empowerment of women and girls; environment, climate action and water; peace and security; human rights, governance, democracy and inclusion; health, education and nutrition; and inclusive and green economic growth.
Canada’s humanitarian assistance aims to save lives, alleviate suffering and maintain human dignity for people affected by humanitarian crises. This includes providing financial support to experienced humanitarian partners responding to these crises, such as United Nations agencies, the Red Cross/Red Crescent movement and non-governmental organizations, founded on the humanitarian principles of human dignity, neutrality, impartiality and independence. It also includes engagement with humanitarian organizations and networks to support and strengthen the capacity of the humanitarian system. Canada’s increasing support to experienced humanitarian partners in SRHR in emergencies, is helping to address gender-based gaps in access to reproductive health services; to integrate comprehensive GBV response and treatment in reproductive health; and provide safe spaces for women and girls.
Priorities: Mainstream WPS and GE into Canada’s conflict prevention, relief and recovery efforts
1.1 Target: The capacity, skills, knowledge and resources for GE, primarily among Global Affairs Canada officers, are increased.
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
- Between April 01, 2020 and March 31, 2021, a total of 495 GAC staff benefited from training on gender equality (GE) delivered by the Gender Equality Division (MGS)'s GE Specialists.
- Between April 01, 2020 and March 31, 2021, 0 missions hosted GE training delivered by GE specialists in country programs listed as fragile and conflict-affected states due to the COVID-19 pandemic.
- As of March 31, 2021, there were 43 tools and guidance documents on GE available for use by staff (at headquarters and mission).
Baseline:
- In 2015/16, 135 Global Affairs Canada officers received GE training delivered by GE specialists.
- In 2015/16, five missions received GE training tailored by GE specialists for country programs in fragile and conflict-affected states; these include Mali, Myanmar, Ukraine, West Bank/ Gaza and Jordan.
- In 2015/16, 21 tools and guidance documents on GE are available to Global Affairs Canada staff.
Activity:
- Share knowledge and expertise on a feminist approach, GE and gender norms with Canadian and international experts and stakeholders
- Develop and facilitate training and pre-deployment courses on GE and context-specific gender norms
Indicator:
- # of Global Affairs Canada staff trained on GE delivered by GE specialists
- # of Global Affairs Canada missions received GE training tailored by GE specialists for country programs in fragile and conflict-affected states
- # of tools and guidance documents on GE
Completed Activities:
- Facilitated corporate training on gender equality by gender equality specialists.
- Unable to provide gender equality training to Global Affairs Canada staff and international partners due to the COVID-19 pandemic.
- Shared knowledge and expertise on the feminist approach and gender equality with Global Affairs Canada staff, international partners and stakeholders.
Results and Progress:
In FY 2020/21, a total of 495 Global Affairs Canada (GAC) staff participated in gender equality (GE) courses delivered by GE specialists, a significant increase since FY 2015-16, when 135 GAC staff participated. Due to the COVID-19 pandemic, GE specialists have shifted in-person training sessions to virtual training sessions. This included sessions on Programming for GE Results in GAC’s COVID-19 Response, GE coding, Feminist Monitoring, Evaluation and Learning (MEL) and the feminist approach to unpaid and paid care work. In addition, the Women’s Voice and Leadership (WVL) team and implementing partner co-facilitators successfully organized learning events for all regional learning clusters, which included national women’s rights organizations (WROs), LBTQI+ leaders, implementing partners and GAC staff. These learning sessions have highlighted the need for an online GE course, which is now being developed.
In our COVID-19 pandemic response, GE Specialists worked with program staff to rapidly build the capacity of our implementing partners. This involved highlighting the importance of addressing GE in their COVID-19 proposals, which is often disregarded in rapid and crisis contexts. As a result of this concerted effort, almost 100% of COVID-19 projects assessed by the GE Specialist Teams were at least partially GE-integrated, and 60% were fully GE-integrated or GE-specific.
To further support this capacity building process, the Gender Equality Division worked in collaboration with the Global Health Bureau to set up a Gender Equality Assessment Framework and a Gender Equality Guide for COVID-19 Related Projects to ensure that our feminist approach to the COVID-19 pandemic reinforces Canada’s commitment to supporting women’s leadership in times of crisis. These proactive efforts and ongoing support from GE specialists aimed to ensure that gender equality and the empowerment of women and girls was at the center of the Department’s response to the global pandemic, and that GAC continued to meet its GE targets under the Feminist International Assistance Policy.
1.2 Target: 80% of global humanitarian assistance funding integrate GEFootnote 2 by 2021* to better meet the needs of women and girls in humanitarian settings.
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Internal capacity and efficiency
- In FY 2020/21, 97% of Canada’s humanitarian assistance projects integrated gender equality considerations, with only those focused on logistics not doing so. This surpasses the target of 80% by 2021 and builds upon the FY 2019/20 achievement of 96.2%.
Baseline:
- 53% of global humanitarian assistance funding integrates GE.
Activity:
- Proposal application and funding guidelines are revised with strengthened criteria and guidance on GE integration and GBV prevention and mitigation
- Develop tools and support the capacity building of humanitarian partners to better integrate GE and address and prevent GBV in emergencies
Indicator:
- % of humanitarian assistance funding that integrates GE
Completed Activities:
- Internal Gender Equality Institutional Assessments for humanitarian contributions to multilateral partners conducted in 2020.
- Supported humanitarian partners to better integrate gender equality considerations and address and prevent GBV in emergencies.
Results and Progress:
In FY 2020/21, Canada continued to integrate gender equality considerations into its humanitarian efforts to address the unmet needs and priorities of women and girls. 97% of Canada’s humanitarian assistance projects integrated gender equality considerations, with only those focused on logistics not doing so. This surpasses the target of 80% by 2021 and builds upon the 2019-2020 achievement of 96.2%.
Canada also conducted an internal Gender Equality Institutional Assessment for its humanitarian contributions to multilateral partners. The assessments aim to track multilateral partners’ institutional progress on the implementation of their gender policies on a yearly basis at a corporate and operational level for humanitarian initiatives. By tracking this progress, Canada ensures its assessment of gender equality coding for UN partners remains relevant and up to date as it considers its annual core support to these organizations. These assessments have also been helpful in prioritizing advocacy efforts to advance gender-responsive humanitarian action with multilateral partners.
Canada was also active in supporting the integration of gender equality into broader system-wide humanitarian action. Canada was a member of the steering committee of the Inter-Agency Humanitarian Evaluation on Gender Equality and the Empowerment of Women and Girls. This was the first thematic evaluation of its kind commissioned by the Inter-Agency Standing Committee, which makes concrete recommendations to shift the UN humanitarian system to be more gender responsive. Canada has championed the findings of this evaluation by, for example, hosting a donor briefing and events to socialize the findings. Canada has also advocated for the importance of the findings of the evaluation when engaging with UN Executive Boards in order to promote a more gender-responsive and accountable system.
In 2020, Canada’s Humanitarian Assistance Program supported a diverse array of partners who contributed to a stronger, more gender-responsive and more accountable humanitarian sector. For instance, in 2020, Canada provided $150,000 in support to The New Humanitarian (TNH) whose mission is to put independent quality journalism at the service of the world’s most vulnerable people. Thanks to this funding, TNH continued to report on longstanding gender issues in crises and humanitarian contexts, as well as using their analysis to hold those responsible for the violation of the human rights of women and girls accountable. This includes, for example, TNH’s groundbreaking investigative reporting on sexual exploitation and abuse by international humanitarian aid workers in the DRC Ebola response in 2018.
Canada in partnership with the Women’s Refugee Commission, worked to influence the humanitarian system through, for example, the development of a White Paper, Gender-Transformative Change in Humanitarianism: a View from the Inside. This research was used to foster dialogue and build capacity on feminist humanitarian assistance and means to achieve more inclusive and gender-transformative humanitarian outcomes.
Challenge:
Canada surpassed its target of 80% of funding integrating gender equality considerations by the end of 2021. However, there remain challenges related to the collection and assessment of gender equality data for the system writ large. There is no standardized way to collect relevant data and measure gender transformative change throughout the humanitarian system.
As well, the Inter-Agency Humanitarian Evaluation (IAHE) on Gender Equality and the Empowerment of Women and Girls (GEEWG) found that the humanitarian system lacks necessary capacity on gender equality to improve performance and country-level leadership, and that accountability on gender remains inconsistent.
Priorities: Realize women's and girls' human rights, particularly on preventing and responding to sexual and GBV in humanitarian settings
1.3 Target: Advocacy by Canada on preventing and responding to SGBV in emergencies is increased.
Target achieved to date as of March 31, 2021: On track/Objective 4
- In FY 2020/21, 32 Canadian events, statements, speeches and interventions to UN Executive boards and other multilateral fora explicitly brought attention to GBV in emergencies.
- This surpasses the FY 2017/18 baseline of 13, and surpasses the number reported in FY 2019/20.
Baseline:
- In FY 2017/18, 13 Canadian events, statements, speeches and interventions to UN Executive boards and other multilateral foraFootnote 3 that explicitly bring attention to GBV in emergencies.
Activity:
- Increase leadership on GBV within international assistance fora, including through the Call to Action on Protection from GBV in Emergencies
- Engage through multilateral governance boards (or groups) to hold partners accountable for their commitments concerning GBV
- Promote the use of the Inter-Agency Standing Committee Guidelines on Integrating GBV and the revised Inter-Agency Standing Committee gender marker by humanitarian organizations
Indicator:
- # of Canadian events, statements, speeches and interventions to UN Executive boards and other multilateral fora that explicitly bring attention to GBV in emergencies
Completed Activities:
- Increased leadership on gender-based violence (GBV) within international assistance fora, including throughout Canada’s final leadership year of the Call to Action on Protection from Gender-Based Violence in Emergencies.
- Engaged through multilateral governance boards to hold partners accountable for their commitments concerning SGBV.
- Promoted the use of the Inter-Agency Standing Committee for Integrating Gender-Based Violence Interventions in Humanitarian Action and the Inter-Agency Minimum Standards for Gender-Based Violence in Emergencies Programming.
Results and Progress:
Being the lead of the Call to Action in 2019-2020 enabled Canada to have increased influence on collective efforts to mitigate, prevent and respond to gender-based violence in emergencies and to elevate this issue in multilateral fora. In 2020, Canada led the development of a 2021-2025 strategic Road Map that strengthened the Call to Action’s focus on gender equality, empowerment of women and girls, intersectionality, sexual and reproductive health services, localization and accountability. Under Canada’s leadership, partners reaffirmed their commitment to the Call to Action and made ambitious commitments against the updated Road Map. Towards this, Canada’s Minister of International Development sent letters to heads of UN partner organizations to the Call to Action, urging bold and ambitious commitments.
The launch of the 2021-2025 Call to Action Road Map, held on the margins on the 2020 UN General Assembly, was a key advocacy effort to raise the profile of SGBV in humanitarian response. Representatives from states, international organizations and NGOs shared ideas and commitments to ensure that every humanitarian effort includes the policies, systems and mechanisms to prevent, mitigate and respond to GBV in emergencies by 2025.
Canada hosted the Call to Action Annual Partners Meeting on June 17-19, 2020. More than 190 representatives of international organizations, NGOs and states focused on how best to address GBV in emergencies through collective advocacy; resource mobilization; and strategizing on the next iteration of the Call to Action Road Map.
Canada spearheaded a joint statement on behalf of the Call to Action’s 87 partners, including to advocate for the recognition of GBV services as life-saving and essential in all humanitarian responses to the pandemic. Canada galvanized support and issued a statement GBV & COVID-19 on behalf of all members, drawing attention to GBV and relevant considerations in its humanitarian response.
Canada, alongside other donors, used a variety of platforms (including bilateral Ministerial meetings, virtual Executive Boards, and the OCHA Donor Support Group Technical Session on Gender) to advocate for all partners to ensure that humanitarian programming mitigates GBV and is prioritized as part of humanitarian response efforts, particularly with partner organizations who receive un-earmarked contributions.
With funding from Canada, the Women’s Refugee Commission developed the guiding document ‘Strengthening Field Implementation: a Strategy for Call to Action Partners.’ This strategy outlines objectives to strengthen the uptake of the GBV Accountability Framework, raise awareness of the initiative at the country and regional levels, and deepen partnerships with local actors, particularly women’s organizations. It offers an array of actions through which partners, individually and collectively, can have an impact to prevent, mitigate and respond to GBV.
Also with funding from Canada, the Women’s Refugee Commission developed a guidance note for Call to Action partners on advocacy for the integration of gender equality considerations and GBV prevention, mitigation and response in Humanitarian Needs Overviews (HNOs), Humanitarian Response Plans (HRPs) and Periodic Monitoring Reports (PMRs). The guidance note is a tool for partners to advocate for humanitarian response that is accountable to women and girls.
Challenge:
In 2020, several of Canada’s planned in-person advocacy opportunities were upended due to the COVID-19 pandemic, including the Call to Action Annual Partners’ Meeting in June 2020, and the launch of the Call to Action 2021-2025 Road Map on the margins of the UN General Assembly in September 2021. In particular, Canada adapted to host the annual partners’ meetings online, which required the 3-day meeting to be condensed. This presented challenges for the meetings’ substance and results, given reduced time for collaboration on complex issues. The COVID-19 pandemic also affected staff capacity to participate in non-core advocacy opportunities.
Priorities: Reduce gender inequalities in access to and control over the resources and benefits of development
1.4 Target: Canada demonstrates increased leadership on advancing SRHR in fragile and humanitarian settings.
Target achieved to date as of March 31, 2021: On track/Objective 4
- $41.7 M in support of SRH services in humanitarian programming in FY 2020/21.
- In FY 2020/21, 16 Canadian events, statements, speeches and interventions to UN Executive boards and other multilateral fora explicitly brought attention to SRHR in fragile and conflict-affected countries. This surpasses the number reported in FY 2019/2
Baseline:
- In FY 2017/18, Global Affairs Canada disbursed $215M to provide access to or increase use of sexual and reproductive health (SRH) services in fragile and conflict-affected countries. Canada made 23 public interventions in international fora that explicitly promoted SRHR in fragile and conflict-affected countries and demonstrated Canada's high-level commitment to this issue.
Activity:
- Support partners’ efforts to provide or improve access to SRH services by women and girls in fragile and conflict-affected countries, including in response to SGBV
- Promote the SRHR of women and girls in fragile and conflict-affected countries in international fora
Indicator:
- amount of funding disbursed for Government of Canada-funded projects that provide access to or increase use of SRH services in fragile and conflict-affected countries
- # of Canadian events, statements, speeches and interventions to UN Executive boards and other multilateral fora that explicitly bring attention to SRHR in fragile and conflict-affected countries.
Completed Activities:
- Canada provided $41.7M in support of SRH services in its humanitarian assistance programming.
- Promoted the SRHR of women and girls in fragile and conflict-affected countries in international fora.
Results and Progress:
Canada continued to demonstrate leadership on advancing SRHR in fragile and humanitarian settings in FY 2020/21. This includes through $41.7 M in support to humanitarian partners towards sexual and reproductive health (SRH) services in crisis. This support helped to prevent death, disease and disability related to unwanted pregnancies, obstetric complications and reproductive disorders, and gender-based violence.
FY 2019/20 marked the end of a three-year commitment to distribute $650 million to the empowerment of women and girls and gender equality, improve their sexual and reproductive health and rights. This resulted in a drop in annual funding for SRHR.
Through Canada’s funding to IPAS in 2020, 10,494 contraception services were provided to women and girls across Cox’s Bazar, Bangladesh. This included oral contraceptives, implants, and intrauterine device to support their sexual and reproductive health needs.
Canada recognized that the impacts of the COVID-19 pandemic included significant and tragic increases in gender-based violence and a potential decrease in access to critical SRHR services globally. Through its support to the UN Population Fund (UNFPA) in 2020, Canadian funding ensured the availability of essential, lifesaving services in SRH and GBV for the women, girls, and vulnerable populations throughout the Middle East region. With the help of Canada’s support in Syria, the UNFPA supported the provision of integrated SRH services through an overall total of 199 health facilities, 24 mobile clinics, 76 mobile teams, 96 static clinics, two hospitals, and one mental health facility located across the country. In Jordan, Canadian funding helped the organization reach 131,336 beneficiaries with SRH services, including antenatal care, safe deliveries, counselling and psychosocial support. With the knowledge that the impact of the pandemic included significant and tragic increases in gender-based violence, Canada also supported the UNFPA in providing safe, confidential and non-stigmatizing GBV response and prevention services to 58,386 beneficiaries.
As another example of Canada’s support for advancing SRHR in conflict settings, Canada provided $4.5M in support to the International Committee of the Red Cross’ (ICRC) special appeal on the prevention and reduction of sexual violence in armed conflict situations in 2020. The project focused on strengthening the ICRC’s response to sexual violence through improving the delivery of services and staff capacity related to sexual violence response in 14 countries. Through this multi-donor initiative, the ICRC has taken a multidisciplinary approach to address sexual violence at multiple stages of its occurrence, through a combination of programs and activities including engagement with high level actors, legal frameworks, and direct service provision. Through this support, the ICRC has been able to provide and facilitate access to primary health care and medical services to treat survivors of sexual violence, including reproductive health and other essential sexual health services.
Canada also provided $2.6M to Médecins Sans Frontières (MSF)’s emergency medical humanitarian response for Rohingya refugees in Cox’s Bazar in 2020. This funding supported MSF’s provision of sexual and reproductive health services at nine healthcare facilities servicing both refugee and host populations. With funding from Canada, MSF delivered antenatal, postnatal and family planning services to pregnant and lactating people; comprehensive medical and psychosocial care to survivors of sexual and gender-based violence (SGBV); and outreach sessions—with the help of community health workers and traditional birth attendants—to sensitize households to the availability of SRH services near them.
Challenge:
Canada continued to advocate for strong language on SRHR through its negotiation of the key humanitarian resolutions at ECOSOC and UNGA in 2020. However, Canada and like-minded on this issue faced increased opposition and worked hard to prevent backslide on previously agreed language in these resolutions.
2. Peace and Stabilization Operations Program Bureau (PSOPs)
Context: Canada is taking concrete actions to prevent and respond to conflicts abroad and to support UN peace operations in building a more peaceful and prosperous world. In 2018, Canada’s Peace and Stabilization Operations Program (PSOPs) became a permanent program within Global Affairs Canada (GAC). This is an important step forward in how the Government of Canada is equipped and structured to prevent conflict and respond to global peace and stability challenges. PSOPs is the Government of Canada’s principal platform for conflict prevention, stabilization and peacebuilding. It engages in Fragile and Conflict Affected States (FCAS) leveraging resources of, and partnerships with, multilateral institutions, NGOs, implementing partners, and like-minded nations. PSOPs contributes to improved peace, security, and stability for all people in FCAS. Its policy, operations, and programming are guided by GBA Plus and gender equality principles to ensure gender-responsive interventions and inclusive access to justice, social services, economic opportunity, political power and good governance. PSOPs also coordinates the implementation of Canada's NAP on WPS. It actively promotes the role of women in conflict resolution, prevention and post-conflict state building, and contributes to the prevention of and accountability for sex and gender-based violence (SGBV) and sexual exploitation and abuse (SEA).
Priorities: Increase funding for the implementation of the WPS agenda
2.1 Target:
- 15% of projects target GE as a specific objective (GE03) by the end of FY 2021/22 (corresponding to $13.5 M annually by the end of FY 2021/22)
- 80% of projects integrate GE (GE01 and GE02) by the end of the FY 2021/22
- Reduce to a minimum the number of projects that do not advance GE (GE00)
- Increased # of regional and local women’s organizations supported
Target achieved to date as of March 31, 2021: Target Achieved or Surpassed – 2.1.1, 2.1.2, 2.1.3, 2.1.4 / Objective 3
- 25.2% of all projects targeted gender equality (GE03).
- 73.1% of all projects integrated gender equality, with 27 (23.5%) being GE01 and 57 (49.6%) being GE02.
- 1.7% of all projects did not advance gender equality outcomes (GE00).
- PSOPS directly supported 1 regional and local women’s organization and over 30 indirectly.
- 15.4% of the total budget funded gender targeted projects (GE03).
- 83.8% of the total budget funded gender integrated projects (27.7% GE01 and 56.1% GE02).
- Only 0.8% of the total budget funded projects that did not advance gender equality outcomes (GE00).
Baseline:
In FY 2017/18, PSOPs produced the following results:
- 18.1% of projects targeted GE as a specific objective (GE03)
- 71.7% of projects integrated GE (33.9% GE01 and 37.8% GE02)
- 10.2% of projects did not advance gender equality outcomes (GE00)
In FY 2018/19, PSOPs produced the following results:
- 22.2 % of programing disbursements supported projects that target gender (GE03)
- 75.8 % of programing disbursements supported projects that integrate gender (46.5% for GE01 projects and 29.3% for GE02 projects)
- 1.9% of programing disbursements supported projects that did not advance gender equality outcomes (GE00)
Activity:
- Ensure WPS is prioritized in engagement with partners throughout the project lifecycle
- Ensure all project applications forms include gender and WPS assessments
- Conduct WPS assessments during project design, including for (in-kind) deployments
IndicatorFootnote 4:
- % of projects integrate WPS considerations (GE01 and GE02)
- % of projects that explicitly target WPS (and are GE03)
- % of projects that are at GE00
- # of regional and local women’s organizations supported
- % of programing disbursements that support projects that integrate gender (GE01 and GE02)
- % of programing disbursements that support projects that target gender (GE03)
- % of programing disbursements that support project that are GE00
Completed Activities:
- Out of 115 projects funded in FY 2020/21, 29 projects (25.2% of all projects) targeted gender equality as a specific objective and were coded GE03; 84 projects (73.1% of all projects) integrated gender equality and were coded GE01 or GE02; and 2 projects (1.7% of all projects) did not advance gender equality outcomes (GE00). Out of all projects funded, 27 projects (23.5% of all projects) were coded GE01 and 57 (49.6% of all projects) were coded GE02.
- Out of $136.2 M disbursed in FY 2020/21, $21.0 M or 15.4% of disbursements targeted gender equality (GE03); $114.1 M or 83.8% of total disbursements funded projects integrating gender equality (GE01 or GE02); and $1.1 M or 0.8% of total disbursements funded projects that did not advance gender equality outcomes (GE00). Of the projects coded GE01 or GE02, GE01 projects received $37.8 M or 27.7% of the total disbursements, while GE02 projects received $76.3 M or 56.1% of the total disbursements.
- PSOPs funded a project implemented by UN Women in South Sudan to support five implementing partners to conduct community dialogues and train women and men at the grassroots level in conflict resolution, leadership skills and psychosocial support skills. These local implementing partners are women-led and women-focused organizations that have at least five years of relevant working experience with local communities and government authorities in the ten former states of South Sudan. In Sudan, PSOPs also supported the Strategic Initiative for Women in the Horn of Africa, an Indigenous African women’s rights organization, to enhance women’s meaningful participation in Sudan’s political transition and strengthen coordination among women’s organizations across Sudan.
- Two local women’s organizations were supported in Cameroon on peacebuilding efforts.
- PSOPs provided capacity building support to the Ukrainian Association of Women in Law Enforcement (UAWLE) through the Canada-Ukraine Police Development Project implemented by Alinea International.
- PSOPs continued to support the Syrian Women’s Political Movement through the Women’s International League for Peace and Freedom to increase Syrian women’s effective political engagement.
Results and Progress:
In order to advance targets relating to the percentage of GE coded projects and percentage of programming disbursements, a number of actions have been adopted within PSOPs that are having a positive impact:
- PSOPs has shared GAC tools with project partners to help them improve their gender analysis and ideally adopt the GBA Plus methodology;
- PSOPs has engaged in dialogue with its partners in order to optimize gender-responsive results and improve PSOPs’ and partners’ respective knowledge of gender mainstreaming in projects in conflict-affected contexts;
- As gender analyses have improved, PSOPs has been gaining better knowledge of the context and taken it into account in the planning process;
- As a result of PSOPs advice/efforts, partners increased their capacity to develop and implement gender strategies, consult with diverse women's organizations, and facilitate women's participation in peace processes.
PSOPs direct support to local and regional women’s organizations:
- In Sudan, PSOPs directly supported The Strategic Initiative for Women in the Horn of Africa (SIHA) Network, to implement a 12-month project in Sudan. SIHA is a regional civil society organization in politically volatile contexts and is comprised of more than 70 member organizations across the region. Through this project five regional gender equality networks (GENs) are being established to provide a forum for regional information exchange on key political transition issues. Capacity strengthening for elected GEN representatives is underway to improve their ability to represent their local constituencies both locally and nationally. This project is also sensitizing community members and leadership about the importance of gender equality and women’s participation in political life via radio, television and social media engagement.
PSOPs indirect support to regional and local women’s organizations:
- In South Sudan, PSOPs partnered with UN Women to support 5 local women’s organizations to conduct community dialogues and train project participants (women and men) on a variety of technical subjects. The first year’s target of supporting 5 local implementing partners were met and plans are in place to scope 5 additional local women’s organizations in the second and final year of this project. These organizations are implementing peacebuilding initiatives, amplifying women’s voices and engaging men, including young men, to promote gender equality and the rights of women and girls, as well as women’s leadership and peacebuilding initiatives.
- PSOPs supported two local women’s organizations from Cameroon to build their capacities on peacebuilding, including on concepts of mediation, dialogue and negotiation; and roles of civil society in peacebuilding, with a focus on WPS.
- In addition to having supported professional development for its members (who are predominantly women), the Ukrainian Association of Women in Law Enforcement (UAWLE) promoted and advocated for gender equality issues within the law enforcement and security sector. This included contributions to discussion and dialogue on topics such as combatting domestic violence, sexual harassment policy, protection of human rights and promoting tolerance within the workplace. Representatives of UAWLE, both nationally and locally, were actively involved in research and assessments on the issues of equal rights and opportunities for women and men and the status of women in the law enforcement sector conducted or initiated by the Ukrainian Ministry of Internal Affairs as part of its gender equality policy. Many members also continued to participate in learning events and workshops to promote gender equality in both national and international forums.
- In Syria, PSOPs continued to support the Syrian Women’s Political Movement (SWPM) in partnership with the Women’s International League for Peace and Freedom (WILPF) through an initiative that seeks to increase Syrian women's effective political engagement. The SWPM is an advocacy organization established by politically active Syrian women. While the Syrian peace process is largely stalled, the SWPM made progress developing its organizational capacity and is engaged in international forums to advocate on behalf of Syrians. Increased exposure to international forums on issues related to Syria will build the recognition of SWPM as a legitimate voice of Syrian women with capacity to effect change. The SWPM secured 9 bilateral meetings with key stakeholders during the reporting period. This included meetings with Permanent Missions and State representatives from Canada, the European Union, Finland, Turkey, France, Germany, Estonia, Italy, Qatar.
- The ‘Enhancing Community Security and Access to Justice in Lebanese Host Communities’ project with the UNDP supported the National Committee for Women in Lebanon (NCLW)’s efforts to ensure the implementation of the UNSCR 1325 National Action Plan. The project has supported efforts of the Beirut Bar Association to provide free legal assistance through the establishment of temporary helpdesks and online solutions. Over 1000 survivors of the Beirut blast have been supported through this activity. UNDP is also working in partnership with the Tripoli Bar Association on the implementation of legal awareness sessions on SGBV in Tripoli. These awareness sessions address legal rights of women who are subjected to or at risk of being victims of SGBV.
- PSOPs supported local women's organizations in Colombia through the UN Multi-Partner Trust Fund for Peace in Colombia, which directly funded 17 women’s organizations to carry out projects on women’s and girls’ empowerment and leadership in promoting peace in Colombia. Furthermore, through the PSOPs-funded project “Promoting Inclusion and the Rights and Participation of LGBTI Victims of the Armed Conflict in Colombia” Canada funded three Colombian lesbian and trans organizations to promote LGBTI equality and local-level peacebuilding.
- Through the project “Improving Security in Haiti through Relationship Building in the Community” with Mercy Corps, Canada has increased the participation of civil society associations, including women’s and youth organizations, in the implementation of micro-projects promoting and protecting women’s and girls’ human rights, gender equality and the empowerment of women and girls. Of the 28 micro-projects funded, four were led by women's organizations representing more than 900 members jointly. Mercy Corps will continue to work with these micro project recipients to support and develop their capacity to lead community-level peacebuilding initiatives, and to promote and protect women’s and girls’ human rights, gender equality, and the empowerment of women and girls.
Challenges:
- Throughout the Middle East, engaging with regional and local women’s organizations remained a challenging aspect of programming due to the lack of permissive operational space and difficulty of finding viable and competent local partners. Extremist views on women’s participation in peace processes, civic engagement and patriarchal societies present challenges to supporting and including women and women-led organizations in discourse.
- In Colombia, connectivity issues with project participants (women and men) from isolated regions posed some challenges to effective and smooth participation in project activities. The COVID-19 pandemic mobility restrictions (imposed by both State and non-state actors) also resulted in increased threats, violence and assassinations of both women and men social leaders and human rights defenders, and reduced abilities for victims to access services. Reports indicated increased domestic violence and SGBV against women and LGBTI populations.
- In Africa, the COVID-19 pandemic health and travel restrictions limited the number of capacity building sessions that were planned and therefore, reaching WPS targets have been delayed in some PSOPs projects. Security risks remained high in the Anglophone regions of Cameroon, while misinformation and rumors in social media continued to pose operational challenges and reputational risks on every actor present in the country.

Text version
Amount | 2016/2017 | 2017/2018 | 2018/2019 | 2019/2020 | 2020/2021 |
---|---|---|---|---|---|
GE-0 | 8,693,161.81 | 8,004,190.32 | 3,102,234.29 | 5,135,406.00 | 1,051,373.00 |
GE-1 | 146,209,337.99 | 180,391,816.23 | 75,176,451.96 | 64,771,142.19 | 37,759,051.57 |
GE-2 | 37,569,690.46 | 46,250,983.37 | 47,433,739.62 | 76,756,313.95 | 76,337,403.10 |
GE-3 | 9,651,448.67 | 18,214,001.89 | 35,915,693.50 | 19,136,532.21 | 21,018,597.47 |
Project | 2016/2017 | 2017/2018 | 2018/2019 | 2019/2020 | 2020/2021 |
---|---|---|---|---|---|
GE-0 | 13 | 13 | 7 | 3 | 2 |
GE-1 | 40 | 43 | 49 | 41 | 27 |
GE-2 | 27 | 48 | 56 | 54 | 57 |
GE-3 | 13 | 23 | 29 | 31 | 29 |

Text version
Amount | 2016/2017 | 2017/2018 | 2018/2019 | 2019/2020 | 2020/2021 |
---|---|---|---|---|---|
GE-0 | 4.30% | 3.17% | 1.92% | 3.10% | 0.77% |
GE-1 | 72.34% | 71.34% | 46.51% | 39.07% | 27.73% |
GE-2 | 18.59% | 18.29% | 29.35% | 46.29% | 56.06% |
GE-3 | 4.78% | 7.20% | 22.22% | 11.54% | 15.44% |
Project | 2016/2017 | 2017/2018 | 2018/2019 | 2019/2020 | 2020/2021 |
---|---|---|---|---|---|
GE-0 | 13.98% | 10.24% | 4.96% | 2.33% | 1.74% |
GE-1 | 43.01% | 33.86% | 34.75% | 31.78% | 23.48% |
GE-2 | 29.03% | 37.80% | 39.72% | 41.86% | 49.57% |
GE-3 | 13.98% | 18.11% | 20.57% | 24.03% | 25.22% |
Priorities: Report on the implementation of the Action Plan
2.2 Target: Annual progress reports on implementation of the Action Plan are aimed to be tabled in Parliament every September. In addition, an independent mid-term review and summative evaluation is conducted six (6) months after the end of the report in collaboration with civil society.
Target achieved to date as of March 31, 2021: Attention required/Internal capacity and efficiency
- Tabling of the annual progress report for FY 2019/2020 was delayed due to operational constraints related to the COVID-19 pandemic. As a result, the report was tabled in Parliament in June 2020. Tabling of the 2020/2021 progress report was delayed due to the federal election on September 20, 2021.
- The mid-term review was delayed by the COVID-19 pandemic. It was launched in the summer of 2021 and is set to be completed in December 2021.
Baseline:
- Annual progress reports for the first Action Plan were often tabled 12 months after the end of the reporting year, both because it took a minimum of six months to finalize the report (to receive input from the Action Plan partners, draft, consult, approve, translate and edit), and due to operational requirements. A mid-term evaluation was conducted.
Activity:
- Table timely annual progress reports
- Conduct and publish mid-term review in FY 2019/20
- Conduct a summative evaluation in FY 2022/23
Indicator:
- Timely tabling of the annual progress reports on implementation of the Action Plan in Parliament, every September
Completed Activities:
- Conducted a survey for all departmental reporting Focal Points after the 2019/2020 reporting cycle to gain their feedback on the reporting progress.
- Hosted information sessions for all nine federal implementing partners on best practices for reporting.
- Facilitated one-on-one appointments to support focal points in reporting.
- Worked with GAC corporate reporting divisions to better align Action Plan reporting with other GAC corporate reporting processes.
- Held two CNAP Advisory Group Meetings, along with a special sessions on disarmament.
Results and Progress:
The fourth annual reporting cycle was launched in late spring 2021, shortly after the tabling of the 2019-2020 report. Coordination of the whole-of-government reporting process for the Action Plan conducted by PSOPs proceeded efficiently, with changes made to the tasking package and process to respond to the survey sent to all reporting focal points. PSOPs continued to build upon best practices from previous years. The reporting template and tasking package were updated to improve quality control and communication between the focal points and the GAC coordinator.
The difficulties faced in the previous year’s reporting cycle, as a result of the COVID-19 pandemic, were addressed as working from home became normalized. Extra training sessions were offered compared to the previous year, and recordings were made available to all focal points for later reference. One-on-one appointments were offered where needed. The training sessions and appointments covered both best practices on Action Plan reporting for the Government of Canada, and the importance and challenges of reporting results on the implementation of the WPS agenda. These training sessions were well received by government focal points; those who participated reported enhanced capacity to integrate lessons learned into their reporting and report on challenges in greater detail.
Efforts to undertake a mid-term review continued during the FY 2020/21, including through the establishment of a committee comprised of Government implementing departments and civil society, which defined the scope and focus of the midterm review. Due to the challenges brought about by the COVID-19 pandemic, the mid-term review process was delayed until the summer of 2021.The commitment to table progress reports in September has proved challenging to meet, even without the impacts of external factors such as the last two federal elections or the COVID-19 pandemic. There are several reasons for these delays, one being that the target doesn’t align well with other reporting cycles, such as development assistance programming at GAC; another is that the required time for approval processes, which differs between Action Plan partners, was under-estimated. PSOPs, as the coordinator of the Action Plan and owner of this target, will continue to strive for timely tabling. Based on the recommendations in the mid-term review, it will also consider how the reporting process can be more efficient to enable timely tabling.
2.3 Target: Tracking and reporting on Global Affairs Canada’s WPS-related funding is consistent and lends itself to year-over-year comparison by 2018/19.
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
- See results in Annex 3
Baseline:
- Global Affairs Canada began tracking and publishing department wide WPS-related funding in FY 2014/15. However, the results were inconsistent due to a variety of factors, including the differences in the project management systems and the subjective definition of WPS-related projects.
Activity:
- Develop a reliable method to track Global Affairs Canada’s WPS-related funding
- Track and report on WPS-related funding
Indicator:
- Uniform and efficient tracking of WPS-related funding
Completed Activities:
- PSOPs established a method of tracking WPS spending by Global Affairs Canada in FY 2017/18 that provides consistent results and allows for a year-over-year comparison. This method has been applied consistently since then, including in FY 2020/21, to track and report on WPS-related funding aligning with the five main objectives of the Action Plan.
Results and Progress:
PSOPs tracked WPS spending uniformly, efficiently and consistently throughout the fiscal year and included results in its annual report by applying the WPS tracker methodology. The methodology extracts information from the departmental database by applying a formula that combines GE codes, purpose codes created by the Organisation for Economic Co-operation and Development (OECD), and a list of selected fragile and conflict-affected states. GAC’s Gender Equality coding framework assigns a GE code in relation to a project’s intended contribution to advancing gender equality and the empowerment of women and girls. The sub-themes of the WPS agenda are captured by the select OECD purpose codes. By using the same methodology as in FY 2017/18, reporting on funding is consistent from year to year.
While helpful in measuring GAC’s WPS funding, the methodology has presented some limitations, notably that it does not report on what types of organizations receive funding.
Recognizing the urgent need to increase funding for women’s rights organizations, and the importance of data to measure progress in this regard, a target to this effect was added in 2019 (see target 2.1.4). However, the methodology for target 2.1.4 leaves out important investments made to women’s rights organizations through multilateral organizations unless the entirety of the investment meets the GE02 or GE03 threshold.
To address the lack of data on PSOPs funding of women’s rights organizations, discussions took place during FY 2020/21 with other teams in GAC on the relatively new GAC-wide tracking of funding to women’s organizations. Challenges with using existing mechanisms were discussed and areas for improvement have been identified and will be addressed as various reporting tools are updated in the department. For now, PSOPs will use a narrative form of reporting against target 2.1.4.
A methodology for tracking WPS-spending by other Action Plan federal implementing partners has not been developed.
2.4 Target: Robust, coherent, and clearly measureable indicators are established and used by 2018/19
Target achieved to date as of March 31, 2021: Target Achieved or Surpassed/Internal capacity and efficiency
- Indicators were reviewed and updated by all GAC focal points and implementing partners in FY 2018/19.
Baseline:
- Some of the indicators in the GAC implementation plan are not robust or easily measureable.
Activity:
- Improve indicators and tracking
Indicator:
- Global Affairs Canada indicators are improved and measureable
Completed Activities:
- Global Affairs Canada and federal government implementing partners, largely completed this activity in FY 2018/19. A minor review in FY 2019/20 resulted in changes to some indicators. No changes were made in FY 2020/21.
Results and Progress:
Enhanced clarity and consistency in reporting methodology has been attained in some targets by defining their indicators with greater details, allowing for clearer annual reporting data. Further efforts to improve upon the indicators and targets may be beneficial. However, this needs to be balanced against the requirement to demonstrate results year over year.
Priorities: Mainstream WPS and gender into PSOPs standard policies and procedures
2.5 Target: By the end of FY 2021/22, all policies, strategies, and processes systematically integrate gender perspectives.
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
- All key updated PSOPs tools and templates required to be filled out by partner organizations in order to receive funding from PSOPs (on the basis of which project proposals are assessed) integrate gender considerations and/or alignment with the WPS Agenda.
- Consultations are underway within PSOPs to consider how best to conduct a gender review of its internal processes by the end of FY 2021/22.
Baseline:
- WPS is a priority for PSOPs, gender is integrated in all aspects of the programs tools and templates to ensure that gender is mainstreamed in all PSOPs programming. PSOPs Interdepartmental Advisory Board will now also discuss WPS matters.
Activity:
- Conduct an external gender review of PSOPs internal processes
- Ensure the updated PSOPs strategy has a strong emphasis on WPS
- Continue to work to systematically integrate WPS and gender into policies, strategies, and processes
Indicator:
- # of the PSOPs tools, policies, and templates that address GE and WPS
- External gender review conducted of PSOPs internal processes
Completed Activities:
- The Strategic Planning and Coordination division continued to ensure that Women, Peace and Security priorities and targets are reflected in corporate and PSOPs-specific reports (Departmental Results Report, International Assistance Report, PSOPs' annual report, Mandate Letter Commitment Tracker, etc.).
- Changes have been made to the low dollar value projects business process to be more rapid and to better support local women’s organizations.
- The standard PSOPs contribution agreement was updated to include a clause which makes gender equality results reporting mandatory from project partners.
- PSOPs’ Gender Advisor continued to support the integration of gender at a project level and provided specialized advice and support to its officers and partners to improve capacity to plan, implement and report gender equality results and targets. The Gender Advisor initiated discussions on how PSOPs will continue the integration of gender in program policies, strategies and approaches.
- The Elsie Initiative updated its Strategic Plan in 2020-21 to better outline its approach to advancing Canadian policy leadership on women in peacekeeping, helping to advance an important part of the WPS agenda.
- Efforts are underway to examine how the Civilian Deployments Platform can better integrate gender into its processes, strategies or templates.
Results and Progress:
The grants and contributions business process continues to systematically integrate gender equality considerations. For example:
- The templates for PSOPs project documents were designed to ensure that all project proposals submitted to PSOPs include concrete gender results, indicators and targets; and that this was incorporated into the agreements for better compliance of the partner’s gender mainstreaming practice;
- Proposals included evidence-based inequality mitigation measures (Gender-Based Analysis Plus, (GBA Plus) or other contextual analyses);
- The PSOPs programming business process required that a gender assessment of project proposals was carried out jointly between the project officer and the gender advisor, and documented;
- When GE and WPS elements were deemed insufficient, improvements to proposals were negotiated with partners based on common Government of Canada policies/directives (existing policies, strategies or action plans);
- Recommendations from the PSOPs Gender advisor were monitored during project implementation.
The PSOPs Program Monitor met with women's organizations in both Haiti and Ukraine. Due to the COVID-19 pandemic and associated travel restrictions, the Program Monitor was unable to travel to Ukraine and conducted his interviews virtually. For the upcoming case study of PSOPs engagement in Colombia, the Monitor will continue virtual engagement with women`s organizations and other local stakeholders.
PSOPs’ analytical tools, products, and processes integrate GBA Plus and the WPS agenda to mainstream gender considerations in fragile and conflict-affected settings and identify specific Canadian entry points for the WPS agenda. The PSOPs-led conflict sensitivity guidance and training expands the mainstreaming of gender considerations across GAC and emphasizes the need for gender-sensitive conflict analysis. PSOPs also undertook facilitation training to promote the use and integration of GBA Plus into PSOPs’ business process.
Pre-deployment training delivered by PSOPs on Fragility, Conflict and Violence to outgoing Heads of Mission and Program Managers included WPS and GE components; in-depth training delivered to Heads of Mission and Program Managers included a dedicated WPS/GE session.
2.6 Target: PSOPs will systematically consider the WPS agenda and gender and intersecting identity factors in its policy work, in its contributions to the planning for civilian, police and military deployments, and during its assessment and scoping missions to ensure that PSOPs’ interventions are gender-responsive and integrate and promote the WPS agenda.
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
- GBA Plus and the WPS agenda were systematically applied by the majority of PSOPs officers.
- Canada chaired the UN Peacebuilding Commission (PBC) and included gender considerations while developing its co-chair leadership plan.
- GBA Plus and the WPS agenda were applied and integrated into the process of designing, planning and hosting the events and activities relating to Canada’s co-chair leadership with Uruguay of the WPS Focal Points Network in 2020-21. This included ensuring a diverse selection of external speakers and participants from civil society, academia and other WPS stakeholders were meaningfully consulted and engaged in all five online Network events Canada co-hosted in 2020.
- The Canadian Police Arrangement (CPA) integrated the WPS agenda in mission planning for all of its active CPA mission rotations (totaling 11 missions).
- CPA mainstreamed GBA Plus and the WPS agenda considerations in its official request for a five-year renewal of programming authority under the International Police Peacekeeping and Peace Operations Program (IPP Program).
- The Elsie Initiative continued to apply GBA Plus and advance gender and WPS in policy development and negotiations positions.
Baseline:
- In the FY 2016/17, GBA Plus and the WPS agenda were not systematically applied by PSOPs policy officers. Of programming and deployment assessment and scoping missions, 11 out of 15 (73%) included meetings with women’s groups and women’s ministries.
Activity:
- Apply GBA Plus
- Integrate WPS in PSOPs policy development, negotiation positions and interventions, and in the PSOPs contributions to planning for civilian, police and military deployments
- Include and engage with government officials working on gender issues, CSO, in particular women’s rights organizations, and/or relevant international organizations in all PSOPs assessment and scoping missions
Indicator:
- % of PSOPs officers that systematically apply GBA Plus and the WPS agenda in their work
- # of instances where PSOPs was engaged but the final document, deployment, or event did NOT integrate or promote the WPS agenda and/or gender considerations
- # and % of PSOPs’ project/program monitoring, assessment and scoping missions that did NOT include meetings with relevant CSO, international organizations, and/or government officials
Completed Activities:
UN Peacebuilding Commission:
- Canada chaired the UN Peacebuilding Commission (PBC) (January 2020 to February 2021) and the chairpersonship plan developed included an objective to integrate the gender dimensions of peacebuilding into all of the PBC’s country and regional discussions, strengthen the implementation of the PBC’s gender strategy, and strengthen the PBC’s role in implementing the youth, peace, and security agenda.
Focal Points Network:
- Canada co-chaired with Uruguay in 2020-21 the Women Peace and Security (WPS) Focal Points Network and co-hosted four virtual meeting with Uruguay throughout the year, inviting both respected experts as well as new voices to participate.
The Canadian Police Arrangement:
- The Canadian Police Arrangement (CPA) integrated the WPS agenda in mission planning for all of its active CPA mission rotations (totaling 11 missions). In addition, the CPA mainstreamed GBA Plus and included the WPS agenda in its official request for a five-year renewal of programming authority under the International Police Peacekeeping and Peace Operations Program (IPP Program).
- The CPA Program takes a feminist approach to police deployments. Gender considerations were systematically integrated throughout in-country preparations for a new police mission to the Democratic Republic of the Congo.
Elsie Initiative:
- The Elsie Initiative supported successful Canadian efforts to integrate considerations related to women in peace operations in policy development and negotiation processes during the reporting period, including in the 2021 Special Committee on Peacekeeping Operations (C34) report negotiations, the negotiations of the Hanoi Plan of Action II of the Association of Southeast Asian Nations (ASEAN) Regional Forum adopted by ARF Foreign Ministers, and the process to develop positions on UN peacekeeping mission mandates.
- All officers in the Elsie Initiative applied GBA Plus and advanced WPS in their work, in particular by advancing the meaningful participation of diverse groups of women in UN peace operations and ensuring diverse groups of stakeholders, in particular women peacekeepers, were given platforms to speak about their experiences in UN peace operations during Elsie Initiative advocacy events.
- As part of the mission mandate policy development exercise led by IRP, the Elsie Initiative produced a guidance note for lead officers on how to integrate considerations related to women in peace operations into the development of Canada’s positions on peacekeeping mission mandates.
ASEAN Regional Forum:
- In August 2019, Canada led the development and co-sponsorship of the Joint Statement on Promoting the Women, Peace and Security Agenda at the ASEAN Regional Forum (ARF). This Statement works to ensure that the ARF continues to effectively carry out its preventive diplomacy goals, by recognizing the different and at times disproportionate negative impact that armed conflict has on women and girls.
- In March 2021, Canada, Indonesia, and Thailand developed and co-chaired the first ASEAN Regional Forum (ARF) Workshop on the UNSC resolutions on WPS.
Results and Progress:
In a survey of PSOPs officers, 37 out of the 39 (or 95%) officers participating responded that they applied GBA Plus analysis in their work. This sample represents a little over 50% of PSOPs officers.
PSOPs continues to incorporate GBA Plus and the WPS agenda into its conflict analyses, highlighting the WPS agenda and making specific references to the Action Plan. Gender considerations featured prominently in analytical products to ensure gender-responsive Canadian interventions, as well as opportunities for Canada to play a role in increasing the participation of women and youth in peacebuilding and conflict prevention. PSOPs continues to work on developing a roster of vetted GBA Plus and WPS-aligned partners and stakeholders with whom to engage.
Peacebuilding Commission:
The informal phase of the 2020 UN Peacebuilding Architecture Review (PBAR), facilitated by Canada as PBC Chair, included a virtual consultation on WPS as one of four consultation areas. One of the outcomes of the meeting was a chair`s summary, which contributed recommendations on the participation of women in peacebuilding. A negotiated outcome document on the informal phase of the review was transmitted to the UN Secretary-General as well as the presidents of the Security Council and General Assembly. Canada’s ambassador to the UN made a video statement to set the framing for the consultation, and Canada provided a written submission.
Canada’s statements and submissions to the other PBAR consultations (UN transitions, Financing and Partnerships, and Institution Building and System-wide Engagement) all mainstreamed aspects of the Women, Peace, and Security agenda.
Over the course of the pandemic, Canada also leveraged its co-chair of the International Dialogue on Peacebuilding and Statebuilding (IDPS) to convene trilateral dialogues on the COVID-19 situation in fragile and conflict-affected states between development partners, national governments, and local civil society organizations. These discussions took place under the framework of the IDPS 2019-2021 Peace Vision, through which the IDPS membership have agreed to prioritize the promotion of national cohesion; gender equality and the women, peace and security agenda; and a peace-promoting private sector.
Canada’s co-chair with Uruguay of the Women Peace and Security (WPS) Focal Points Network:
Canada’s co-chair with Uruguay in 2020-21 of the Women Peace and Security (WPS) Focal Points Network leveraged the opportunity to mark the 20th anniversary of UNSCR 1325 to encourage more open and honest conversations and increased collaboration between the Focal Points and civil society actors on the challenges and opportunities for fully implementing the WPS agenda into peace and security policy and programming. Canada co-hosted five online Network events in 2020 on the co-chairs’ main theme of “demonstrating leadership and taking concrete action to advance the WPS Agenda” with an emphasis on “supporting and protecting women peacebuilders” and “creating and implementing impact-driven WPS action plans”.
The COVID-19 pandemic public health restrictions in March 2020 resulted in the cancellation of a two-day in person meeting of the WPS Focal Points Network scheduled for May 2020 in Ottawa. Plans for a two-day meeting was replaced with a series of five virtual/online events over the course of 2020:
- May 13, 2020: Special Session on WPS and COVID-19: Canada and Uruguay co-hosted a 90-minute special session where WPS Focal Points and women peacebuilders shared their current challenges, innovative ideas and best practices for how both Member States and civil society organizations could continue to advance the WPS agenda during the COVID-19 pandemic.
- July 15, 2020: (High Level) Intergenerational Discussion to Mark the 20th Anniversary of UNSCR 1325: Lessons for Leadership on Women, Peace and Security - Past, Present and Future.
- 9 September, 2020: WPS Focal Points Working Group on Supporting and Protecting Women Peacebuilders provided space for women peacebuilders and Focal Points to engage in small groups to identify challenges, opportunities and concrete actions to improve their support and protection.
- 30 October, 2020: High Level Event to mark the 20th Anniversary of UNSCR 1325, at which the Minister of Foreign Affairs announced:
- New investments of $9.9 M to support women peacebuilders globally, in addition to $5 M dedicated to grassroots women peacebuilders, for a total of $14.9 M;
- The creation of an annual Women, Peace and Security Awards program to highlight excellence in research and civil society leadership. The program was launched in March 2021 with a call for nominations through Canada’s diplomatic missions abroad, federal partners of Canada’s National Action Plan on WPS, and the Women, Peace and Security Network of Canada.
- A year-long global advocacy campaign “Peace by Her” was also launched in March 2021 through Canada’s network of diplomatic missions worldwide to recognize, support and protect the important work of women peacebuilders.
- These new initiatives aim to address some key challenges to implementing UNSCR 1325 and subsequent resolutions on Women, Peace and Security. Challenges include: insufficient and inadequate funding of the work of women peacebuilders, including at the grassroots level; lack of recognition for the vital contributions they make to advancing peace and security; threats and attacks against them based on their work and gender; and gaps in the evidence base in support of implementation of the WPS agenda.
- 7 December, 2020: Working Group on Impact-Driven Action Plans was an opportunity for the WPS Focal Points to engage with key WPS experts in an open and honest dialogue on their current challenges as well as innovative practices and plans for implementing the WPS agenda through their national and regional action plans.
Despite challenges posed by the pandemic outbreak during Canada and Uruguay’s co-leadership of the Network, the pivot to hosting virtual meetings resulted in increased opportunities for the national WPS Focal Points to meet more easily and frequently. The virtual format also supported greater civil society and academic participation in Network meetings.
Lessons were learned on how to plan and manage virtual meetings of the Network, including with interpretation in English, Spanish, French and American Sign Language, and using multiple virtual break out rooms. However, while virtual meetings have positive aspects, in person meetings remain important to forge connections and build trust between the WPS Focal Points, and with civil society partners, that are important to ongoing cooperation and progress on the WPS agenda.
It was a challenge to both identify and confirm new speakers from different geographic regions and diverse and intersectional perspectives, and well as ensuring discussions were intergenerational. Overall, the WPS unit, and the WPS Focal Point Network, now has a stronger list of diverse speakers on WPS as well as experience in adding to that list for future events.
Canada’s application of a GBA Plus approach as co-chair of the WPS Focal Points Network with Uruguay in 2020-21 helped to increase diversity and support for a more inclusive WPS agenda in the Network discussions. This helped to strengthen the Network’s role as the main international forum for collaboration on implementing WPS agenda between Member States and other key WPS stakeholders in academia and civil society. As a benchmark of this progress, Network included 89 Member States as of March 31, 2021: an increase from 72 in January 2020.
PSOPs provided funding to the Women Peace and Security Network – Canada (WPSN-C) to convene special meetings of Canadian and international WPS civil society actors in August 2020 and to create a set of recommendations to the WPS Focal Points Network for the 20th anniversary of UNSCR 1325. These recommendations were delivered to the WPS Focal Points Network in a report “Priorities for Action” that was launched in a public, virtual meeting hosted by the WPSN-C on October 2, 2020.
The Canadian Police Arrangement:
Over the course of 2020-21, the COVID-19 pandemic added pressure on both the deployment and recruitment of police officers into the CPA program. Through a gender-based analysis plus (GBA Plus) lens, the CPA took various approaches to increasing deployment numbers in spite of the challenges associated with the pandemic, including, for example, by developing specialized police teams that promote Canada’s thematic priorities, such as the WPS agenda and combatting sex and gender based violence and conflict related sexual violence. In relation to the above, the CPA successfully inaugurated a new Specialized Police Team (SPT) to the DRC under the auspices of the United Nations Organization Stabilization Mission (MONUSCO). Led by Canada, this 8 person SPT (5 Canadians, 2 Swedes, and 2 Tanzanians) is building the capacity of the Congolese National Police to counter sexual and gender-based violence among vulnerable populations.
The CPA contributed investigative expertise in support The Gambia’s case entitled Application of the Convention on the Prevention and Punishment of the Crime of Genocide (The Gambia v. Myanmar) at the International Court of Justice (ICJ). In total, the CPA conducted 28 trauma-informed, gender-sensitive interviews with alleged survivors and witnesses of most serious crimes of concern to the international community, including the crime of genocide. In all of its missions, the CPA applied GBA Plus in assisting local police organizations to better understand the differentiated impacts of conflict on women, and to better incorporate women’s perspectives in investigations, stabilization and peacebuilding efforts. Additionally, the CPA consistently worked to remove barriers in order to allow for increased participation of Canadian women police officers in the program, particularly in senior leadership roles, which aligned with the priorities of Canada’s flagship Elsie Initiative on Women in Peace Operations.
Elsie Initiative on Women in Peace Operations:
During 2020-21, the Elsie Initiative continued to apply GBA Plus and advance gender and WPS in policy development and positions. For example, the Elsie Initiative supported efforts to integrate gender and WPS considerations during the negotiations of the 2021 Special Committee on Peacekeeping Operations (C34) report, leading to an increase in the number of gender-responsive recommendations in comparison to the 2020 report (increase from 8% to 9% of recommendations) and securing the first ever recommendation related to addressing the issue of sexual harassment within peacekeeping missions, which has been identified as one of the most significant barriers to women’s meaningful participation in UN missions. Similarly, the Elsie Initiative was able to support Canada’s Permanent Mission to ASEAN to secure a reference to promoting women’s empowerment in peace and security processes and integrating WPS into peacekeeping operations as an area for cooperation among ARF members in the Hanoi Plan of Action II (2020-25). The Elsie Initiative team further provides comments on mission mandate reviews with an intersectional lens, ensuring they are gender-responsive and consider intersecting identity factors, while also producing a guidance note to support lead officers. Finally, when selecting participants to attend and/or receive support to attend Elsie Initiative for Women in Peace Operations events, Canada takes into account intersecting identity factors, including geographic and racial identities to ensure that a diversity of voices is represented.
As one of the co-chairs of the United Nations Peacekeeping Ministerial (UNPKM) process, Canada worked closely with the organizers to ensure that WPS, and in particular the meaningful participation of women in peace operations, would form an integral part of discussions and outcomes of the next UNPKM, scheduled to take place in Seoul, Republic of Korea, in December, 2021. As part of these efforts, in November 2020, Canada co-hosted with Bangladesh and the United Kingdom the first preparatory session for the UNPKM 2021, during which it organized and chaired a session specifically dedicated to WPS in peacekeeping transition contexts. This session helped cement the importance of ensuring the meaningful participation of women, including uniformed women, in all stages of transition from peacekeeping to peacebuilding, from planning to implementation.
Priorities: Strengthen WPS and gender capacity within PSOPs
2.7 Target: By the end of FY 2021/22, PSOPs significantly strengthens its gender expertise.
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
- 77.1% (37/48) of PSOPs officers responding to the survey (including project officers) have completed GBA Plus training, and 50% (24/48) have completed training on gender in fragile and conflict affected states. The survey response rate was roughly 50%.
- 100% (7/7) civilian deployees (5M/2W) completed the GBA Plus course
- 29% (2/7) (1M/1W) completed virtual synchronous training on gender in fragile and conflict-affected states.
Baseline:
- In FY 2016/17, PSOPs had no gender advisors, but 3 gender focal points who were responsible for reviewing projects from a gender perspective. 60% (15) of PSOPs programming officers and their supervisors completed a gender (including GBA Plus) or WPS course. No reliable data exists for civilian deployees on GBA Plus training prior to 2017-18 and the gender in in fragile and conflict-affected states training was first introduced to staff in 2017/18. Prior to that, only 2 PSOPs project officers and one civilian deployee had attended the course offered by the UK in London.
Activity:
- Ensure officers and deployed civilian experts are trained on WPS and gender
- Make it mandatory for all officers take the Department of Women and GE online GBA Plus training
- Employ a gender advisor to provide technical expertise by the end of FY 2018/19
Indicator:
- % and # of PSOPs officers and their supervisors that completed a gender or WPS course
- % and # of civilian deployees that completed the GBA Plus course
- % and # of civilian deployees that completed in-classroom training on gender in fragile and conflict-affected states
Completed Activities:
- Training needs surveys were completed on: 1) WPS and gender in FCAS and 2) conflict sensitivity and the Triple Nexus, the first of which informed the design of an online course to address these gaps.
- Worked with training providers to convert existing training on integrating Gender into Peace and Security Programming to an online format.
- Integrated a presentation by the WPS ambassador into pre-posting training for Heads of Mission.
- Developed cross-stream conflict sensitivity training to roll out to geographic programs that stresses the importance of unpacking gender and conflict dynamics, as well as potential unintended risks and opportunities associated with our interventions
- Expanded coverage and integration of gender and WPS in onboarding training for new PSOPs staff, also inviting other GAC stakeholders to attend sessions.
Results and Progress:
With a regular turnover in staff, the number and percentage of PSOPs deployees and staff who have completed online introductory GBA Plus training year over year can fluctuate. Nevertheless, the overwhelming majority of staff have completed at least one course on gender: 77.1% of those who reported (37/48Footnote 5), and deployees: 100% (7/7 total, with response rate of 100%.
A challenge for PSOPs training was that only one of the three in-house gender courses that was relevant to PSOPs officers, (and available the prior year) was offered in 2020-21. However, efforts were set in motion to address lingering gaps in WPS training in the bureau, including by targeting specific, stand-alone training. WPS was also integrated more substantively into existing pre-posting and onboarding training. This increase has allowed PSOPs to train influential strategically salient groups (especially Heads of Mission) in greater numbers overall and to engage with new colleagues about the gendered nature of peace and security work and the specific challenges and opportunities involved. Training efforts during this period were further complemented by increased dialogue and training on anti-racism, diversity and inclusion.
PSOPs invested resources in preparing conflict-sensitivity and nexus training, both stressing the importance of taking a context-driven approach. Conflict sensitivity training developed for geographic programs was designed with clear emphasis on the need to ensure robust conflict analyses, while unpacking the gender and conflict dynamics. The training covers in detail the tools to support bureaus in considering the potential unintended risks and opportunities associated with our interventions. This includes risks related to potential harm to beneficiaries, including women, girls and other vulnerable groups, as well as opportunities to strengthen inclusion, including in relation to strengthening the capacity of women to engage in peacebuilding.
Challenges:
Due to the COVID-19 pandemic training was converted to an online environment as a result some training was revised or put on hold. The increased strain on training resources associated with hosting online sessions limited the pace of progress on developing new training. Another challenge was the tracking of training rates over time with low response rates to surveys and the frequent rotation of staff.
2.8 Target: By the end of FY 2021/22, all thematic training on working in fragile and conflict-affected states systematically integrates gender perspectives.
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
- 100% (2/2) of courses led by PSOPs and offered in 2020-21 integrate gender policies, perspectives and/or analytical tools.
Baseline:
- Inconsistent integration of gender perspectives across training content.
Activity:
- Work with training providers and subject-matter experts to be more systematic and explicit in their integration of gender perspectives
Indicator:
- # and % of courses led by PSOPs that integrate gender policies, perspectives and/or analytical tools
Completed Activities:
- Worked with training providers and subject-matter experts to conduct training needs analyses to inform adjustments to existing gender in FCAS training, as well as the development of new training to address and advance the WPS agenda
- Planned new training to specifically target departmental staff and raise awareness of the WPS agenda, how to further it, and how to leverage Canada’s commitments in the Action Plan.
- Expanded the integration of gender into informal orientation sessions, in particular in opening sessions and those covering risk and performance measurement.
Results and Progress:
The entire suite of FCAS-related training offered by Global Affairs Canada covers and builds skills in one or more of the following: GBA Plus; raising awareness of Canada’s feminist foreign and international assistance policies; and improving people’s understanding of Canada’s National Action Plan on WPS. Results of needs analyses offered a clearer picture of key learning gaps enabling better planning to address those gaps.
Challenges:
The pandemic slowed course delivery and progress on course updates in 2020/21. The challenge remains to finalize new training and adjust existing training to go beyond gender integration to better incorporate intersectional perspectives and analyses.
Priorities: Dedicate resources for the Action Plan
2.9 Target: By the end of the FY 2017/18, the management and coordination of the Action Plan’s implementation is supported with sufficient financial resources, and several officers FTEs.
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
- 6 FTEs: WPS Unit maintained a unit with five full-time officers in addition to the deputy director.
- PSOPs has maintained a dedicated budget for Action Plan implementation, including the annual progress reports.
Baseline:
- Two officers responsible for the WPS policy and coordination of the Action Plan in FY 2016/17. Operational budget is earmarked for expenses related to the Action Plan management.
Activity:
- Improve coordination within Global Affairs Canada and across Action Plan partners for better integration and implementation of the Action Plan
- Ensure continuous operational budget for progress reports, consultations, and evaluations
Indicator:
- # of FTEs dedicated wholly to WPS policy and the coordination of the Action Plan
- Dedication of budget for the annual progress reports on the implementation of the Action Plan, consultations, and evaluations
Completed Activities:
- WPS unit hired additional staff for a total of five full-time equivalent (FTE) officers
- PSOPs allocated funding for the progress report (translations and editing) and upcoming mid-term evaluation.
Results and Progress:
During FY 2020-21 the WPS Policy Unit has a team of one deputy director, five policy advisors and one part-time student. All were dedicated wholly to WPS policy and the coordination of the Action Plan. PSOPs allocated operational budget expenses related to the work, in particular for the annual progress reports (editing and translation). In addition, with the creation of the Office of the Ambassador for Women, Peace and Security in June 2019, capacity to improve cross-government coordination of the implementation of the Action Plan continued to increase.
Priorities: Address SEA (together with other implementing partners)
2.10 Target:
- By the end of FY 2021/22, Canada demonstrates a substantial contribution to the implementation of the UN’s zero tolerance policy on SEA.
- By the end of FY 2021/22, Canada addresses gaps in accountability for Canadian personnel deployed to UN operations.
Target achieved to date as of March 31, 2021: Mostly on track/2.10.1 and 2.10.2 /Objective 2
Target 1: Canada demonstrates a substantial contribution to the implementation of the UN’s zero tolerance policy on SEA:
- In FY 2020/21, Canada continued to be a strong advocate for and financial supporter of the full implementation of the UN’s zero-tolerance policy on SEA, and to urge Troop- and Police-Contributing Countries, as well as UN agencies and other international actors, to uphold their obligations to take measures to prevent SEA, to investigate allegations and to take action.
- Canada continued to raise awareness for its staff by sending targeted communications within the department to clarify procedures, announce new initiatives and to ensure a coordinated approach to prevention and response to SEA. For instance, in May 2020, a specific communication was sent by senior management to project team leads and staff in missions abroad aimed at reminding GAC staff of the importance of preventing and responding to SEA, especially during the COVID-19 pandemic to ensure that our programs, actions and behaviours remain grounded in respect for human rights, gender equality and the responsibility to do no harm. This communication to staff also reminded them of the department’s expectations, international commitments and the PSEA resources available.
- Canada continued to work with its UN and NGO partners to strengthen and rigorously implement safeguarding policies, improved hiring practices and prevention, whistleblowing protections, and potentially new system-level mechanisms.
- Canada demonstrated active support for the UN's SEA Victims' Rights Advocate and Special Coordinator in order to continue to improve approaches to addressing SEA and ensuring their implementation. Canada also participated actively in the Circle of Leadership on the prevention of and response to SEA in UN operations, and sought to strengthen UNGA 5th Committee resolution on cross-cutting issues, including on SEA.
- Canada updated a clause to the standard terms and conditions for contribution agreements that requires organizations delivering development assistance to have a code of conduct in place addressing SEA to be considered for funding. This clause also includes a new provision on reporting expectations.
- Canada continues to deliver and promote an online SEA training module available in both official languages, available to all GAC staff to build SEA capacity internally. Canada has also been conducting information session to various bureaus across the department.
- Canada worked with many partners to streamline the prevention, response to and ending of impunity for sexual exploitation and abuse (SEA) in humanitarian action, and supported targeted programming to that effect. GAC provided $500,000 in humanitarian assistance to the International Organization of Migration for the Whole of Syria Inter-Agency Protection from SEA program. Support and training was provided to UN organizations and NGOs, which led to system strengthening with direct programmatic impact. Through this support, coordination and response to PSEA was significantly improved in northern Syria in 2020.
- Working with the Netherlands and United Kingdom, Canada championed adoption of a standalone decision at the 148th session of the World Health Organization (WHO) Executive Board in January 2021 to strengthen the WHO Secretariat’s efforts to prevent and address sexual exploitation, abuse and sexual harassment (SEA/SH), including during health emergencies. The decision calls on the WHO to ensure its policies and procedures are survivor-centred and fully aligned with United Nations system-wide and Inter-Agency Standing Committee (IASC) initiatives. The WHO is expected to report quarterly to Member States on implementation of this decision. Canada continues to closely follow progress on this file and to play a leadership role at the WHO in the area of prevention of SEA/SH and in gender equality, equity, and rights.
- In 2020-2021, Canada continued to be a strong advocate for and financial supporter of the full implementation of the UN’s zero-tolerance policy on SEA, and to urge Troop- and Police-Contributing Countries, as well as UN agencies and other international actors, to uphold their obligations to take measures to prevent SEA, to investigate allegations and to take action.
- Canada, in its national capacity, worked actively to ensure that the 2021 report of the Special Committee on Peacekeeping Operations (C34) continued to include a strong focus on the issue of SEA, with emphasis on a victim-centered approach and victim assistance. Canada was successful in ensuring inclusion of accountability, discipline measures and/or criminal prosecution where appropriate across the full system, including for non-United Nations personnel.
- Canada continued to work with its UN and NGO partners to strengthen and rigorously implement safeguarding policies, improved hiring practices and prevention, whistleblowing protections, and potentially new system-level mechanisms.
Target 2: Canada addresses gaps in accountability for Canadian personnel deployed to UN operations:
- Canada, through its Peace and Stabilization Operation Program has provided $300K from 2017-2021 to the UN SEA Victim’s Trust Fund. This unique fund contributes to restoring the dignity of survivors and children born of SEA, help break stigma, and facilitate their reintegration within their communities. Canada’s funding is earmarked supporting the work of the fund in CAR, DRC, Haiti and Liberia.
- Strict measures are currently in place to prevent and respond to eventual SEA allegations involving Government of Canada civilian personnel, as well as members of the Canadian Armed Forces, and of the Royal Canadian Mounted Police participating in UN operations.
- No new allegations of SEA against Canadian peacekeepers were made during the reporting period. All previous cases involving Canadian peacekeepers are considered satisfactorily closed by the UN.
Baseline:
- Allegations of SEA in UN operations continue to emerge, including incidents involving Canadian peacekeepers. From 2013 to 2017, six substantiated allegations of SEA, which involved Canadian police peacekeepers, were reportedFootnote 6. Canada’s existing reporting, investigating and accountability mechanisms are being used to their full extent. Nevertheless, gaps exist that preclude the UN and Canada from ensuring that perpetrators may be brought to justice in all appropriate cases.
Activity:
- Develop Canada’s Strategy and Action Plan to address SEA by peacekeepers.
- Work within Global Affairs Canada and partner with departments to improve SEA prevention measures and address gaps in Canadian accountability framework.
- Note: Other important SEA activities are carried out as defined by other Action Plan partners and by Global Affairs Canada through Canada’s Permanent Mission to the United Nations in New York.
Indicator:
- Degree to which [low, medium, high] Canada’s Strategy and Action Plan to address SEA is developed and endorsed
- Degree to which [low, medium, high] identified gaps in Canada’s accountability frameworks were addressed
- # of Canadian proposals and initiatives to address SEA implemented by the UN and by other Member States
- % of SEA cases against Canadian peacekeepers or Canadian staff by the Government of Canada to the UN that resulted in either an exoneration, disciplinary measures, or a criminal case
Completed Activities:
Target 1 - Canada demonstrates a substantial contribution to the implementation of the UN’s zero tolerance policy on SEA:
- Canada continued to advocate for an end to SEA and a zero-tolerance policy through the UN Military and Police networks.
- Canada continued to serve as a member of the UN’s Circle of Leadership to end SEA, and to participate in the new Group of Friends to Eliminate Sexual Harassment in the UN. Canada sought to strengthen UNGA 5th Committee resolution on cross-cutting issues, including on SEA.
- Along with Australia and New Zealand, Canada delivered a statement to UNGA 4th Committee that condemned SEA and pledged support to UN’s zero tolerance policy.
- Canada played an active role in ensuring that SEA and sexual harassment are kept as an annual standing item on the agenda of the Executive Boards and that the Agencies kept these Boards (which Canada actively engages in) informed on matters of SEA as well as sexual harassment.
- Since the establishment of the PSEA unit in April 2018, Global Affairs Canada (GAC) has been actively participating in the OECD-DAC PSEA Reference Group, under the framework of the DAC Recommendation on Ending Sexual Exploitation, Abuse, and Harassment in Development Co-operation and Humanitarian Assistance: Key Pillars of Prevention and Response.
- GAC’s PSEA Unit has been an active member in the UK Safeguarding Technical Working Group meetings since 2018. The group aims to mobilize the UN Zero tolerance policy and other multilateral commitments to collectively address and respond to SEA. In June 2020, donors noted two challenges that required further discussion, on which basis two informal groups continue to meet to study and discuss specific challenges, concerns, lessons learned and best practices in regards to (1) Investigations/Case Management and (2) Employment Accountability. Our participation in these groups helps inform international best practices and shape the approach we take to prevent and respond to SEA.
- In May 2020, a specific communication was sent by senior management to project team leads and staff in permanent missions at the UN and other missions abroad aimed underlining the importance of preventing and responding to SEA, especially during the COVID-19 pandemic to ensure that our programs, actions and behaviours remain grounded in respect for human rights, gender equality and the responsibility to do no harm. This communication also restated the department’s expectations, international commitments and the PSEA resources available.
- Canada continued to work with other donors, multilateral organizations and civil society to prevent and respond to SEA in the delivery of international assistance as well as peace operations, through active support for training initiatives, active participation in multilateral prevention and coordination efforts such as the UN’s Special Coordinator on SEA and the SEA Victim’s Rights Advocate, and the adoption and implementation of prevention and accountability measures at the national level. This includes the requirement for Canada’s international assistance partners to adopt a Code of Conduct to prevent, investigate and respond to SEA.
- In January 2021, the Minister of International Development officially launched Digna. Digna is a PSEA Sector Hub to strengthen the capacity of civil society organizations in Canada to prevent and respond to SEA in the delivery of international assistance. Resources, trainings and other services are being developed and delivered by the PSEA Sector Hub to address and to help close existing PSEA capacity gaps in the sector with an emphasis on supporting small and medium sized organizations.
- In February 2021, during the annual dialogues with civil society, GAC and partners included a session dedicated to preventing and responding to SEA.
- Since 2021, GAC has been working to integrate SEA language in contracts and across the project cycles. In February 2021, guidelines for the Canada Fund for Local Initiatives (CFLI) were updated to include guidance on PSEA. The PSEA Unit is finalizing negotiation for the inclusion of PSEA clauses in project standard grant agreements with UN development partners. There is also ongoing work to include sexual misconduct clauses in remaining agreements and contracts (i.e. RFPs, CFLI).
- In August 2020, GAC implemented a clause for contribution agreements requiring partner organizations signing a new contribution agreement to have or develop a publicly available Code of Conduct on prevention and response to sexual exploitation and abuse within six months of signing the agreement. This was also updated to include a reference to GAC’s reporting expectations. This update was then incorporated into our grant agreement templates in October 2020.
- In January 2021, working with the Netherlands and United Kingdom, Canada championed adoption of a standalone decision at the 148th session of the World Health Organization (WHO) Executive Board to strengthen WHO Secretariat’s efforts to prevent and address sexual exploitation, abuse and sexual harassment (SEA/SH), including during health emergencies. The decision calls on the WHO to ensure its policies and procedures are survivor-centred and fully aligned with United Nations system-wide and Inter-Agency Standing Committee (IASC) initiatives. The WHO is expected to report quarterly to Member States on implementation of this decision. Canada continues to closely follow progress on this file and to play a leadership role at the WHO in the area of prevention of SEA/SH and in gender equality, equity, and rights.
- In February 2021, Canada and other OECD members welcomed UNICEF and UNHCR as new adherents to the OECD-DAC Recommendation on Ending SEAH in Development Co-operation and Humanitarian Assistance, during which the OECD; at that time, UNFPA also signaled their intention to request adherence.
- Canada continued to advocate and negotiate for the full implementation of the recommendations from the UN Secretary General’s annual Special Measures reports and other reviews, including through Canada’s chairing of the New-York-based Group of Friends on Women Peace and Security, the Group of Friends on Children and Armed Conflict, and through the UN General Assembly’s Special Committee on Peace Operations, among other mechanisms.
- Canada has contributed $300,000 to the UN Trust Fund in support of the Victims of SEA (2017-2020), and $300,000 to the Office of the Special Coordinator. The UN Trust Fund is designed to provide:
- Specialized services, which provide assistance and support required by victims and children born as a result of Sexual Exploitation and Abuse, including medical care, legal services, and psycho-social support;
- Address service gaps in the provision of assistance and support;
- Community outreach;
- Additional support and communications for complainants, victims and children born as a result of Sexual Exploitation and Abuse.
- Canada supports pre-deployment e-training for peacekeepers on preventing and combatting SEA through the Peace Operations Training Institute. This training is provided globally and available on and offline to all peacekeepers. Canada also recently supported an update to UN scenario-based training which now reflects the complex environment of UN peace operations, including modules on preventing and responding to SEA.
- Since May 2016, Canada has deployed a military legal officer to support the Special Coordinator on improving the UN’s response to Sexual Exploitation and Abuse.
- Government of Canada civilians deployed overseas remain subject to a variety of measures, including disciplinary measures, for violations of the Values and Ethics Code for the Public Sector, the Directive on Conflict of interest, the Public Service Employment Act and organizational Codes of Conduct.
- Any allegation or report of intimate or sexual relations between deployed RCMP personnel and members of the local population, consensual or otherwise, is investigated and when an officer is found to be in breach of the RCMP policies, they are immediately repatriated. Canadian police partner agencies must agree to cooperate in any investigation initiated by the Host Organization (e.g. United Nations), and, when warranted, initiate a criminal and/or Code of Conduct investigation into allegations of serious misconduct. Further, Canadian police officers in breach of this policy will not be considered for future deployments under the International Peacekeeping and Peace Operations Program (IPP).
- Deployed CAF members are subject to Canada’s Code of Service Discipline, which establishes jurisdiction over service offences, including minor breaches of military discipline and uniquely military offences, and Canadian criminal offences. Allegations of SEA are investigated by the CAF and charges may be laid in accordance with the National Defence Act, with subsequent prosecution by court martial.
Target 2: Canada addresses gaps in accountability for Canadian personnel deployed to UN operations:
- Canada strongly advocated for inclusion of new language on SEA in the C34 report and raised the issue of SEA in a variety of UN fora, including during a UNSC Open Debate on Peacekeeping and Human Rights.
- Canada continued to support the UN SEA Victim’s Trust Fund ($300,000 in 2020-21) and to engage with UN officials on plans for an upcoming SEA High-Level Meeting and for the sharing of information amongst Member States.
Results and Progress:
Canada continued to work with other donors, multilateral organizations and civil society to prevent and respond to SEA in the delivery of international assistance as well as peace operations, through active support for training initiatives, multilateral prevention and coordination efforts, and accountability measures at the national level.
Canada, through its Mission to the UN, continued to be a steadfast partner of the UN in its efforts to prevent and eradicate SEA and to exert pressure to improve prevention of and response to SEA. Canada continued to support the activities of the Circle of Leadership on the prevention of and response to SEA in UN operations and proposed language in UNGA 5th Committee and C34 negotiations to strengthen the UN’s response. These actions complement and extend the ongoing financial and in kind support provided by Canada to both the United Nations Trust Fund on SEA and the Office of the Special Coordinator on SEA.
Since its creation in 2018, the Preventing Sexual Exploitation and Abuse (PSEA) Unit has been an active member in the United Kingdom Safeguarding Technical Working Group meetings. In June 2020, donors noted two challenges that required further discussion, and on this basis two informal groups continue to meet to study and discuss specific challenges, concerns, lessons learned and best practices in regards to (1) Investigations/Case Management and (2) Employment Accountability. Our participation in these groups helps guide the approach we take to prevent and respond to SEA, as well as form international best practices.
This year, Canada contributed to the first Interim Monitoring Survey for implementation of the DAC Recommendation on Ending SEA and SH, shared by the OECD-DAC PSEA Reference Group. Having just passed the two-year anniversary of the adoption of the DAC Recommendation, this survey will support the monitoring process of implementation of the Recommendation and provide information to support further peer learning.
Global Affairs Canada (GAC) continued to ensure partner accountability for SEA prevention and response by communicating clear expectations to partners. This includes updating and standardizing sexual misconduct clauses in all agreements, thereby requiring all partners have a code of conduct that explicitly addresses SEA and that partners report, investigate and respond to credible allegations of SEA. The PSEA Unit continues to coordinate internally to discuss the integration of PSEA throughout the project cycle.
Through a collaborative partnership with Cooperation Canada (formerly CCIC), Digna - The Canadian Centre of Expertise on the Prevention of Sexual Exploitation and Abuse, is helping close PSEA capacity gaps in the sector. Emphasizing a survivor centered approach, Digna serves Canadian partners (especially SMOs in full) through online resources, toolkits and training. In addition to helping partners meet increasingly robust PSEA expectations, Digna facilitates the national reflection process on PSEA in international assistance, while also engaging with likeminded global initiatives and stakeholders. The official launch of Digna took place in January 2021 with the participation of the Minister for International Development.
Canada maintained a focus on coordination and coherence on all PSEA lines of effort as reflected by the UN in the most recent UNSG report on SEA. Canada’s PSEA Unit within Global Affairs Canada continued to lead on coordination of PSEA efforts across the department and to facilitate coordination between GAC and other government departments and agencies.
During the reporting period, Canada worked to ensure that the 2021 report of the Special Committee on Peacekeeping Operations (C34) of the UN General Assembly continued to include a strong focus on the issue of SEA, with emphasis on a victim-centered approach and victim assistance.
In particular, Canada successfully ensured the inclusion of concrete references to accountability, disciplinary measures and/or criminal prosecution where appropriate across the UN system, including for non-United Nations personnel.
Canada also successfully negotiated the inclusion of a recommendation on creating and maintaining a work environment that prevents all forms of misconduct as part of individual performance objectives for all civilian staff, with a specific focus on senior leadership.
Canadian financial support for the UN Trust Fund on SEA, for SEA-related training, as well as the Canadian deployment to the office of the UN SEA Coordinator, continues to help ensure that personnel deployed to UN operations receive the training and support required to prevent and address instances on SEA, and that the UN has the tools necessary to ensure adequate coordination and information within the UN system and between the UN and Member States, particularly troop and police contributors.
The impact of the COVID-19 pandemic on reported rates of SEA remains unknown; however, research suggests rates of SEA and other forms of abuse increase during crises. Increased rates of reporting of allegations may increase demand for victim services and support. Implementation of the UNSG’s zero-tolerance policy on SEA continues, though serious accountability gaps remain for both UN and international personnel. Canada continues
A renewed focus on a whole-of-system approach to prevention at the UN is reflected in Canada’s continued focus on coordination and coherence across GAC and other government partners.
Priorities: Increase the number and role of women in peace operations
2.11 Target: Canada takes concrete steps to help increase uniformed women’s meaningful participation in UN peace operations.
Target achieved to date as of March 31, 2021: On track/Objective 5
Canada continues to demonstrate a strong commitment to addressing barriers to women’s participation in UN peace operations in uniformed police and military roles, and has taken concrete steps to design, establish and effectively implement the Elsie Initiative for Women in Peace Operations.
- In FY 2020/21 Canada hosted one Contact Group (CG) ambassador-level meeting.
- The Elise Initiative undertook three major advocacy events and supported three additional events and two social media campaigns.
Baseline:
- Commitment by the Government of Canada to support the United Nations to achieve gender representation targets for uniformed women in peace operations.
Activity
- Design and establish a coherent and well-developed pilot initiative, named the Elsie Initiative for Women in Peace Operations.
Indicator:
- # of Contact Group meetings hosted
- # of advocacy and outreach events hosted by/undertaken by the Elsie Initiative
Completed Activities:
In FY 2020/21, the Elsie Initiative for Women in Peace Operations:
- Hosted one Contact Group (CG) meeting since the COVID-19 pandemic, an ambassador-level meeting on a virtual platform.
- Undertook three major advocacy events and supported three additional events which featured the Elsie Initiative, providing Canada, the Contact Group and other stakeholders an opportunity to speak about the Initiative and engage with a wide range of interlocutors.
- Supported two social media campaigns; the women in peacekeeping social media and the Peace Is My Mission campaign.
- Provided $5.45M in support to UN organizations for the implementation of the UN’s Uniformed Gender Parity Strategy and to help foster more receptive environments in UN peace operations, with a focus on mission accommodations for police and military personnel.
- Advanced bilateral partnerships, including completing MOWIP assessments for both the Ghana Armed Forces (GAF) and the Zambia Police Service (ZPS) and a report auditing the Ministry of the Armed Forces of Senegal gender integration strategy. A first project in Zambia with UNDP was launched, to support the ZPS as it seeks to address some of the barriers to women’s participation that were identified.
- Continued to support the UN’s Elsie Initiative Fund in its role as co-chair of the Elsie Initiative Fund Steering Committee. During the reporting period, the Fund announced its first projects – in support of Liberia, Mexico, and Sierra Leone, and with secured additional contributions towards the Fund.
- Advocated for, and secured, policy wins in UN forums such as the Special Committee on Peacekeeping (C34).
Results and Progress:
Significant progress was made in implementing the Elsie Initiative in FY 2020/21. On the advocacy front, Canada convened a Contact Group Meeting in September 2020 and co-hosted three major advocacy events, including a high-level event in May 2020 on Women in Peacekeeping for the International Day of the Peacekeeper (co-hosted with Zambia and Ghana), as well as an event on women’s leadership in peace operations in October 2020 (co-hosted with Bangladesh and the UK). The Elsie Initiative also supported three other events, as well as the UN’s Women in Peacekeeping social media campaign (May 2020) and the @UNPeacekeeping Peace Is My Mission campaign (October 2020).
Important progress was also made in implementing other components of the Elsie Initiative. For example:
- Canada advanced its bilateral partnerships with the Ghana Armed Forces, the Zambia Police Service and the Ministry of the Armed Forces of Senegal. The Ghana Armed Forces and Zambia Police Service completed their Measuring Opportunities for Women in Peace Operations (MOWIP) barrier assessments, and Senegal is in the final stages of completing an audit of its Armed Forces’ Gender Integration Strategy. As a result of the bilateral design workshop with ZPS, a $3M project was approved to address barriers highlighted in Zambia’s MOWIP assessment.
- In its role as co-chair of the Elsie Initiative Fund Steering Committee, Canada continued to support UN Women to operationalize the Elsie Initiative Fund. During the reporting period, the Elsie Initiative Fund announced its first beneficiaries, including the Liberia Armed Forces and Mexico's Ministry of National Defense, and the Senegalese Police and Senegal Gendarmerie. The Fund raised $5.8M USD, bringing total pledges and contributions to $26.5M by the end of 2020-21.
- Canada supported the work of the UN, working with DPO to implement its Uniformed Gender Parity Strategy, and with DOS to foster more receptive environments in UN missions, resulting in the production of new gender-responsive designs for camp accommodations in UN peacekeeping missions.
- Through its engagement as part of the CANZ negotiating bloc in the C34, Canada contributed to an advancement in the number of gender-responsive recommendations from the 2020 report, as well as new language calling for promoting greater awareness of misconduct reporting mechanisms and sexual harassment training for leaders and investigators. This marks the first ever reference to sexual harassment in a C34 report.
- Alongside the progress sketched out above, the Elsie Initiative also faced a number of challenges related to the COVID-19 pandemic, which exacerbated delays in implementation of the bilateral partnerships and the first programming round of the Elsie Initiative Fund in particular, and required new approaches for its advocacy and outreach activities. The Initiative also continued to face challenges in engaging with Member States on sensitive issues such as sexual abuse and misconduct within peace operations. Continued efforts will be required to engage a wider range of Member States to ensure that the Elsie Initiative is able to conduct advocacy and disseminate findings of research on potentially sensitive topics moving forward.
Target 2.12: By the end of FY 2021/22, Canada provides a substantial contribution to the global evidence of barriers to women’s meaningful participation in peace operations in uniformed military and police roles, which is made available to Elsie Initiative partner countries, UN member states, UN entities, civil society, academics and think tanks.
Target achieved to date as of March 31, 2021: On track/Objective 5
Canada continues to contribute to the development of global evidence of barriers to women's meaningful participation in peace operations demonstrate a strong commitment to addressing barriers to women's participation in UN peace operations.
- 3 issue briefs were funded through projects that support original research.
- The Geneva Centre for Security Sector Governance (DCAF) developed and published in the Measuring Opportunities for Women in Peace Operations (MOWIP), a gender-focused, comprehensive and innovative barrier assessment methodology for troop and police contributing countries.
- Three troop and police contributing countries completed the MOWIP barrier assessments with funding from the Elsie Initiative.
- Canadian Armed Forces commenced the MOWIP barrier assessment process.
Baseline(s):
- Zero peer and non-peer reviewed research papers, policy papers, issues briefs and reports supported by the Elsie Initiative. Zero comprehensive assessments or related perception surveys on the issue of barriers to uniformed women’s meaningful participation in peace operations supported by the Elsie Initiative.
Activity
- Engage relevant organizations, experts and academics in the co-creation of evidence-driven projects and project outputs to ensure PSOPs is contributing to the global evidence on the issue of barriers to uniformed women’s meaningful participation in peace operations.
Indicator:
- # of peer and non-peer reviewed research papers, policy papers, issues briefs and reports supported by the Elsie Initiative.
- # of Gender-focused Barrier Assessments undertaken using the Elsie Initiative-developed methodology.
Completed Activities:
- Supported research projects with Geneva Centre for Security Sector Governance (DCAF) and Cornell University, the International Peace Institute (IPI), and Georgetown Institute for Women in Peace Operations to contribute to global evidence on questions related to women in peace operations, with three briefs (all from IPI) published in 2020-21:
- Uniformed Women in Peace Operations: Challenging Assumptions and Transforming Approaches,” published on June 23, 2020 (IPI link)
- Woman First, Solider Second: Taboos and Stigmas Facing Military Women in UN Peace Operations,” published on October 19, 2020 (IPI link)
- Women, Peace, and Security mandates for UN Peacekeeping Operations: Assessing Influence and Impact,” published on January 31, 2021 (IPI link)
- Provided financial support to DCAF – Geneva Centre for Security Sector Governance to develop and pilot the Measuring Opportunities for Women in Peace Operations barrier assessment methodology, which was published online in October 2020.
- Three Troop and Police Contributing Countries (T/PCC’s) completed MOWIP barrier assessments during the reporting period: The Ghana Armed Forces, the Zambia Police Service, and the German Armed Forces (using an adapted version of the MOWIP methodology). Ghana and Zambia’s assessments were completed as part of a project with DCAF (funded by Canada and Norway) to pilot the methodology, and. DCAF continues to pilot the MOWIP in five other UN Troop and Police Contributing countries (including with Senegal (Police and Gendarmerie), Bangladesh (Armed Forces), Jordan (Police and Gendarmerie), Norway (Armed Forces), and Uruguay (Armed Forces and Police)). The Canadian Armed Forces commenced a MOWIP barrier assessment in 2020-2021.
- Provided additional funding to DCAF and Cornell University to establish an Elsie Helpdesk (DCAF) and a Gender and Security Sector Lab (Cornell) to provide technical advice and analytical support to T/PCCs seeking to undertake a MOWIP barrier assessment.
Results and Progress:
In FY 2020/2021, the Elsie Initiative for Women in Peace Operations continued to work to build the global evidence of barriers to women’s meaningful participation in peace operations in uniformed military and police roles.
During the reporting period, Canada continued to support several major research projects, including the Reducing Barriers for Uniformed Women in UN Peace Operations project with DCAF and Cornell University, the Women's Participation in UN Peace Operations project with IPI, and Measuring Gendered Impacts on Operational Effectiveness in UN Peace Operations with Georgetown Institute for Women, Peace and Security.
In 2020-2021, IPI produced three policy briefs, with additional briefs expected to be published in 2021-2022. The briefs published by IPI, coupled with IPI outreach activities, led to important policy impacts. For example, IPI’s brief on “Uniformed Women in Peace Operations: Challenging Assumptions and Transforming Approaches” informed the content of UNSC Resolution 2538, the first ever standalone brief on women in peacekeeping. Similarly, IPI’s brief “Woman First, Solider Second: Taboos and Stigmas Facing Military Women in UN Peace Operations” (together with a workshop hosted by IPI on the topic) helped push forward the discussion on sexual harassment in C34, leading to the adoption of the first ever reference to sexual harassment in the 2021 C34 report
Important progress was made in the development of the MOWIP methodology, an innovative tool developed by DCAF (with financial support from Canada and Norway) to help T/PCC military and police institutions identify barriers to women’s meaningful participation in UN peace operations and meaningful pathways to change. In October 2020, DCAF published the MOWIP methodology, while continuing to pilot its implementation in seven pilot countries. As of March 31, 2021, MOWIP assessments have been completed for the Zambia Police Service and Ghana Armed Forces, with the German Armed Forces also completing a barrier assessment in 2020-21 using an adapted version of the methodology. Additional assessments are expected to be completed in 2021-2022. Canada also supported the launch of DCAF’s Elsie Helpdesk and Cornell University’s Gender and Security Sector Lab to provide technical advice and analytical support to T/PCCs seeking to implement the MOWIP methodology. To date, the Elsie Help Desk has supported 21 security institutions in 13 countries, and the GSS Lab is supporting Liberia in implementing the MOWIP methodology within the Armed Forces of Liberia.
The COVID-19 pandemic posed a reccurring challenge for Elsie's research partners in their ability to conduct fieldwork. As a result, for select research, fieldwork was postponed and delayed until fall 2021 and, where possible, was adjusted to include virtual surveys and interviews. Additionally, there were delays with implementing the MOWIP methodology with pilot countries where DCAF has revised timelines and adapted the methodology in the context of the COVID-19 pandemic. Despite this, for 2021-2022, the Elsie Initiative will continue to contribute to the global evidence and support the publication of the following: fourteen issue briefs and policy papers, five barrier assessments for the remaining pilot countries, and a Global MOWIP report that will update the Elsie Initiative baseline study and include MOWIP findings from all pilot countries.
3. Canada Fund for Local Initiatives (CFLI)
Context: The Canada Fund for Local Initiatives (CFLI) is a contributions program, with an annual programming budget of $16.3 million to support small-scale, high impact projects, in countries which qualify for Official Development Assistance (ODA). The objectives of the program are to: 1) contribute to the achievement of Canada’s thematic priorities for international assistance; 2) assist in the advocacy of Canada’s values and interests and the strengthening of Canada’s bilateral relations with foreign countries and their civil societies; and 3) provide humanitarian assistance in the immediate aftermath of natural disasters and emergencies. The CFLI is a unique fund in that most projects are designed and implemented by local CSO that understand and respond to local needs and priorities. The CFLI is managed by Canada’s embassies and high commissions with projects being selected and monitored by Canadian diplomats. All CFLI projects must align with thematic priorities that are reviewed and updated on an annual basis. The thematic priorities are:
- GE and the empowerment of women and girls.
- Inclusive governance, including diversity, democracy, human rights and the rule of law.
- Peace and security, with a focus on conflict prevention and building peace.
- Human dignity, covering health, education and nutrition.
- Growth that works for everyone, including women's economic rights, decent jobs and entrepreneurship, investing in the poorest and most vulnerable, and safeguarding economic gains.
- Environment and climate action focusing on adaptation and mitigation, as well as on water management.
Priorities: Strengthen the gender proficiency of CFLI program managers and coordinators at Canadian Embassies and High Commissions
3.1 Target:
By the end of FY 2021/22, the CFLI significantly strengthens the gender proficiencyFootnote 7 of the managers and coordinators who implement the program at Canadian Embassies and High Commissions (also known as “missions”) in fragile and conflict affected states.
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
- 75 out of 76, or 99%, of CFLI Program Managers and Coordinators at missions accredited to fragile and conflict-affected states reported completed gender training in FY 2020/21. That is up from 76% in FY 2019/20.
Baseline:
- In the baseline year 2017-2018, 32 out of 80, or 40% of CFLI Program Managers and Coordinators at missions accredited to fragile and conflict-affected states had completed gender training by the end of FY 2017/18.
Activity:
- Require that CFLI Program Managers and Coordinators implementing the program at Embassies and High Commissions abroad take the Women and Gender Equality Canada GBA Plus online training, or other gender related training.
- Develop and deliver modules on WPS and gender at in-person CFLI regional trainings.
Indicator:
- % and # of CFLI Program Managers and Coordinators at missions accredited to fragile and conflict affected states who have gender training
Completed Activities:
- CFLI Program Managers and Coordinators who implemented the program at missions in fragile and conflict affected states continue to be required to take the Women and Gender Equality Canada Gender-based Analysis Plus (GBA Plus) online training, or other gender related training.
- Regional training activities were adapted to be delivered virtually, including training on Women, Peace and Security.
Results and Progress:
All mission staff working on the CFLI program were required to take gender training in order to strengthen their ability to evaluate proposals through a gender lens and to enhance the gender equality outcomes of CFLI programming. In FY 2020/21, 99% (75/76) of CFLI Program Managers and Coordinators at missions accredited to fragile and conflict-affected states reported that they had completed gender training. Availability of the GBA Plus training materials online, and regular messaging from HQ to missions on the importance of gender training contributed to this 23% increase in compliance when compared with FY 2019/20 data.
Meanwhile, the need to move regional training to an online format in response to the COVID-19 pandemic posed a challenge in ensuring the opportunity for participants to ask questions and exchange best practices.
In 2021-2022, the CFLI Unit will continue to adapt gender and WPS training resources as needed to better fit both virtual and in-person training contexts and work towards strengthening the gender proficiency of the managers and coordinators who implement the program at Canadian missions in fragile and conflict affected states.
While restrictions due to the COVID-19 pandemic impacted missions’ abilities to conduct capacity-building activities such as round-tables and trainings on gender equality with CFLI recipients. Missions continued to report that gender training has increased their ability to advise recipient organizations, especially smaller civil society organizations, on how to consult with women and girls and deliver stronger gender-inclusive projects. As one officer noted, “Having a team that has completed gender training means we are able to guide new partners through the required gender-based analysis component, and consistently review programming with a GBA Plus lens.”
Priorities: Enhance GE outcomes of CFLI projects
3.2 Target: By the end of FY 2021/22, the CFLI enhances the GE outcomes of projects in fragile and conflict affected states.
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
- 95% (310/325) of CFLI projects in fragile and conflict-affected states included a limited or detailed gender-based analysis, completed prior to the submission of the application for funding.
- 87% (283/325) of projects in fragile and conflict-affected states included consultations with women and/or girls, completed prior to the submission of application for funding.
Baseline:
- In the baseline year 2018-2019, 61% of CFLI projects in fragile and conflict-affected states were informed by a detailed gender-based analysis and 88% were informed by consultations with women and/or girls.
Activity:
- Create a robust but user-friendly gender analysis for the application for funding.
- Create resources and tools to support applicant organizations, mission staff, and local coordinators in completing and assessing the quality of a project’s gender analysis and its contribution to GE.
Indicator:
- % # of projects in fragile and conflict affected states that consulted with women and/or girls prior to submission of application for funding
- % # of projects in fragile and conflict affected states that include either a limited or detailed GBA Plus prior to submission of application for funding
Completed Activities:
- Applicants continued to be required to complete a simplified Gender-Based Analysis (GBA) as part of the CFLI project application for funding.
- Applicants continued to be required to consult with women and/or girls as part of the design stage of project development.
Results and Progress:
The CFLI continued to encourage enhanced integration of gender equality outcomes in projects in fragile and conflict-affected states. 87% of projects in fragile and conflict-affected states included consultations with women and/or girls prior to the submission of application for funding. This consultation rate was unchanged from the previous year.
In FY 2020/21, 95% of CFLI projects in fragile and conflict-affected states included a limited or detailed gender-based analysis, completed prior to the submission of the application for funding. Of all projects that included a gender-based analysis, 67% included a detailed analysis.
Missions continued to encourage and facilitate the submission of higher quality GBAs, through a number of means including communicating expectations in their calls for proposals and provided applicants with the step-by-step GBA Plus guide that had been prepared as a learning resource. While online tools such as Women and Gender Equality Canada’s GBA Plus online course remained available, it was a challenge for missions to implement other activities such as GBA Plus workshops for prospective CFLI applicants. Missions continue to work with applicants on an individual basis as required to understand and strengthen their gender-based analysis of the issues their projects were seeking to address.
4. Counter-Terrorism, Crime and Intelligence Bureau
Context: The work of the Counter-terrorism, Crime and Intelligence Bureau includes policy and programming components. The programming component is referred to as the Anti-Crime and Counter-Terrorism Capacity Building Programs (ACCBP and CTCBP). ACCBP and CTCBP have recently conducted a GBA Plus of their programs to assess the impact of programming on gender and other intersecting factors. Using the results of the analysis, ACCBP and CTCBP will continue to integrate gender and diversity issues where possible, with a focus on accounting for the differential impacts of security sector operations on women, men, girls and boys. They have also embedded a gender analysis and human rights section in all their project development and implementation tools. ACCBP and CTCBP are also responsible for developing, integrating and coordinating Canada’s international policies on countering terrorism (CT), countering violent extremism (CVE) and transnational criminal activity, in both bilateral and multilateral arenas. Gender is a key consideration in policy analysis and guidance, critical to understanding and responding to crime and terrorism issues, and a core competency of all policy and programming officers.
The Bureau is also responsible for developing, integrating, and coordinating Canada’s international policies and diplomacy on CT, addressing violent extremism and transnational criminal activity, in both bilateral and multilateral arenas. This includes fostering international cooperation to combat terrorism and crime, and representing Canada in various forums such as the G7 Roma-Lyon Group, the UN Office on Drugs and Crime, the UN Commission on Crime Prevention and Criminal Justice, the UN Commission on Narcotic Drugs, Global Counterterrorism Forum and the Financial Action Task Force. The division is also responsible for CT/countering violent extremism and anti-crime partnerships with foreign governments and international, regional, and non-governmental organizations including the UN, the Organization of American States, the G7, the Association of Southeast Asian Nations, and the OSCE.
Priorities: Strengthen WPS and gender analysis capacity within ACCBP/CTCBP
4.1 Target: By the end of the FY 2021/22, 100% of officers in the Counter-Terrorism and Crime Program and Policy Teams have gender and/or WPS training at the end of each FY to increase the Programs’ capacity for gender-responsive interventions.
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Objective 3
- By March 2021, all officers in the Crime and Terrorism Policy Division (ICP) have completed GBA Plus training. This is the same percentage as last year.
- By March 2021, all officers in the Counter-Terrorism and Anti-Crime Capacity Building Programs division (ICC) have completed GBA Plus training. This is the same percentage as last year.
- In addition to the online training, 7 officers have completed additional training related to their files in FY 2020/21. One ICP officer completed Positive Space Inclusivity training and one ICP officer participated in a three-day Implicit Bias training on Bias, Sensitivity, Diversity and identity in National Security. Four ICC officers took PSOPs Gender Based Analysis (GBA Plus) training, and one ICC officer took a course on Integrating Gender into Peace and Security Programming.
- Two ICP officers developed and presented a GBA Plus and International Crime learning event attended by 17 officers in the Bureau.
- One officer developed and delivered a Gender and CT/international Crime presentation to Canadian Foreign Service Institute's (CFSI) International Security and Terrorism Course.
Activity:
- Make it mandatory for all officers to take the Status of Women Canada online GBA Plus training, and make it mandatory for incoming officers
- Encourage officers to take more advanced GBA Plus training outside of the Government of Canada when available, as well as any other courses on GE integration and/or WPS.
Indicator:
- % of policy and programming officers from the Counter-Terrorism, Crime and Intelligence Bureau who completed gender and/or WPS related training at the end of the FY
Completed Activities:
- The International Crime and Terrorism Bureau communicated to officers that Women and Gender Equality (WAGE) online Gender Based Analysis Plus (GBA Plus) training was mandatory for all officers in September 2017.
- All officers (100%) have completed the required GBA Plus (11/11 in ICP; 12/12 in ICC). This is the same percentage as last year.
- 7 officers completed additional or more advanced training (up from 5 officers last year).
- Management regularly encourages officers to take more advanced GBA Plus training outside of the Government of Canada when available, as well as any other courses on GE integration and/or WPS by sharing information and event details where possible and through supporting and amplifying internal events.
Results and Progress:
The work of the Bureau includes both programming and policy components. Programming is led by the Counter-Terrorism and Anti-Crime Capacity Building Programs (ACCBP and CTCBP respectively) while the Crime and Terrorism Policy Division (ICP) is responsible for developing, integrating, and coordinating Canada’s international policies and diplomacy on counter terrorism (CT), countering violent extremism (CVE) and transnational organized crime (TOC), in both bilateral and multilateral arenas. Gender and the WPS Agenda are critical to understanding and responding to terrorism, violent extremism and international crime issues, are key considerations across the Bureau and a core competency of all officers.
All officers (100%) have completed the required GBA Plus training, this is the same percentage as last fiscal year. Seven officers completed additional training related to their files in FY 2020/21, up from 5 officers last fiscal year. Further, two ICP officers developed and presented a GBA Plus learning event tailored to the international crime context, attended by 17 officers across the Bureau.
Throughout various trainings, officers explored important concepts such as gender mainstreaming, gender equality, intersectionality, and the Feminist International Assistance Policy in relation to their work. Participants were also able to think about their internal biases and how these can influence their work. As a result, these trainings provided the opportunity for individual officers to increase their gender knowledge and analysis capacities and further empowers them to integrate gender, WPS and related considerations into their work. Events and opportunities on gender equity are also encouraged and shared within the Bureau, including by management to facilitate the comprehensive integration of gender and WPS considerations across the Bureau.
GBA Plus and related trainings also strengthened officers' capacity to advocate for, advise on, and collaborate to advance the gender and WPS dimensions in the international context. For example, ICC officers felt more confident advising programming partners on how to integrate gender into results-based management tools, such as logic models and performance measurement frameworks. Not only does this integrate gender into the design of a project through its inclusion in outcomes and outputs, but it allows for the monitoring and evaluation of progress against gender-sensitive indicators in line with Government of Canada priorities.
This further applies to ICP’s efforts in fostering international cooperation and representing Canada in various forums such as the G7 Roma-Lyon Group, the UN Office on Drugs and Crime, the UN Commission on Crime Prevention and Criminal Justice, the UN Commission on Narcotic Drugs, Global Counterterrorism Forum, the Global Coalition to Defeat ISIS and the Financial Action Task Force. It also includes strengthening partnerships with foreign governments and international, regional, and non-governmental organizations including the UN, the Organization of American States, the G7, the Association of Southeast Asian Nations (ASEAN), and the Organization for Security and Co-operation in Europe (OSCE), as well as other government departments. For example, one officer developed and delivered a presentation on Gender in Counter Terrorism and International Crime Policy to the Canadian Foreign Service Institute’s (CFSI) International Security and Terrorism Course, attended by colleagues from various government departments.
Challenge:
Officer movement poses a challenge to ensuring GBA Plus training in a given fiscal year, particularly if new team members arrive near the end of the reporting cycle. Short term contracts, such as casual employees, pose similar challenges with regards to reporting timelines. Competing priorities made it difficult to engage in additional GBA Plus and WPS-related trainings/seminars. The Bureau is working to address these issues through its new Strategic Vision Plan.
4.2 Target: The officers in ACCBP and CTCBP have access to resources in order to integrate gender perspectives and WPS into their work.
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
- Gender resources made available to team members are used on a regular basis by program managers in advising implementing partners on how to integrate gender to their initiatives.
- These resources are also shared with partners directly, again to share best practices on how to integrate gender to their projects’ activities, and measure progress with a gender-sensitive approach.
- Program officers continue to learn on how to incorporate gender considerations into project design through training, increased access to resources and tools, and support from in-house advisors.
- Program managers have been working with gender, diversity and inclusion experts within implementing organization in order to further advance their understanding of how to integrate gender, as well as how to reassess the initial project approach throughout the project lifecycle to ensure gender related issues are being addressed in the most effective way as new data and research becomes available.
Baseline:
- As of FY 2016/17, ACCBP and CTCBP offers did not have a place to access resources to assist in integrating gender into their work.
Activity:
- Develop evergreen reference material including academic papers, think tank papers, media analysis etc. for officers to draw on in their work and to support incoming officers
- Develop reference material to use when considering the role of gender in themes: Radicalization to violence; Preventing and countering violent extremism (P/CVE); CT; foreign terrorist fighters; High-risk travelers
Indicator:
- Creation and upkeep of resource bank
Completed Activities:
- Resources on how to best integrate gender to capacity building projects were made available to all team members through shared folders.
- Resources are also available through Modus, which is used by Program Officers. For example, the Feminist International Assistance: GE Toolkit for Projects; the Gender Analysis Assessment Guidance Note; or the RBM Tip Sheet 4.1: Gender Equality.
- Program managers have also been continuing to access resources through Jules-Leger library, think tanks/academic reports, and using online databases such as the Georgetown Institute for Women, Peace and Security to better integrate gender perspectives into programming.
- For every new project, a gender assessment form is now completed by ICC’s gender advisor, in collaboration with relevant program managers. This form allows to assess the level of gender integration of a project by evaluating the overall integration of gender into the Logic Model and Performance Management Framework, the GBA PLUS analysis conducted by the partner on the project, and the resources allocated for gender integration/gender advisors in the budget.
- An ICC in-house Gender Advisor is now available to advise Program Managers on gender integration.
Results and Progress:
While resources such as gender integration tools and gender advisors were not available to all Program Managers in 2016-2017, such resources are now widely available to all team members. A resource bank was created in 2018 and is regularly updated by ACCBP and CTCBP Program Managers. These resources are available in shared folders and are organized by themes such as drug trafficking, anti-corruption, human trafficking and smuggling, and arms control. Program Managers have learnt to consult these resources more frequently, as well as to share them with implementing partners more systematically.
Over the FY 2020/21, resources and reference materials have supported Program Managers’ understanding of several anti-crime and counter terrorism related thematics, including border security, terrorist financing, women in law enforcement and P/CVE. For example, the resource bank was used to increase Program Managers’ understanding of barriers faced by women working in law enforcement in South Asia, particularly in Afghanistan. Enhanced understanding of these issues has supported meaningful discussions with implementing partners on emerging issues faced by women in law enforcement. These resources are also shared with partners directly, again to share best practices on how to integrate gender to their projects’ activities, and measure progress with a gender-sensitive approach
Access to a gender advisor increased the number of conversations with implementing partners regarding gender integration. Meetings are now often organized with implementing partners at the planning stage to discuss gender integration in results-based management tools with the help of ICC’s in-house gender advisor.
Challenge:
Due to competing priorities, some Program Managers do not have the time to update gender-related material and resources on their thematic areas.
Priorities: Mainstream WPS and gender into CT policy and diplomacy
4.3 Target: Canada demonstrates leadership in ensuring that gender and WPS considerations are integrated into CVE/CT and international crime policy, advocacy and diplomatic efforts.
Target achieved to date as of March 31, 2021: On track/Objective 3
- ICP played a key role in establishing a series of Five Eyes (FVEY) meetings on Women and Violent Extremism.
- ICP participated in the Group of Friends of WPS meeting and the International Crisis Group’s (ICG) A Course Correction for the Women, Peace and Security Agenda In-depth Policy Discussion.
- Canada further participated and raised gender at various events and meetings including at the GCTF; Virtual UN Counterterrorism Week; ASEAN, UN Commission on Crime Prevention and Criminal Justice (CCPCJ); UN Commission on Narcotic Drugs (CND); OAS CICTE; OSCE; UNGA75: Sixth Committee; Global Coalition against Daesh; ASEAN Regional Forum (ARF); G7 Roma-Lyon Group; UNTOC Conference of Parties and Working Groups; and the 14th UN Congress on Crime Prevention and Criminal Justice.
- ICP commissioned a series of 5 case studies from the International Civil Society Action Network for women’s rights, peace and security (ICAN) on gender and VE/terrorism. Case studies will be ready 2021-2022 FY.
Baseline:
- While no qualitative or quantitative measures are currently in place, officers are cognizant and mindful of referencing gender and WPS considerations.
Activity:
- Appoint gender focal points to facilitate GBA Plus and WPS integration into policy and programming, as well as reviewing integration done by officers.
- Increase GBA Plus analysis and WPS integration into products, where applicable, including: resolutions, declarations, statements, ministerial products etc.
- Highlight the relevance and applicability of GBA Plus and WPS integration by making reference to research, international instruments, and other sources
- Integrate reference to gender and WPS, where possible
- Bring attention to gender and WPS issues in international engagement at various international forums, consultations and other attended events
- Raise issues related to gender and WPS in diplomatic efforts and at international forums, including strategic interventions, project proposals and other actions where it is appropriate and relevant
- Increase contact with women experts (academic, NGO, think tank) working on CVE and anti-crime issues, and when possible, promote their participation at international events (i.e. provide advice to missions on Canadian academics, thinkers and others with expertise on the relevance and applicability of GBA Plus and WPS to transnational crime and terrorism)
- Increase the number of female contacts on file as well as contacts with expertise on gender and WPS in the crime and CVE/CT context
- Develop and implement qualitative or quantitative measures to track engagement on GBA Plus and WPS integration
Indicator:
- # of events where Canada took an active role, through planning or participation, in bringing gender-informed perspective to CVE/CT discussions
Completed Activities:
- Canada demonstrated leadership and included gender considerations in its successful election at the UN Commission on Crime Prevention and Criminal Justice (CCPCJ) and the UN Commission on Narcotic Drugs (CND), and as co-chair of the Global Counter Terrorism Forum (GCTF).
- Canada further participated in 5 gender related events and raised gender in 13 interventions including at the GCTF, G7-Roma-Lyon Group, ASEAN, OAS CICTE, UN, OSCE, Global Coalition to Defeat Daesh, and UN Congress on Crime Prevention and Criminal Justice among others.
- ICP played a key role in establishing a series of ongoing FVEYs meetings on Women and Violent Extremism. Two were held last FY.
- ICP commissioned a series of 5 case studies from ICAN on gender and VE/terrorism. Case studies will be ready FY 2021/22.
- Canada collaborated with UNOCT to develop an initiative to produce an online platform to support the integration of GBA PLUS and intersectionality into CT policy and operations. The platform will make tools and resources available to practitioners, accelerating the adoption and implementation of a gender informed approach. The platform is expected to launch in the fall of 2021.
Results and Progress:
The Crime and Terrorism Policy Division (ICP) continues to actively and thoughtfully integrate gender and the WPS Agenda into all lines of effort including policy, advocacy and diplomatic efforts. This includes seeking to differentiate “gender” from “women” by highlighting the role that masculinities play in the context VE and terrorism, the ways in which healthy masculinities, women’s empowerment and gender equality can contribute to effective and sustainable outcomes, and the need to account for the varied experiences of diverse groups of women, men and children. Canada also continues to advocate for the importance of gender-responsive, age-appropriate, victim-centered, trauma-informed and culturally-relevant approaches to preventing and combatting TOC.
Canada continues to increase GBA Plus analysis, gender and WPS integration into all products and efforts. For example, at the UN and the OAS, Canada succeeded in incorporating gender-responsive language into several UN resolutions. Further, Canada increased its number of international interventions including gender to a total of 13. ICP also represented Canada at 5 gender related events including the Group of Friends of WPS meeting and the International Crisis Group’s A Course Correction for the WPS Agenda. ICP conducted a new GBA Plus analysis of its Migrant Smuggling file.
Canada continues to bring attention to gender and WPS issues in its international engagement, including through leadership in various fora. For example, Canada’s priorities that it promoted for its successful campaigns for election at the UN Commission on Crime Prevention and Criminal Justice (CCPCJ) and the UN Commission on Narcotic Drugs (CND) featured the importance of gender-responsive policies in response to crime, drug use and trafficking. Further, gender is a key priority for Canada as co-chair of the Global Counter Terrorism Forum (GCTF). This is reflected in the Gender & Identity Factors Platform Initiative Canada co-leads with the UN Office on Counter-Terrorism (UNOCT) and within the Canadian-led GCTF Administrative Unit in its work. Canada also underlined the importance of gender in its interventions to virtual meetings of the GCTF Coordinating Committee.
In the G7 Roma-Lyon Group, Canada continues to advocate for a coordinated holistic, preventative, human rights-based and gender-informed CT strategies, that builds resilience by addressing root causes. Through ASEAN discussions, Canada continues raise awareness regarding the need for a gender-informed approach to CT and CVE. Further, Canada amplified gender as a key priority in the first Virtual UN Counterterrorism Week and at the OAS CICTE Virtual Dialogue on Prevention of Violent Extremism. Canada also played a key role in establishing a series of ongoing FVEYs meetings on Women and Violent Extremism. Two meetings were held last FY. This new platform for collaboration will produce deliverables in the FY 2021/22.
The Government of Canada is currently implementing its 5-year National Strategy to Combat Human Trafficking, a key tool in countering SGBV, including in fragile, conflict and post-conflict settings. Built on the “4 Ps” approach: prevention, prosecution, protection and partnerships, the National Strategy introduces a new pillar, empowerment, to help victims and survivors regain control and independence through age- and gender-appropriate, and trauma-informed services. As part of the Strategy, Canada is leveraging its international engagements, particularly through UNODC to advocate for the mainstreaming of human rights, gender and diversity perspectives into responses to counter this crime.
Canada continues to strengthen its engagement with experts and promote their participation at international events. For example, Canada commissioned 5 case studies relating to gender and CT from a CSO which covers multiple countries across several regions and demonstrate the nuances of effective gender approaches, concrete actions to address related challenges while strengthening the international communities’ evidence base on these issues. They will be published in the 2021-22 FY and Canada will work to support and amplify the launch of these products. ICP also works in close collaboration with other government departments working on crime and counter-terrorism.
ICP’s gender focal point continues to support capacity building and the integration of gender considerations through developing and delivering training and maintaining a resource bank. Canada continues to seek ways to develop and implement qualitative and quantitative measures to track engagement on GBA Plus and WPS integration.
Challenge:
Challenges are mostly related to the reception of these ideas in the international domain, and related inclusion in consensus-based international documents. For example, gender is not often mentioned in counter terrorism discussions leaving Canada as one of the only countries advocating for its consideration. The perception endures that a gendered approach can be distilled into the inclusion of women. Efforts to promote the operational value of intersectional and gendered approaches remain highly relevant, as is the continued need for data and practical tools.
Priorities: Mainstream WPS and gender into CT and anti-crime programming
4.4 Target: The officers of ACCBP and CTCBP integrate gender and WPS considerations into CT programming in a systematic manner, and increase programming that has a specific focus on gender and WPS
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
The Counter-Terrorism Capacity Building Program had 13 new projects approved in FY 2020/21 (18 less than in the previous reporting period)). Of those 13 projects:
- 4 projects were coded as GE00 (none) = 30.77% (minus 4.73%)
- 4 projects coded as GE01 (limited) = 30.77% (minus 14.38%)
- 4 projects coded as GE02 (integrated) = 30.77% (plus 15.58%)
- 1 project coded as GE03 (specific) = 7.69%
CTCBP’s new projects approved in 2020/2021 included one GE-3, a 100% increase from the previous year. GE-2 projects also increased from 19.35% to 30.77%, GE-1 projects decreased from 45.15% to 30.77%, and projects with no gender integration decreased from 35.5% to 30.77%.
The ACCBP had 21 projects approved in FY 2020/21 (an increase of 10 projects compared to FY 2019/20). Out of those 21 projects:
- 1 projects were coded as GE00 (none) = 4.7% (minus 2%)
- 6 projects coded as GE01 (limited) = 20.6% (minus 23%)
- 12 projects coded as GE02 (integrated) = 57% (plus 16%)
- 2 project coded as GE03 (specific) = 9.5% (plus 9.5%)
Overall, out of the 21 new ACCBP projects approved in 2020/2021, the portion of GE00 projects diminished from 6% to 4%, the portion of GE01 projects diminished from 53% to 20%, the portion of GE02 projects increased from 41% to 57%, and the portion of GE03 projects increased from 0% to 9.5%.
Implementing partners were encouraged to have their training programs reviewed by a gender specialist and to include a module on GBA PLUS and human rights. Most were able to include a gender training module and promote increased participation of women in project activities, despite the lack of women representation in the security field.
Overall, of the 17 new PARCLC projects approved in 2019-2020, the share of GE-00 projects decreased from 53% to 6%, the share of GE-01 projects increased from 21% to 53%, the share of GE-02 projects increased from 21% to 41%, and the share of GE-03 projects decreased from 3.5% to 0%.
Baseline:
- There is an embedded gender and human rights section in all project development and implementation tools.
Activity:
- Draft and distribute a briefing note containing “Standard Operating Procedures” (SOPs) on best practices to guide officers when completing the gender analysis for project development and implementation tools
- Review and identify opportunities for collecting quantitative data on the gender dimensions of programs. Recommendations will be included within the above mentioned Standard Operating Procedures
- Annually review and collect “lessons learned”, “challenges”, and “successes” in the use of the gender section of the project development and implementation tools; practical observations can be communicated to the WPS community of practice (for example, in May 2018)
Indicator:
- % of projects that have GE as the specific objective (i.e. GE03);
- % of projects that fully integrated GE (i.e. GE02);
- % of projects that had limited integration (i.e. GE01); and,
- % of projects had no gender integration (i.e. GE00).
Completed Activities:
- Standard Operating Procedures (SOPs) reviewed and updated regularly on best practices to guide officers when completing the gender analysis for project development and implementation tools.
Results and Progress:
CTCBP projects have increased integration of gender equality results and gender-sensitive indicators.
Some example projects of note include:
- With support from Canada, the United Nations Development Programme (UNDP) is implementing a project with Tunisia that aims to strengthen trust between targeted communities and Internal Security Forces (ISF) through a community policing approach that will foster resilience to current and emerging security concerns, including sexual and gender-based violence (SGBV) and the prevention of violent extremism. During FY 2020/21, UNDP worked in collaboration with the Ministry of Interior (MoI) to launch and implement a sectoral plan for the implementation of UN Security Council Resolution 1325 (Women, Peace and Security), which included training sessions for 310 ISF members (25% women), focused on the reception and care of women and girls’ who are victims of violence in accordance with international standards. Additional training that targeted ISF members included 2 sectoral training sessions on SGBV for 40 ISF agents (25% women), a workshop on United Nations Security Council (UNSC) Resolution 1325 awareness and advocacy for 16 ISF members (62% women), as well as a capacity building session for 16 women from the ISF on leadership, organizational change, and conflict management. Despite the low number of women currently in the MoI, the project is also aiming to improve the participation and collaboration of women ISF members who have leadership roles in security decision-making processes at the national, regional, and local levels.
- Canada, through its Counter-Terrorism and Capacity Building Program, supported the International Research and Exchanges Board (IREX) to implement a gender-integrated project that increased community resilience through inclusive dialogue, positive youth engagement, and digital literacy training for women and youth leaders. Examples of results achieved through this project include: 15 women-led community initiatives that directly engaged 14, 875 participants and indirectly engaged an audience of over 600,000 through activities and media awareness campaigns that received coverage on social media, radio broadcasts and television broadcasts. In addition, 70 facilitators were trained on topics of digital literacy, social dialogue, and positive youth development. These master trainers went on to train 4,085 participants across 10 governorates in Jordan, thereby empowering Jordanian women and youth to lead inclusive and positive dialogues. In March, 2021, 33 facilitators were surveyed, all of which believed the project and the initiatives had a positive impact and addressed a need in their communities. Moreover, all surveyed facilitators are now confident in correcting misinformation in their communities, with 55% of those surveyed indicating that they are correcting approximately 10-30 pieces of misinformation per month through social media platforms, mother support group meetings, as well as offline interactions within their respective families and social networks.
- In FY 2020/21, Canada, through its Counter-Terrorism and Capacity Building Program, continued to support gender mainstreaming efforts underway in the Jordanian security sector through critical incident response capacity-building. This project encouraged positive organizational culture change with respect to attitudes to women serving in operational and leadership positions in the security sector. Performance indicators for the training and mentoring showed marked improvements in the perceptions of women serving in operational contexts, creating conditions for greater inclusivity in future. Of 84 former trainees, when asked how male personnel perceived females acting in operational contexts, pre-course 53% of respondents felt female personnel were perceived as incapable. Post-course, 68% of respondents suggested that male personnel had confidence in their female colleagues and were comfortable working with them in operational environments. The project provided crucial capacity building support in other areas such as gender auditing and gaps analysis in the lead up to the launch in March 2021 of the Jordanian Public Security Directorate’s Gender Mainstreaming Strategy, alongside UN Women and the Jordanian National Commission for Women. (JCG)
- With support from Canada, United Nations Mine Action Service (UNMAS) successfully trained 205 female personnel (out of 2396 participants) in law enforcement and security agencies (LESA) on Improvised Explosive Devices (IEDs) mitigation and detection, a field where there are fewer women, namely 36 women officers were trained on basic search and detect training, 120 on IED risk awareness and 49 on the use of individual first aid kits. All training curriculums were reviewed and approved by a UNMAS gender specialist before the training began. As a result of the integrated gender and human rights module, a post-training survey indicated that 92.5% of the 208 participants in the research and detection training had improved their knowledge of gender rights and women's empowerment since attending the training. This project also facilitated an Explosive Ordnance Risk Education (EORE) campaign to 15,000 civilians which included 4,405 women and 3,946 girls (56% of participants). These awareness campaigns were provided to community members in affected regions of Nord and Centre-Nord and at-risk communities in the Cascades and Sud-Ouest regions. (WEE)
Challenges:
A challenge this year was the impact of the COVID-19 pandemic which affected many CTCBP projects in FY 2020/21. Specifically, the pandemic caused delays in the implementation schedule for project activities, with implications for the partners’ ability to meet targets for project outcomes on original timelines.
Another challenge comes from redesigning and updating projects that were approved before the WPS Action Plan so that they include gender-specific outcomes when implemented by partners.
ACCBP projects have increased the integration of gender throughout project activities, as well as monitoring and evaluation indicators.
Some examples of projects approved over FY 2020/21 include:
- The Strengthening Institutional Capacity to Combat Human Trafficking in Panama, with a Focus on Corruption, Money Laundering and Transnational Organized Crime project, implemented by Justice Education Society (JES), integrated gender in all levels of outcomes, from the ultimate to the immediate outcome level. Indicators used to track the project’s progress were also gender-sensitive, for example: “% total of training participants (f/m) who have applied gender-responsive practices and procedures in human trafficking prosecutions and sentencing linked to training”. Furthermore, while the project was not rated as gender-specific, some of the planned activities did have a gender-specific focus, for example “Gender-responsive Training of Trainers for Panamanian investigators and analysts on GBA PLUS and trauma informed investigation of human trafficking cases”.
- In FY 2020/21, the ACCBP also approved the project Gender Mainstreaming Policy for the Jakarta Centre for Law Enforcement Cooperation (JCLEC), implemented by the United Nations Office on Drugs and Crime (UNODC). The project was rated as GE-02 (integrated) and resulted in substantive gender-related results, as JCLEC released a formal Statement of Intent to integrate gender considerations throughout the Centre’s operations and training, making JCLEC the first Indonesian security institution to adopt this type of gender instrument.
- The ACCBP approved the second phase of the project The Inter-American Program for Strengthening Gender Equality in Counterdrug Law Enforcement Agencies (GENLEA), implemented by the Organization of American States (OAS). Through this project, 28 beneficiary states have committed to improving gender-inclusive practices and policies, developing a more gender inclusive workforce and enhance the effectiveness of female drug and chemical control law enforcement officers. Through technical assistance and training, their efficacy to control the illicit production, trafficking and distribution of drugs and precursor chemicals will also increase. This project is rated as a GE-03 (Targeted) as it targets gender integrated policies, workplace culture, and women-specific skills training.
- In FY 2020/21, the ACCBP approved the project Leading a global response to the Opioid Crisis, implemented by the United Nations Office on Drugs and Crime (UNODC). This project is rated at GE-02 (fully integrated) as the project seeks to strengthen the effectiveness of law enforcement, border control and drug control officers to safely identify, interdict and disrupt trafficking of synthetic drugs and their precursors in all beneficiary countries using gender sensitive and human rights-based practices.
- The ACCBP supports the Establishment and Strengthening of National Drug Policies, Strategies and Plans of Action in the Americas with a specific attention in the Caribbean, a GE-02 (fully integrated) rated project, that improves drug related public security of men and women in targeted beneficiary countries where Canada engages. This project adopts a holistic gender sensitive approach through ensuring a gender perspective is incorporated into National Drug Strategies and National Plans of Action.
- A project with the Organization of American States (OAS) has supported the creation and distribution of the “GENLEA Handbook: Strategies and Good Practices for Strengthening Gender Equality in Counter Drug Law Enforcement Agencies” to 34 OAS Member States. This initiative has also increased the capacity of beneficiary states to mainstream gender within targeted member states’ counter-drug law enforcement agencies.
- Support provided to the Organization of American States (OAS) has improved the delivery of alternatives to incarceration options that are responsive to gender inequalities. Through this initiative 99 judiciary officials and 60 policymakers have been trained on the importance of incorporating a gender perspective in the justice system and the impact of alternatives to incarceration in drug related offences and gender related crimes. Significant progress has been made in raising awareness among policymakers regarding the importance of gender responsive alternative to incarceration strategies through workshops and online events.
- A project with the Organization of American States (OAS) aims to reduce criminal recidivism among drug-dependent offenders, especially women, participating in drug treatment courts (DTCs) throughout the region and where Canada engages. Through this initiative, training sessions on monitoring and evaluation mechanisms of DTCs are delivered inclusive of a gender and human right perspective.
Challenges:
Partners or beneficiary countries sometimes conduct a basic gender analysis, which results in program activities that focus only on increasing women's participation in policy decision-making and training opportunities, however the linkages between violence against women/gender-based violence (VAW/GBV) are not made or explored. For example, there is a lack of legislative data that has been cross-referenced against provisions concerning domestic violence and/or IPV, which is crucial to collect before an enhanced gender-sensitive policy and legal responses can be undertaken.
Another issue is the general lack of knowledge in beneficiary states regarding gender, particularly in the security sector. For example, judges and investigators often lack the experience to recognize clues or evidence of GBV, which increases impunity in the cases of GBV. Gender awareness varies in each beneficiary country, which can also cause challenges in regional programming. In the case of LAC for example, the term "femicide" is not clearly and consistently defined across countries, and the concept of "femicide" hasn't largely been incorporated into the Caribbean region as a criminal offence.
5. Policy and Programming on Non-Proliferation, Arms Control and Disarmament
Context: Canada’s Non-Proliferation, Arms Control and Disarmament activities include both policy and programming elements. Target 5.1 relates to the Weapons Threat Reduction Program (WTRP), which is the primary programming vehicle for Canada to globally address threats posed by the proliferation of weapons of mass destruction (WMD) and related materials. The WTRP works with partner countries, regional and international organizations, and non-governmental organizations to implement programming to address WMD threats (nuclear and radiological; biological; chemical) as well as to support the universalization of treaties and conventions related to the proliferation of conventional weapons. Through the Program, Canada continues to play a leadership role globally in the area of weapons threat reduction. Target 5.2 relates to Canada’s non-proliferation, arms control and disarmament (NACD) policy activities within the context of Canada’s participation within the United Nations General Assembly’s First Committee, which is responsible for NACD issues.
Priorities: Mainstream WPS and gender into WTR programming
5.1 Target: The WTRP integrates gender and WPS considerations into its programming in a systematic manner, with at least 20% of projects having GE01 or greater coding by the end of FY 2021/22.
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Objective 3
- With 52.48% of projects in FY 2020/21 being coded as GE-01 and above, the WTRP saw an increase of 7.51% from FY 2019/20 (44.97%), thanks to more robust discussions at all levels regarding project activities, outcomes, and implementation as well as the monitoring, tracking, and reporting of project-level indicators.
Baseline:
- 0% of projects have GE01 or greater gender coding
Activities:
- Integrate gender perspectives into relevant projects and encourage partners and beneficiaries to consider their activities through the lens of inclusion.
- Gender elements are integrated into the WTRP’s performance measurement framework.
- Training for program officers include the Women and Gender Equality Canada online GBA Plus training.
Indicator
- % of projects with GE01 or greater gender coding
- % of officers in the WTRP who have completed GBA Plus training at the end of each FY
Completed Activities:
- 53 out of 101 active projects in FY 2020/21, or 52.48% of programming across the Weapons Threat Reduction Program, were coded as a GE-01 or above: 45 projects or 44.56% were coded as GE-01; 6 projects or 5.94% were coded as GE-02; and 2 projects or 1.98% were coded as GE-03.
Results and Progress:
With 52.48% of all active projects across the Weapons Threat Reduction Program (WTRP) coded as GE01 or above, the program has exceeded its initial commitment of 25% towards Target 5.1. of the Canadian National Action Plan.
The WTRP consistently worked with implementing partners to ensure the application of a gender lens to all relevant projects, through the use of gender assessments, gender experts, and consultations with relevant external stakeholders.
In addition, the WTRP continues to integrate Gender-Based Analysis Plus into all stages of the project life cycle. This includes: the identification of potential gender and equality considerations by implementing partners at the project proposal stage; the identification of gender equality considerations through consultation with relevant internal and external stakeholders, including gender equality advisors; the creation and implementation of a “Gender Equality and Women, Peace and Security Form” as part of the standard project documents package; active monitoring of gender outcomes throughout project implementation; and continued tracking of gender outcomes following project closure.
The WTRP utilizes a results based management framework that integrates WPS and Feminist International Assistance Policy commitments. This includes gender language and gender disaggregation (where applicable) in program and project indicators to facilitate more robust gender and equality results-tracking at all stages of a project.
Challenge:
The WTRP’s core programming mandate focuses on preventing acquisition of chemical, biological, radiological and nuclear weapons and materials by terrorists or states of proliferation concern. This type of programming tends to rely heavily on equipment and infrastructure, which offers limited opportunities to incorporate meaningful gender equality outcomes.
The WTRP also experienced challenges during the year in retaining a GE Advisor to assist with the analysis and coding of projects. Personnel with the requisite skills, training and experience continue to be in short supply within GAC, which has a negative impact overall on achieving CNAP objectives and goals.
Priorities: Mainstream WPS and gender into diplomacy on disarmament
5.2 Target: A GBA Plus carried out on all resolutions of the UN General Assembly’s First Committee (responsible for disarmament, global challenges and threats), proposed or considered by Canada, and gender perspectives integrated.
Target achieved to date as of March 31, 2021: On track/Objective 3
- Canada conducted a systematic GBA Plus of all 72 First Committee resolutions and decisions.
- From this analysis, additional successful advocacy resulted in the inclusion, maintenance or enhancement of gender language in 18 resolutions (25%), an unprecedented number, up from 17 the previous year.
Baseline:
- While gender perspectives were integrated whenever possible in FY 2016/17, there was not yet a formal process to ensure they are applied to every resolution.
Activity:
- Ensure that gender issues and perspectives are systematically considered during the analysis of resolutions. Based on this analysis, one of the following approaches will be taken:
- take no action (gender perspectives are adequately addressed, not relevant to the resolution, or not pursued due to other considerations).
- propose edits to the text to address missing gender perspectives where relevant and consider speaking in favour of amendments which support of these edits.
- support positive changes to the text by other states in terms of gender perspectives.
Indicator:
- # of resolutions where gender was not considered
- # of resolutions where gender was considered and there was potential for action but due to other considerations, no action was taken
- # of resolutions where gender was considered, there was potential for action, action was taken but the outcome was negative (i.e. Canada’s goal was not achieved)
- # of resolutions where gender was considered, there was potential for action, action was taken and there was a positive result (i.e. Canada’s goal was achieved)
- # of resolutions where gender was considered and based on this evaluation there was no need for any further action (e.g. new language proposed by other delegations was sufficient)
Completed Activities:
- Canada completed a gender analysis on all 72 First Committee resolutions and decisions.
- In total, 18 of the 72 resolutions and decisions adopted by First Committee in 2019 contained new or enhanced gender language, an unprecedented number (25% of all resolutions and decisions adopted).
Results and Progress:
Canada’s active diplomacy and multilateral engagement has focused on increasing gender participation and perspectives in disarmament dialogues and decision-making. These actions are making an impact and are laying the groundwork for a high degree of continued success on gender issues in these fora.
In 2020, Canada continued its work with the Geneva-based Disarmament Impact Group (which includes Canada, Ireland, Namibia, the Philippines, and the United Nations Institute for Disarmament Research) to coordinate advocacy efforts to include gender considerations language in several resolutions and decision at the Disarmament and International Security Committee (First Committee) of the UN General Assembly.
This collective effort resulted in the adoption, maintenance or enhancement of gender perspectives in 18 of 72 resolutions and decisions adopted by the First Committee in 2020. This represents an unprecedented number of resolutions with a gender dimension, up from 17 in 2019.
6. Partnerships for Development Innovation Branch
Context: The Partnerships for Development Innovation Branch is Global Affairs Canada’s key operational platform supporting the active engagement of Canadians in international development, notably by supporting Canadian civil society entities working in collaboration with developing country partners to reduce poverty through thematic programming as well as youth internships and the deployment of volunteers. Canadian entities in this context include non-governmental organizations; the private sector; colleges, universities, and research entities; provincial and regional councils; and foundations. Partnerships for Development Innovation leverages the expertise, knowledge, networks and resources of Canadian entities and their local partners. Its programming is able to operate in all Official Development Assistance-eligible countries, including in fragile and conflict-affected states. For example, Partnerships for Development Innovation has supported projects in the Democratic Republic of Congo, Colombia, Afghanistan, Haiti and South Sudan. For these and other projects, Partnerships for Development Innovation pays particular attention to the integration of GE. For example, it supported a project in South Sudan to empower conflict-affected rural youth to become more economically productive and engaged in their communities. This project promoted education for youth, especially girls.
Priorities: Strengthen the integration of GE into its programming, including the promotion and realization of women’s and girls’ rights, particularly in fragile and conflict-affected states.
6.1 Target: Canada will increase the percentage of Partnerships programming that targets GE (GE03) or fully integrates GE (GE02).
Target achieved to date as of March 31, 2021: On track/Objective 3
Baseline:
- In FY 2017-18, 1.42% of Partnerships programming targeted GE and 45.77% fully integrated GE.
Activity:
- Prioritize project proposals that target or fully integrate GE (GE03 or GE02)
- Work with Canadian partners to strengthen GE into their projects
Indicator:
- % of programming that targets GE (GE03)
- % of programming that fully integrates GE (GE02)
Completed Activities:
- The Partnership for Gender Equality selection process resulted in a $300M partnership with the Equality Fund consortium. The Equality Fund initiative aims to address the funding gap faced by women’s organizations and movements that work to advance gender equality and the empowerment of women and girls in developing countries by providing them with a predictable and flexible source of funding, along with technical assistance.
- The Partnerships for Development Innovation Branch contribution is targeted GE programming (GE-03).
- In FY 2020/21, the Equality Fund received the second ($101M) and third ($195M) of three disbursements of Canada’s contribution (for a total of $300M).
- In FY 2020/21, the Equality Fund completed their first global grant-making cycle and provided multi-year and core funding to women’s organizations through direct grants for a total of $4.9M disbursed to 93 grantee partners, including through the COVID-19 pandemic response fund and a strategic partnership with the African Women’s Development Fund.
Results and Progress:
In FY 2020/21, 50.04% of Partnerships for Development Innovation programming targeted GE03 (compared to 33.34% in 2019/20) and 39.85% fully integrated GE02 (compared to 40.85% in 2019/20). The branch continued to support Canadian partners to strengthen the integration of GE into their programming. This included support to 51 GE03- and 99 GE02-coded projects.
In FY 2020/21, the Equality Fund (GE03 project) continued its organizational design and build phase. The Equality Fund worked on its plan to create a grant-making stream focused on crisis and humanitarian settings, including conflict-related crises, which will contribute to WPS objectives in the coming years.
The Partnerships for Development Innovation Branch has increased engagement with Canadian partners on advancing gender equality, including through a training session with small and medium organizations (SMOs) on how to create strong gender equality strategies.
Priorities: Explore programming opportunities with Canadian entities to support the WPS agenda.
6.2 Target: Canada will increase Partnerships programming to support the WPS agenda.
Target achieved to date as of March 31, 2021: On track/Objective 3
Baseline:
- Partnerships programming has been implemented in many fragile and conflict-affected states. However, only a modest percentage of it has been directly related to WPS.
Activity:
- Launch a Call for Proposals for women and girls’ education in fragile and conflict-affected states
- Review project proposals with consideration of alignment with the WPS agenda
Indicator
- % of Partnerships programming that is implemented in fragile and conflict-affected states
Completed Activities:
- Continued to support KAIROS to deliver its Women of Courage: Women, Peace and Security Project ($4.5 M, 2017-2022).
- 8 projects from the G7 Charlevoix commitment are being implemented, of which 7 were selected as part of the Dismantling Barriers and Improving the Quality of Education for Women and Girls in Fragile, Conflict and Crisis Situations call for proposals. Projects in their second year of implementation:
- Breaking Barriers, Improving Girls’ Education, Hope and Totality (BRIGHT) – a 4-year project implemented by ADRA Canada in Sudan, Myanmar and Niger;
- Défi éducation des filles au Mali (DÉFI) – a 5-year project implemented by Alinea International in Mali;
- Supporting Transition, Retention and Training for Girls (START4GIRLS) – a 4-year project implemented by CARE Canada in Zimbabwe;
- Promoting Greater Access to University for GIRLS (U-GIRLS 2) – a 5-year project implemented by Cuso International in Ethiopia;
- Éducation des filles pour un avenir meilleur dans la région des Grands Lacs (ÉDUFAM) – a 4-year project implemented by Fondation Paul Gérin-Lajoie and Centre d’étude et de coopération internationale in Rwanda, Burundi and the Democratic Republic of Congo;
- My Education, My Future: Supporting Burundian Refugee Girls' Education – a 4-year project implemented by Right to Play in Burundi and Tanzania;
- Adolescent Girls’ Education in Crisis Initiative (AGENCI) – a 4-year project implemented by World University Service of Canada (WUSC) and Aga Khan Foundation Canada (AKFC) in Uganda, South Sudan and Syria.
- Undaunted: Educating Girls with Disabilities in Somalia – a 3-year project implemented by UNICEF Canada in Somalia.
Results and Progress:
17% of Partnerships programming was implemented in fragile and conflict-affects states.
The KAIROS project saw an increase in the participation of female GBV survivors in peace processes and post-conflict development was achieved by, inter alia: providing services to aid the healing of victims; and developing advocacy skills of victims, as part of the healing process, allowing for the increased participation of women in peace and governance processes. In FY 2020/21, project partners responded to the psychosocial needs of women victims as follows:
- 1,029 women received psychosocial counselling and medical accompaniment after experiencing gender-based violence.
- 269 people (179 women and 9 men) participated in mixed workshops on the psychosocial impacts of war and effective accompaniment.
- 18 clinics were set up to offer psychosocial support and referrals to medical services to women victims and survivors.
- 1,126 women and 618 men completed gender awareness training through 51 training sessions.
- Counselling and psychosocial support facilities were organized in 66 municipalities.
The project measured the extent to which women survivors of gender-based violence have been able to heal from their trauma and work as agents of change. The healing was measured through the survey responses of 342 women measuring capacities and traits related to self-confidence following the training and empowerment exercises. Aggregated results in 2020-2021 from the four participating partners show the gains from the previous year in the following areas: autonomy, resilience and strength, communication style, relationship to power structures, ways of thinking, and connecting to other people.
The data show changes in attitudes. Immediate behavioural impacts are captured by success stories. Wi’am, the Palestinian partner noted the following, “The end goal of our programming is not support or counseling, but instead transforming society into inclusive communities marked by equal participation, not just in theory, but more importantly in practice. Based on surveys given to 100 beneficiaries, we (Wi’am) have found that 78% of respondents are engaged in advocating for women’s rights in their local organizations and networks, 60% are advocating or willing to advocate on behalf of another individual, 39% took part in an active campaign for women’s rights, 32% were engaged in meetings to pressure government actors to make change, 10% are engaged in work as human rights trainers and teachers, and 4% act in some capacity as local councilors. Furthermore, when asked about the scope of their involvement in such work and processes, many specified engagement with advocacy and lobbying based groups and networks.”
A survey of participants in 2020-2021 measured involvement in peace and community development processes:
- human rights trainers, n= 82 (23%)
- counsellor, n=47 (14%)
- advocate for others, n=170 (57%)
- campaigning for women's rights, n=161 (54%)
- involvement in organizations and networks, n=177 (59%)
- meetings to pressure government to make changes, n=128 (37%)
- other ways, n=29 (8%).
While projects do not specifically target alignment to the WPS agenda, selected projects contribute to the prevention and protection pillars of the WPS framework.
Prevention: The portfolio of G7 education projects contributes to prevention of conflict and violence against women and girls in conflict and post-conflict situations. Students in conflict zones struggle with traumatic experience, dislocated families, loss, and the associated emotions of anger and fear.
These projects, which focus on access and quality of education, help address children and youth's trauma through activities such as remedial learning, the promotion of inclusion, and psychosocial support to address biases and trauma that fuel conflict.
Protection: The Partnerships for Development Innovation Branch’s G7 education projects contribute to the protection of young women and girls from sexual and gender-based violence. This is one of the primary barriers to education, as they face the threat of violence in the streets on their way to and from school as well as inside their educational institutions. These G7 projects work to prevent and respond to gender-based violence by establishing community watch systems and safe spaces in and out of schools and by working with men and boys, as well as communities, on awareness raising to tackle harmful social norms that perpetuate gender-based violence.
One challenge faced working on implementing WPS targets is that due to competing priorities, the G7 call was not conceptualized for alignment to the WPS agenda. Projects incidentally align with two of the pillars as mentioned above, as such the projects are not designed to report on WPS targets.
Priorities: Increase staff capacity on GE and promote staff engagement WPS policy and programming activities across the department.
6.3 Target: Canada will strengthen its GE capacity and WPS engagement
Target achieved to date as of March 31, 2021: On track/Internal capacity and efficiency
Baseline:
- In 2017/18, the Partnerships for Development Innovation Branch (Branch) had one GE specialist. A majority of Branch staff completed the Women and Gender Equality Canada ’s GBA Plus online course during GBA Plus Awareness Week.
Activity:
- Make it mandatory for all staff to complete the Women and Gender Equality Canada online GBA Plus training
- Secure additional GE resource
- Hold information sessions related to WPS
Indicator:
- # and % of staff who completed online GBA Plus course
- Amount of GE capacity
- # of information sessions held related to WPS
Completed Activities:
- The Partnerships for Development Innovation Branch staff have completed gender equality training and attended various learning sessions related to strengthening GE strategies and GBA Plus assessments for project design and implementation.
- The two Partnerships for Development Innovation Branch GE specialists trained 25 branch staff on how to assess a project proposal using a gender equality lens during a call for proposals dry-run and in the context of the branch Learning Sessions.
- The two GE specialists shared 6 email newsletters and resources on a biweekly basis to branch staff related to gender equality and tackling the COVID-19 pandemic issues and humanitarian crises.
Results and Progress:
79% of respondents to a branch survey indicated that they completed the WAGE GBA Plus course in FY 2020/21 (58 out of 129 employees responded to the survey). 41% of respondents completed other gender equality and GBA Plus courses, 59% of respondents participated in panels or seminars on those subjects, and 26% of respondents attended WPS sessions.
The two gender equality specialists have worked closely with Project Team Leads and partners to design projects that either target or fully integrate gender equality and have provided them with insights and skills on effectively integrating gender equality in all their work. This work has led to significant improvements in the drafting of Project Implementation Plans and Gender Equality Strategies.
Priorities: Encourage and support partners to strengthen policies and procedures to prevent and respond to SEA in the delivery of international assistance.
6.4 Target: Canada’s partners will have stronger policies and procedures to prevent and respond to SEA.
Target achieved to date as of March 31, 2021: On track/Objective 2
Baseline:
- Currently, not all of Canada’s partners have Codes of Conduct or related policies/procedures to prevent, investigate and respond to SEA.
Activity:
- Roll out a new requirement for partners to have a Code of Conduct to prevent, investigate and respond to SEA.
- Support the work of the Canadian Council for International Cooperation (CCIC) to strengthen CSO collaboration on preventing SEA.
Indicator
- % of new international development and humanitarian funding agreements that require organizations to have Codes of Conduct to prevent, investigate and respond to SEA.
- Type/amount of support provided to CCIC.
Completed Activities:
- A letter was sent from the branch’s Assistant Deputy Minister to partners to remind them of the importance of prevention, response from SEA especially during the global pandemic.
- The official launch of Digna, a 3-year project, by the Minister of International Development.
- Hosted a half day Prevention of Sexual Exploitation and Abuse (PSEA) Dialogue with Canadians CSOs in February 2021.
- Into 2021 continued ongoing work to include sexual misconduct clauses in remaining agreements and contracts (i.e. Requests for Proposals, contracts). Reviewing various international assistance processes.
- Continued communications and awareness and increased international coordination.
Results and Progress:
Before 2018, there was no formal or standardized requirement for Canadian and other non-governmental organization partner organizations delivering development assistance to have measures and policies in place to prevent and respond to SEA. Since then Canada has communicated clear expectations to partners. In addition, a standardized clause has been included in all contribution agreements, which requires that 100% of organizations applying for international assistance, development or humanitarian funding have a code of conduct addressing SEA. The PSEA Unit has also been ensuring the addition of clauses in the remaining templates and programs, which includes the Complex Request for Proposals template and Canada Fund for Local Initiatives Contribution Agreement. Guidance on the PSEA has been added in the CFLI guidelines. The PSEA Unit continues to coordinate internally to discuss the integration of the PSEA throughout the project cycle.
Canada has continued to actively engage with the Canadian civil society, including through the Canadian Council for International Cooperation (CCIC, rebranded as Cooperation Canada in October 2020) and the Humanitarian Response Network (HRN) to share best practices and tools in prevention, safeguarding, investigation and support measures for victims and survivors. On May 25, 2018, the Minister for International Development sent a letter to all current Canadian partners detailing the department’s expectations around codes of conduct, prevention and response efforts, and timely reporting to Global Affairs Canada. A half-day dialogue between CCIC members and Global Affairs Canada took place on September 21, 2018 to update on sector developments and to discuss key issues related to prevention and response to SEA. Since then, dialogues with the civil society organization sector repeat every year. The latest occurred in February 2021.
In May 2020, Partnerships for Development Innovation Branch’s Assistant Deputy Minister sent a letter to remind partners of the importance of prevention, response from SEA especially during the pandemic. In July 2019, Global Affairs Canada partnered with Cooperation Canada as the key umbrella organization for Canadian international development and humanitarian partners, to establish The Canadian Centre of Expertise on the Prevention of Sexual Exploitation and Abuse (known as “Digna”) to support capacity building of civil society organizations in Canada to prevent and respond to SEA in the delivery of international assistance. Resources, trainings and other services are being developed and delivered by Digna to address and to help close existing PSEA capacity gaps in the sector with an emphasis on supporting small and medium organizations. The official launch of Digna took place in January 2021 with the participation of the Minister for International Development.
Since the launch of an introductory training on PSEA, the PSEA Unit has continued to work on internal capacity building at Global Affairs Canada. Information sessions by the PSEA Unit continue to be offered and continued targeted communications promoting prevention and response to SEA are shared over the year.
Multilateral engagement
7. Permanent Mission of Canada to the United Nations
Context: The United Nations (UN) plays a significant role in the development of norms and guidelines pertaining to WPS. A wide array of New York-based UN bodies address WPS, including first and foremost the United Nations Security Council (UNSC), but also the General Assembly (UNGA), the Peacebuilding Commission (PBC), as well as departments such as the Department of Political and Peacebuilding Affairs, the Department of Peace Operations, and funds and agencies such as UN Women and UNFPA. The WPS agenda has become increasingly institutionalized at the UN, with the adoption of nine United Nations Security Council Resolutions (UNSCR) pertaining directly to WPS, the completion of a Global Study on 1325, the establishment of an Informal Experts Group in the Security Council, Women’s Peace and Humanitarian Fund, and the appointment of gender and women protection advisors to key UN offices and field missions. That being said, a number of challenges remain for the full implementation of WPS commitments at the UN: WPS is not mainstreamed throughout the work of the organization; several key members of the UN, including permanent members of the Security Council, do not fully support the WPS agenda; there are recurring incidents of SEA by UN peacekeepers and staff; insufficient resources are dedicated to gender issues in the UN’s peace and security functions; too few women are appointed to senior roles at the UN or serve as peacekeepers; and implementation of WPS commitments remains weak.
Canada is seen as a leader on WPS at the UN as a key architect of UNSCR 1325, the Chair of the 58-member Group of Friends of WPS, a major donor to WPS efforts, and a principled voice on this issue. Canada can help advance the WPS agenda at the UN through advocacy and information sharing with member states and the UN, leadership in the Security Council and UNGA negotiations, collaboration with civil society groups, and public messaging including through social media.
Priorities: Support the increased and meaningful participation of women in peace processes
7.1 Target: Canada demonstrates strong commitment at the UN to ensuring increased and meaningful participation of women in peace resolution processes, including in conflict prevention, mediation and post-conflict reconciliation, and more specifically delegations to peace resolution processes.
Target achieved to date as of March 31, 2021: On track/Objective 1
- Delivered 10 statements at the UNSC that called for the meaningful participation and inclusion of women in peace processes and more broadly in peace and security issues.
- Convened the Group of Friends of WPS on 6 occasions, facilitating discussions with experts on a variety of issues related to the agenda, including women’s meaningful participation in the peace processes.
- Met several times virtually with women’s organizations such as the Global Network of Women Peacebuilders, the NGO Working Group on WPS, and women civil society briefers to the UNSC.
- Promoted women’s participation in peace processes as a central pillar of the UNSC campaign.
- Used Canada’s role as Chair of the PBC to increase the meaningful participation of women in all peace and security matters under its purview, including a fivefold increase of women peacebuilders briefing the Commission and the adoption of a Gender Action Plan.
- The implementation of our targets has been the impact of the COVID-19 pandemic. As New York became the epicenter of this global health crisis for many months, UN operations were significantly curtailed and modified. This had a resulting impact on the Mission’s ability and methods to do its work and its engagement with both UN interlocutors and outside stakeholders.
Baseline:
- Of the 504 agreements signed since the adoption of resolution 1325 in 2000, only 27% included references to women. In peace processes between 1992 and 2011, women made up only 2% of chief mediators, 4% of witnesses and signatories, and 9% of negotiators.
Activity:
- Conduct advocacy with the UN Secretariat, through meetings, letters, statements, and joint advocacy of the Friends of WPS to encourage the UN to ensure increased and meaningful participation of women in peace processes, including as mediators.
- Highlight the positive impact of including women in peace processes during UN meetings and side events.
- Host women mediators and participants to peace processes during side events and at meetings of the Friends of WPS.
- Discuss with the Department of Political Affairs and the Group of Friends of WPS further steps needed to promote increased and meaningful participation of women in peace processes.
- Promote the implementation of the Department of Political Affairs guidelines on gender-inclusive mediation.
Indicator:
- # of meetings of the Group of Friends of WPS that discussed peace processes
- # events hosted or supported to increase awareness and understanding of women’s roles in peace processes, mediation, conflict prevention or peacebuilding
- # of meetings at the Permanent Mission to the UN with women mediators and participants to peace processes, as well as women’s civil society groups and women peacebuilders on peace processes
- # of Canadian statements to UNGA, Security Council, and other forums that mention participation of women in peace processes
Completed Activities:
- Delivered 10 statements at the UNSC that notably called for the meaningful participation and inclusion of women. This included national and Group of Friends of WPS statements during the UNSC Open Debate on Sexual Violence in Conflict, a national and Group of Friends of WPS statements during the UNSC Open Debate on Women, Peace and Security, a national statement delivered during the UNSC Open Debate on the Middle East, a statement by the Group of French-speaking Ambassadors to the United Nations in support of a strong and effective multilateral response in the context of the COVID-19 pandemic, a national statement during the UNSC Open Debate on Peace Operations and Human Rights, a national statement during the Open Debate on Cooperation between the UN and the International Organisation of La Francophonie, a national statement during the UNSC Open Debate on the 20th Anniversary of UNSCR 1373 and the establishment of the Counter Terrorism Committee, and the UNSC Open Debate on ensuring equitable access to COVID-19 vaccines in contexts affected by conflict and insecurity.
- These calls for the meaningful participation and inclusion of women were echoed in various UNGA statements and interventions made throughout the reporting period, including through the negotiation work in the six main Committees. For example, Canada delivered or joined 11 statements during Third Committee raising concerns about the gender dimension of various human rights issues or situations. Canada also joined six statements delivered on behalf of a group of likeminded countries during Third Committee supporting language on access to sexual and reproductive health care and services and highlighted concerns about the growing negative impact of the COVID-19 pandemic on women and girls in humanitarian settings in our national statement at the Humanitarian Affairs General Debate.
- Convened the Group of Friends of WPS on six occasions, facilitating discussions with experts on a variety of issues related to the agenda, including women’s meaningful participation in the peace processes.
- Met several times virtually with women’s organizations such as the Global Network of Women Peacebuilders, the NGO Working Group on WPS, and women civil society briefers to the UNSC.
- Included women’s participation in peace processes as a central plank of Canada’s UNSC campaign.
- Consistently raised the issue of women’s participation and advocated for the inclusion of women’s organizations and networks in country-specific, thematic, and regional meetings of the PBC. Through Canada’s role as Chair of the PBC, maintained a strong focus on equal rights and empowerment of women and girls, as well as women’s political participation, ensured a strong focus on gender and WPS was reflected in all of the PBC’s products and written advice, and adopted a Gender Action Plan with metrics and benchmarks to track implementation of the PBC’s 2016 gender strategy.
- Permanent Mission of Canada to the United Nations (PRMNY) participated actively as a Board member of the Women’s Peace and Humanitarian Fund which seeks to raise funding for women peacebuilders in the field so as to ensure their full and equal participation in peace and security.
- During UNGA 1st Committee on Disarmament and International Security, called for women to be meaningfully engaged as full partners in policymaking, programming, and field work in non-proliferation, arms control, and disarmament.
- Canada was a co-sponsor of the UN – INTERPOL resolution and was successful in including language specific to women’s effective, full and meaningful inclusion in this resolution for the first time, including the need to have women in senior leadership positions in all aspects of law enforcement.
- Advocated for increased women’s participation in UNSC meetings and briefings as well as to outside stakeholders.
- Pushed for language on the meaningful participation of women in peacekeeping during UNGA Special Political and Decolonization Committee (4th Committee) discussions on peacekeeping and at the Special Committee on Peace-keeping Operations (C34).
- Implemented the PRMNY Gender Pledge, which among other things calls for balanced gender representation in Canadian delegations, strong language on gender equality and women’s empowerment in resolutions, statements, and side events, and regular consultations with women’s groups and groups promoting gender equality and the human rights of women and girls on the full range of policy areas, not simply those directly on the topics of gender equality and women’s rights.
- Raised the issue of women’s participation in the peace process in Afghanistan in the Group of Friends of Afghanistan, chaired by Canada. Participated in the newly created Group of Friends of Women of Afghanistan. In this capacity, spearheaded the first ever statement of both Groups of Friends on 22 March, 2021, to condemn increased violence and targeted killings in Afghanistan on behalf of 35 of the members of the Group of Friends of Afghanistan and/or the Group of Friends of Women in Afghanistan.
- Promoted Canada’s co-chair of the WPS Focal Points Network along with Uruguay and participated and helped to organize a series of events from the Network.
- As chair of the ECOSOC Ad Hoc Advisory Group on Haiti, raised the issue of women’s meaningful participation in the course of the Group’s activities.
- Canada led efforts in 2020 to add new and stronger language on gender and WPS in the General Assembly resolution on Afghanistan.
- Through the Group of Friends of WPS and in collaboration with UN Women and the Group of Friends of Preventing Violent Extremism, Canada hosted a unique convening of civil society representatives who participated in a global consultation on CT and PVE. This provided a unique opportunity for Member States to engage directly with women civil society representatives on these issues ahead of the Global Counter-Terrorism Strategy negotiation process.
Results and Progress:
Canada continues to be seen as a leader on the WPS agenda at the UN. This is in part due to its role in developing UNSCR 1325, but it is sustained through the chairing of the Group of Friends of WPS and the broader promotion of gender equality and women’s empowerment across the board in all forums within the UN system. Canada’s leadership on the Elsie Initiative for Women in Peace Operations, building upon Canada’s Feminist Foreign Policy and Feminist International Assistance Policy has further bolstered Canada’s credentials as a leader in this area. The nomination of a Canadian Ambassador for Women, Peace and Security helped to cement Canada’s leadership and visibility on this file. This issue has also become a central feature of Canada’s UNSC bid and its Chairship of the Peacebuilding Commission (PBC).
Canada has consistently and visibly called for the meaningful participation of women in all areas of peace and security, notably conflict prevention and peace processes. The Mission took every opportunity to deliver statements at the UNSC and UNGA both in formal and high-level sessions as well as informal and working level discussions that recognized women as agents of positive change in the context of peace processes, and called for accountability for sexual violence, and consistently raised the issue of women’s political participation in PBC meetings. Canada also raised the meaningful participation of women regularly as part of its chairmanship of the Group of Friends of WPS, which now counts over 60 member states amongst its ranks. In FY 2020/21, the Mission convened the Group of Friends six times, facilitating discussions with experts on a variety of issues related to the agenda, including women’s meaningful participation in the peace processes. The Mission also implemented its Gender Pledge which calls for gender balance delegations and the promotion of women’s participation in all aspects of peace and security. Members of the Mission also met several times through virtual means to exchange information on challenges and opportunities with women’s organizations such as the Global Network of Women Peacebuilders, the NGO Working Group on WPS, and women civil society briefers to the UNSC. Lastly, the mission maintained close contact with UN Women, the Peacebuilding Support Office (PBSO), and the Department of Political and Peacebuilding Affairs (DPPA), to discuss how best to include women in peace processes.
Despite these efforts, the participation of women in peace and security decision making remains very low. All signs also show that this trend has been further exacerbated by the ongoing COVID-19 pandemic. There has also been a general downtrend in the inclusion of gender provisions in peace agreements. While not in Canada’s control, these cases have highlighted the failures of the current approach on women’s participation despite repeated and high level calls for increasing women’s participation in peace processes.
Priorities: Support the integration of gender into UN peacekeeping
7.2 Target: Canada demonstrates strong commitment to supporting gender-responsive UN peacekeeping missions, including aiming to double the number of women peacekeepers, in line with UNSCR 2242.
Target achieved to date as of March 31, 2021: On track/Objective 5
- Demonstrated strong leadership in increasing the meaningful participation and overall number of women in peacekeeping operations, notably the Elsie Initiative on Women in Peace Operations and related Elsie Fund for Uniformed Women in Peace Operations.
- Pushed for greater participation of women in peace operations in statements to the UNSC, UNGA 4th Committee, the C-34, the UN Peacekeeping Ministerial conference process, and the Group of Friends of WPS.
- CHALLENGE: While Canada continues to demonstrate strong commitment to gender-responsive peacekeeping and to meeting the gender targets set by the UN, overall numbers on women in peace operations will not achieve the targets set out in UNSCR 2242 or the Uniform Gender Parity Strategy without a significant increase in the rate of change. Canada must also continue to lead by example in its own UN deployments.
Baseline:
- Women make up only 3% of UN military peacekeepers; several vacancies remain in gender advisor and women protection advisor positions in UN missions; and implementation of WPS guidelines is incomplete in UN peacekeeping missions.
Activity:
- Highlight the importance of gender-responsive peacekeeping in statements to the Special Committee on Peace Operations (C-34), UNGA Fifth Committee, as well as other UN, civil society, and academic forums.
- Advocate for appropriate funding related to gender analysis and women’s protection in UN peacekeeping budget at the UNGA Fifth Committee.
- Advocate for gender-sensitive language and language supporting the implementation of the WPS agenda in reports of the C-34.
- Expand activity and profile of 1325 Military and Police Advisors Network, co-chaired by Canada, to raise awareness in military advisor community on role of WPS in increasing operational effectiveness.
- Aim to hold meetings of 1325 Military and Police network on a quarterly basis.
- Share best practices on gender-responsive peacekeeping with UN Secretariat and other Member States.
- Undertake regular consultations on peacekeeping with women’s civil society groups
- Facilitate the nomination of qualified Canadian women to peacekeeping positions.
Indicator:
- Appropriate inclusion of gender-specific language in C-34 and the Fifth Committee documents
- # of, and participation in, meetings of 1325 Military and Police Advisors Network and the WPS Chiefs of Defence Network
- % of peace and security officers of Permanent Mission of Canada to the UN who has received training on gender
- # of consultations hosted by the Permanent Mission of Canada to the UN with women’s civil society groups on peacekeeping
- # of Canadian statements to UNGA, Security Council, and other forums mention participation of women in peace operations
Completed Activities:
- Took on a mission-wide leadership in increasing the meaningful participation and overall number of women in peacekeeping operations, notably the Elsie Initiative on Women in Peace Operations and related Elsie Fund for Uniformed Women in Peace Operations.
- Organized and participated in a series of side events and panel discussions to promote and raise awareness on this issue.
- Pushed for greater participation of women in peace operations in statements to the UNSC, UNGA 4th Committee, the C-34, the UN Peacekeeping Ministerial conference process, and the Group of Friends of WPS.
- Canada actively participated as an Action for Peacekeeping (A4P) WPS Champion and participated in meetings of the Champions to discuss how to increase the number of uniformed women in UN peace operations.
- Conducted advocacy with UN Police on increasing the number of women police in peacekeeping.
- Conducted advocacy with UN DPO and Office of Military Affairs in developing concept of engagement teams, involving women peacekeepers.
- Advocated for a prominent WPS role at the 2021 Peacekeeping Ministerial.
- Engaged with UN DPO and other like-minded Member States on extra-budgetary projects on enhancing WPS in peacekeeping operations.
- Delivered a statement with Australia and New Zealand to UNGA 4th Committee that stressed the importance of gender-responsive peacekeeping and increasing the number of women peacekeepers.
- Pushed language in C34 on the importance of increasing women’s participation in peacekeeping operations.
- Worked with like-minded states in UNGA 5th Committee to protect funding for Women Protection Advisors and Gender Advisors in UN peacekeeping operations.
- Within the PBC, Canada advocated for strengthening the gender component in written PBC advice to the UNSC submitted in advance of the mandate renewals.
- Participated in monthly meetings of the Women’s Military Network, an informal group of women police and military advisors at the UN.
- The Mission also undertook regular bilateral outreach to Member States interested in the Elsie Initiative Fund and supported the efforts of UN Women once the first call for proposals was launched.
- Engaged in outreach in support of HQ-led initiative to secure donations from other member states to the Elsie Initiative Fund.
- Together with the Global Affairs’ Elsie Team, the Mission organized two high-level side-events on the role of uniformed women in peace operations and the importance of leadership to increase their numbers (29 May, 2020 and 23 October, 2020). These meetings attracted high-level participation from other Member States and UN officials.
- Throughout Canada’s campaign for a non-permanent seat to the UNSC, the Mission highlighted the importance of increasing the number of women in peace operations and advocated for some of the innovative measures Canada had brought forward to address this long-standing issue.
- In the annual review of Military and Police Advisory Committee (MPAC)’s Terms of Reference, Canada was instrumental in ensuring gender inclusive language was incorporated in the document and the participation of the Chair of the Women Military Network in the Committee.
Results and Progress:
Canada is one of the strongest and most visible proponents at the UN of increasing gender responsiveness of UN peace operations and of encouraging women’s full and meaningful participation including as a means to achieve greater operational effectiveness. FY 2020/21 continued to see a major and fundamental positive change in discussion on women in peacekeeping due to the Elsie Initiative for Women in Peace Operations led by Canada, and in particular the Elsie Initiative Fund for Uniformed Women in Peace Operations which truly became operational. Thanks to the truly innovative approach of the Fund and Canada’s important financial contribution, we are recognized as a true leader in this field by the UN and other member states. Through its dedicated position focusing on this issue, PRMNY has increased its capacity on gender and peacekeeping. The Mission as a whole continued to promote and advance these objectives in all aspects of its work, from UNGA Fifth Committee and C34 negotiations, within the military and police circles and as a central plank of Canada’s bid for a non-permanent seat to the UN Security Council.
Canada took every relevant opportunity to deliver statements at high-level forums calling for new and creative thinking to resolve persistent barriers to female participation and leadership in peacekeeping and to promote the innovative solutions proposed through the Elsie Initiative. During its 2021 substantive session, PRMNY negotiated in partnership with Australia and New Zealand to champion the inclusion of gender-responsive language in the documents of the Special Committee on Peacekeeping Operations with positive results. PRMNMY successfully advocated for strong language on women in peace peacekeeping, SEA and Women, Peace and Security in the final report. In the annual session of the UNGA’s Fifth Committee, Canada remained a strong advocate for the indispensable role of women in UN peacekeeping operations, continually emphasizing that women’s participation at all levels is key to the operational effectiveness of missions. This included prioritizing and supporting posts in the UN peacekeeping budget implementing WPS activities such as women protection advisors, gender advisors, and SEA investigators. PRMNY also took every opportunity to highlight the importance of the WPS Chiefs of Defence Staff Network and to highlight its contributions to promoting change within militaries and to reduce barriers for women in national armies and, ultimately, in UN peace operations.
It is important to recognize that despite strong political commitment from Canada and other partners, the participation of women in peace operations overall is still very low and will not meet the targets to double the number of women peacekeepers set out in UNSCR 2242 and reinforced in the Uniform Gender Parity Strategy unless continued efforts and more measures are taken both by the UN and member states, and in particular large troop and police contributing countries. Much work still needs to be done in order to implement the institutional and cultural shift necessary to truly ensure the meaningful participation of women in all UN peace operations.
Priorities: Support the prevention of SEA in UN peace-keeping operations
7.3 Target: Canada demonstrates strong commitment to strengthening the UN peacekeeping prevention efforts, accountability measures, transparency, and tangible victim support for SEA.
Target achieved to date as of March 31, 2021: On track/Objective 2
- Demonstrated active support for the UN's SEA Victims' Rights Advocate and Special Coordinator in order to continue to improve approaches to addressing SEA and ensuring their implementation,
- Participated actively in the Circle of Leadership on the prevention of and response to SEA in UN operations
- Sought to strengthen UNGA 5th Committee resolution on cross-cutting issues, including on SEA
- CHALLENGE: Further steps are required domestically to close loopholes on SEA committed by Canadians at the UN. Ongoing advocacy also required to ensure that other member states also appropriately tackle their cases of SEA.
Baseline:
- The UN recorded 145 allegations of SEA involving UN peacekeepers and civilians in 2016. However, many more cases go unreported, the UN lacks support for survivors of SEA and there are loopholes in accountability for SEA by UN staff. Moreover, several Member States are actively seeking to weaken the UN’s response on SEA.
Activity:
- Advocate to strengthen the UN’s zero-tolerance policy in order to provoke a shift at the UN from a culture of denial and avoidance to a one of prevention and responsibility
- Discuss with Member States, the UN Secretariat, the Friends of WPS, and civil society the ways to improve accountability for SEA committed by UN peacekeepers and staff
- Use high-level events and other multi-lateral engagements in the UNGA and Security Council, as well as the Friends of WPS to advocate for SEA reform and implementation of UNSCR 2272 (2016)
- Provide support and feedback to the Office of the Special Coordinator on SEA
- Encourage UN Secretariat to undertake actions within its remit to address SEA
- Identify opportunities and events to encourage member-states to contribute to SEA survivors’ assistance efforts
- Promote SEA training as part of UN-supported training and capacity-building initiatives
- Respond in a constructive and timely fashion to queries from the UN conduct and discipline unit
- Include reference to SEA in outcome documents of forthcoming Peacekeeping Ministerial Meeting in Vancouver
- Share best practices on addressing SEA with other Member States
Indicator:
- # of meetings of the Group of Friends of WPS that discussed SEA
- # of Canadian statements to UNGA, Security Council, and other forums in which the issue of SEA was mentioned
- # of instances of Canadian participation in high-level meetings where SEA was discussed
Completed Activities:
- Strongly advocated for inclusion of new language on SEA in the C34 report.
- Raised the issue of SEA in a variety of UN fora, including during a UNSC Open Debate on Peacekeeping and Human Rights.
- Canada continued to support the UN SEA Victim’s Trust Fund and to engage with UN officials on plans for an upcoming SEA High-Level Meeting and for the sharing of information amongst Member States.
- Continued to advocate for an end to SEA and a zero-tolerance policy through the UN Military and Police networks.
- Continued to serve as a member of the UN’s Circle of Leadership to end SEA.
- Continued to participate in the new Group of Friends to Eliminate Sexual Harassment in the UN.
- Sought to strengthen UNGA 5th Committee resolution on cross-cutting issues, including on SEA.
- Seconded a CAF officer to the office of the Special Coordinator on SEA to assist with UN efforts.
- Along with Australia and New Zealand, delivered a statement to UNGA 4th Committee that condemned SEA and pledged support to UN’s zero tolerance policy.
- Canada played an active role in ensuring that SEA and sexual harassment are kept as an annual standing item on the agenda of the Executive Boards and that the Agencies kept these Boards (which Canada actively engages in) informed on matters of SEA as well as sexual harassment.
- Through its Gender Pledge, the Mission enforces a zero-tolerance policy on sexual harassment, for both mission staff and visitors to the mission. Furthermore, employees are encouraged to report sexual harassment and are provided with a confidential mechanism to do so.
Results and Progress:
Canada, through its Mission to the UN, continued to be a steadfast partner of the UN in its efforts to prevent and eradicate SEA and to exert pressure to improve prevention of and response to SEA. Canada continued to support the activities of the Circle of Leadership on the prevention of and response to SEA in UN operations and proposed language in UNGA 5th Committee and C34 negotiations to strengthen the UN’s response. These actions complement and extend the ongoing financial and in kind support provided by Canada to both the United Nations Trust Fund on SEA and the Office of the Special Coordinator on SEA.
According to the UN, the number of cases of sexual exploitation and abuse reported for peacekeeping and special political missions has slightly decreased, with 66 allegations reported in 2020 related to peace operations compared with 80 allegations reported in 2019. It is not yet clear what impact the COVID-19 pandemic, and its effects on peace operations and deployments has had. As with all cases of sexual violence, these numbers underestimate the scale of the problem. Moreover, underreporting of allegations implicating personnel from other UN entities and non-UN personnel working with implementing partners is a continuing concern. While increased attention and a strong set of policies exist at the UN-level, the main challenge remains with member states and how they manage cases of sexual exploitation and abuse as well as of conduct and discipline. The issue of sexual harassment, including in the UN Secretariat and UN agencies is also become an increasing concern and one where greater attention needs to be focused.
Despite Canadian funding to an SEA Victims Trust Fund, UN financial support for victims of SEA is almost completely lacking and far from sufficient. There continues to be discrepancies between different parts of the UN system on how to address SEA. Finally, the UN SG hasn’t consistently repatriated peacekeepers from all countries with records of systematic sexual violence in conflict.
Priorities: Promote the increased representation of women in senior positions at the UN
7.4 Target: Canada demonstrates strong commitment to promoting greater representation of women in senior UN positions, especially those dealing with peace and security issues.
Target achieved to date as of March 31, 2021: On track/Objective 1
- The Mission succeeded in achieving gender parity in its nominations in FY 2020/21.
- Marcia Kran was reelected to the Human Rights Committee.
- The Mission is not wholly responsible for the candidates that come forward for various positions and that require Canada’s support.
Baseline:
- As of January 2017, 21% of UN senior positions were filled by women.
Activity:
- Work towards nominating more Canadian women to senior positions in the UN system (gender parity in nominations)
- Work with the Friends of Gender Parity group at the UN to support nomination of female candidates by all Member States and their appointment by the UN Secretariat
- Advocate to the UN for greater representation of women in senior positions in Canadian statements to the UNGA, Security Council, UN Fund board meetings, as well as other multilateral and bilateral advocacy opportunities
- Promote the UN Senior Women Talent Pipeline
- Decline to host or participate in all-male panels at the UN or the mission of Canada
Indicator:
- % of formal nominations, letters of support, e-mails or démarches to senior UN hiring managers in support of Canadians women applying for senior positions (>D1) in the UN system
- % of meetings of the Friends of Gender Parity group attended by Canada
Completed Activities:
- Nominated a greater proportion of women Canadians to senior positions in the United Nations system (gender parity in nominations).
- Undertook significant advocacy and outreach in order to support the reelection of Marcia Kran to the Human Rights Committee.
- Through several side events, highlighted the importance of women in senior UN positions, including in the area of peacekeeping.
- Implemented a Mission Gender Pledge which specified that all events (not official UN meetings) of three or more speakers organized by the Permanent Mission will have balanced gender representation and will strive to be representative of the UN’s diversity. Promoted this Mission Gender Pledge with other UN stakeholders.
- Attended and participated in meetings of the Group of Friends of Gender Parity.
- Disseminate with HQ and network abroad senior job openings at the UN and encouraging women candidates to apply.
Results and Progress:
Canada is a strong supporter of the Secretary General’s Gender Parity Strategy, which operationalizes the goal of gender parity, moving the UN from ambition to action. Overall, progress during the reporting period was positive. The Mission continued to advocate and promote gender equality in all senior UN positions.
PRMNY succeeded in achieving gender parity in its nominations in FY2020/21. During the reporting period, PRMNY provided nominations and/or letters of support for 10 positions at senior levels at the UN. Of these, 5 were men and 5 were women. Through significant effort, outreach and advocacy, the Mission also helped to secure the high-profile re-election of Marcia Kran to the Human Rights Committee.
PRMNY committed to regularly consulting with Member States, women’s groups, and groups promoting gender parity women and girls on the full range of policy areas, not simply those directly on the topics of gender equality and women’s rights. Canada participated in the meetings of the Friends of Gender Parity.
8. Canada at the North Atlantic Treaty Organization
Context: Canada is actively engaged in the advancement of the WPS agenda at NATO. The Joint Delegation of Canada works to mainstream GE and integrate gender and WPS considerations across committee work and in decisions taken at NATO. Canada is the largest contributor to the NATO 1325 Trust Fund, contributing $400,000 over FY 2017/18 to fund activities and programs run by the Office of the NATO Secretary General's Special Representative for WPS. Canada actively participated in shaping and developing the NATO WPS Policy and Action Plan. The Delegation of Canada promoted the organization of a meeting of the North Atlantic Council in March 2017 to review progress in the implementation of the NATO WPS Action Plan, which placed this issue on the Council's agenda on a periodic basis going forward. The North Atlantic Council is the principal political decision-making body of NATO. Canada pushed for language to strengthen the references to WPS in the Communiqué for the NATO Warsaw Summit in 2016, which was ultimately adopted into the text. In March 2016, Canada co-hosted with Iceland an event to mark International Women's Day, including a conference on GE with Permanent Representatives, Military Representatives, and senior NATO Representatives, and social media activities throughout the day. Canada is among the core group of the Friends of UNSCR 1325 at NATO and regularly convenes meetings of this group to push forward the WPS agenda at NATO. The Joint Delegation of Canada to NATO also published social media campaigns for the 16 days to Combat Violence Against Women and for International Women's Day, which have received pick-up internationally by prominent social media accounts. Canada provides financial assistance to the Office of the NATO Secretary General’s Special Representative for WPS, and also staffs the person who is now International Military Staff Office of the Gender Advisor at NATO headquarters; Canada works very closely with both of them on WPS issues at NATO.
Canada’s efforts are warranted because though progress has been made in integrating gender perspectives in NATO training, operations, and guidelines, women remain under-represented in the Alliance, particularly in decision-making positions. NATO Allies averaged 10.3% of women in their military ranks in 2014 with only 5.7% of women in NATO’s operations and missions. Furthermore, some Allies maintain restrictions for women in certain combat roles, a hurdle removed in Canada.
Priorities: Mainstream WPS and gender into NATO’s policies, activities and efforts on collective defence
8.1 Target: Canada remains a recognized leader within the Alliance on advancing and promoting WPS, helping to ensure that NATO and Allies increasingly integrate gender perspectives and WPS in all NATO’s work.
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Objective 1
- Canada remained the top financial contributor to the NATO WPS Office.
- To promote and help advance WPS implementation at NATO, Canada hosted over a dozen meetings of the “Group of Friends of 1325” and of the “Group of Friends of Human Security”. Canada also held regular advisory meetings bilaterally with NATO senior staff, and with like-minded Allies and Partners.
- The North Atlantic Council, the principal political decision-making body of NATO, held one dedicated meeting on WPS, to mark the 20th anniversary of UNSCR 1325.
- NATO Ministers of Defence placed WPS as a dedicated topic for discussion at one of their meetings, for the first time.
- Canada actively contributed its perspectives and expertise in policy events at NATO, including for example in four WPS-focused “digital dialogues”, one virtual “learning exchange”, three virtual workshops and one high-level online panel.
Baseline:
- NATO has a good track record of integrating gender perspectives into military doctrine, pre-deployment training and planning for major NATO out-of-area operations. However, more work is needed to integrate gender into activities related to collective defence.
Activity:
- Promote and push for increased integration of gender perspectives in NATO’s activities in areas such as response to hybrid warfare or enhanced Forward Presence in the Baltics
- Promote gender literacy as a core competence to be applied in day-to-day work at NATO
- Promote greater representation of women deployed to NATO-led operations, missions and crisis management activities
- Undertake North Atlantic Council level engagement on NATO’s current 1325 Action Plan
- Ensure that a North Atlantic Council meeting on 1325 Action Plan implementation is planned on an annual basis on the margins of International Women’s Day
- Advocate for increased financial human resources for the office of the WPS special adviser
Indicator:
- # of Canadian contributions to policy documents and activities demonstrating how WPS priorities and gender perspectives are integrated into NATO’s daily work
- # of informal meetings hosted by Canada to promote WPS implementation at NATO
- # of North Atlantic Council -level discussions on implementation of NATO’s Action Plan on WPS
- North Atlantic Council meeting on 1325 Action Plan implementation is held on an annual basis on the margins of International Women’s Day, as a result of Canadian requests
- # of donors and amount of financial and human resources for the office of the WPS special adviser are increased, as a result of Canadian advocacy.
Completed Activities:
- Worked closely with Canadian experts on WPS within NATO, including the NATO Secretary General’s Special Representative on WPS and the Gender Adviser in the International Military Staff, to advance the WPS agenda on both the civilian and military side.
- Provided funding support to the NATO WPS Office to assist in developing the integration of gender perspectives at NATO.
- Provided a Canadian WPS expert as a voluntary national contribution (VNC – a human resource lent by an Ally or Partner to NATO) to the NATO WPS Office, as of December 2019, for a mandate of two years.
- Continued to provide an expert as a voluntary national contribution to the NATO International Military Staff as their Gender Advisor (since July 2018).
- Continued to lead and grow the NATO “Group of Friends of 1325” – adding three new Allied members, and organising and chairing frequent meetings to promote WPS initiatives, facilitate WPS-related policy- and decision-making, and further integrate gender perspectives into NATO’s work.
- Established, and now lead, a new NATO “Group of Friends of Human Security” to advance work on human security issues, which also overlap with WPS issues (including conflict-related sexual violence).
- Ensured sustained North Atlantic Council-level (NAC) engagement on NATO’s implementation of UNSCR 1325, including mobilising Allies at Permanent Representative level for key WPS-related policy decisions, and for the October 2020 NAC meeting dedicated to WPS to mark the 20th anniversary of UNSCR 1325.
- Helped to ensure that WPS was included for the first time as a topic for discussion among Allied Defence Ministers at their meeting in October 2020.
- Advocated for WPS principles to be taken into account during discussions on NATO’s future direction.
- Consistently and systematically mobilized NATO Allies at all levels in advancing the WPS agenda to ensure that it is reflected throughout NATO’s work.
- Promoted WPS issues, gender equality and mainstreaming of gender perspectives into NATO policies, programmes, partnerships, activities, operations, and administrative matters, including the addition of a gender literacy component in discussions on NATO military requirement and resource decision-making, and promoting ongoing discussions on further integrating gender perspectives in the capability development process.
- Worked actively in formal and informal meetings to facilitate agreement on the development of NATO’s first-ever policy on the prevention and response to conflict-related sexual violence as a matter of priority.
- Actively contributed to the development of NATO’s first policy on preventing and responding to conflict-related sexual violence, including through subject matter experts from Canada.
- Actively participated in the development of a plan to implement NATO’s first policy on preventing and responding to sexual exploitation and abuse.
- Actively contributed Canadian perspectives to policy events at NATO, including several WPS-focused “digital dialogues” which facilitated expert discussions on key issues including gender and disinformation, and advancing WPS at NATO.
- Promoted greater representation of women at NATO and in peace operations, including by organising a presentation on Canada- and Norway-funded research on opportunities for women in peace operations, as part of a virtual “learning exchange”.
- Promoted gender literacy as a core competence to be applied in day-to-day work at NATO, including by contributing to the development of the new NATO Gender-Inclusive Language Manual, published in May 2020.
- Ensured the cross-cutting nature of WPS was taken into account as NATO advanced its human security agenda, including in the first-ever NATO Conference on Human Security in February 2020 where Canada chaired a workshop on Protection of Civilians, and also by mobilising all Allies and obtaining consensus on the importance of making progress on both NATO’s WPS and human security agenda.
- Strongly and consistently advocated for and supported the continued provision of adequate resources for the NATO WPS Office.
- Raised awareness about WPS issues through active public diplomacy engagement.
Results and Progress:
Canada remained a strong, highly-recognised leader on WPS within NATO. In FY 2020/21, Canada was still the top financial donor to the NATO WPS Office, contributing $800,000 over 2017-2021 as well as a Canadian WPS expert embedded in the NATO WPS Office to promote gender mainstreaming, develop training, and strengthen NATO’s monitoring and evaluation capacity, for example. Canada also helped ensure that NATO would continue to consider additional resources to support its WPS agenda.
Through its consistent efforts, Canada strengthened NATO’s WPS commitments by systematically advocating for integrating gender perspectives into all of NATO’s work, raising WPS and gender issues in every committee when appropriate, at all levels, both on the civilian and military side. Canadian officials meeting with NATO, including the Prime Minister, the Minister of Foreign Affairs and the Minister of Defence, also raised WPS during their discussions. In addition, as the leader of NATO’s “Group of Friends of 1325” and the new “Group of Friends of Human Security,” which Canada established in 2019, Canada continued to keep WPS issues top of mind at NATO by regularly convening meetings to continue advancing the WPS agenda – as well as human security issues which overlap with WPS, such as conflict-related sexual violence – in the absence of formal meetings restricted by the pandemic.
Canada’s voice on WPS is consistently sought-after and highly respected in the Alliance, and its contributions to NATO policy consultations were actively solicited and greatly appreciated. These included an expert advisory panel on conflict-related sexual violence, policy workshops including several “Digital Dialogues” on various WPS-related topics, and a virtual “learning exchange” where Canada facilitated an expert presentation on recent advances for women in peace operations. Canada’s Permanent Representative to NATO was also invited to speak as one of three guest panelists at an event on gender equality and leadership for International Women’s Day in March 2021.
During the reporting period, Canada hosted over 12 informal meetings with Allies, Partners and NATO Staff, including “Group of Friends” meetings, to advance WPS at NATO. The North Atlantic Council (the principal political decision-making body of NATO) also had one meeting dedicated to WPS to mark the 20th anniversary of UNSCR 1325, and, in October 2020, Allied Defence Ministers discussed WPS as an official topic for the first time, following consistent advocacy by Canada and like-minded Allies.
Canada also raised public awareness about WPS at NATO through two Twitter accounts (one in each official language), which feature NATO’s #WeAreNATO campaign as well as the work of civilian and military women at NATO, and through public diplomacy efforts.
Challenges:
Due to the COVID-19 pandemic restrictions, Canada was not able to host as many “Group of Friends” meetings as usual, and most higher-lever WPS meetings and events were postponed or cancelled. This was unfortunate, as these help boost the profile of WPS at NATO. Nevertheless, once virtual solutions were established, Canada was able to resume regular “Group of Friends” meetings, both to advance policy work and to discuss topics of interest to keep WPS top-of-mind at NATO.
Priorities: Enhance cooperation between NATO, Allies and partners on WPS in NATO’s work
8.2 Target: Canada demonstrates strong commitment to ensuring that WPS priorities are systematically included in NATO cooperative security frameworks, including defence and capacity-building projects on a systematic basis.
Target achieved to date as of March 31, 2021: On track/Objective 1
- Canada’s strong commitment to ensuring that WPS priorities are systematically included into all of NATO’s strands of work including cooperative security, where relevant, was recognised amongst Allies, Partners and NATO staff.
- Canada actively advocated for sustained Partner involvement as appropriate in NATO’s WPS activities.
- Canada actively promoted integrating gender perspectives into partnership tools.
- Most active Partners are making consistent efforts to reference and / or provide meaningful activities on WPS and/or on gender in their partnership frameworks.
Baseline:
- Partners’ WPS-related activities are increasing, but continue to be undertaken in an ad-hoc manner, and upon Partners’ requests, rather than as a requirement by NATO.
Activity:
- Strengthen integration of gender in defence and capacity-building projects
- Promote projects that train women in the defence and security sector in Partner countries
- Encourage partner countries to deploy women in NATO-led operations and exercises
- Help NATO ensure that conditions for these deployments are facilitated
Indicator:
- # of defence and security capacity-building packages that integrate gender perspectives further to Canadian intervention
- % and # of countries that reference and provide meaningful activities on WPS in their partnership frameworks further to Canadian intervention
Completed Activities:
- Consistently raised WPS issues with Partners as part of NATO’s regular engagement on partnerships policy and implementation, when possible given the COVID-19 pandemic restrictions.
- Actively contributed the Canadian perspective on WPS at virtual policy and public diplomacy events with Allies and Partners.
- Advocated for appropriate Partner participation in virtual WPS- and human security-related workshops and policy events.
- Through the “Group of Friends of 1325” which Canada leads, ensured that Partners remained informed about NATO’s work on the WPS agenda and solicited their input, as appropriate.
- Worked actively in formal and informal meetings to ensure that appropriate cooperative security principles were taken into account during the development of NATO’s first-ever policy on the prevention and response to conflict-related sexual violence.
- Contributed significantly to NATO's new WPS Global Database, which aims to provide support for Allies and Partners on the development and revision of National Action Plans (NAPs) through a database of best practices with comprehensive and accessible information.
Results and Progress:
Over the reporting period, Canada helped to ensure that WPS issues remained high-level priorities for the Alliance, including in its cooperative security frameworks. Canada systematically raised gender and the importance of advancing the WPS agenda in its meetings with NATO Partners, including in meetings of the North Atlantic Council (the principal political decision-making body in the Alliance), in committee discussions on cooperative security frameworks such as partnership plans or assessments, and in informal meetings with Partners on how to better advance cooperation on WPS issues in the NATO context.
Canada is a highly respected leader on WPS among NATO Partners, and is frequently approached by Partners wanting to increase cooperation with NATO and Allies on WPS issues. Canada systematically advocates within the Alliance for such increased cooperation, as the WPS agenda is a topic of Partner interest with a high potential for fruitful cooperation and mutual growth. As such, Canada advocated for and helped ensure the participation of Partners in appropriate WPS- and human security-related discussions throughout the reporting period. In addition, through the NATO Allies and Partners chapter of the “Group of Friends of 1325,” Canada helped keep Partners informed as appropriate of NATO’s WPS activities, and solicited their input and participation in various NATO events and information gathering activities. This helped them continue to feel connected and involved in WPS at NATO despite pandemic restrictions.
Canada was also able to contribute its expertise and perspectives during WPS-related cooperative security activities, including a large virtual event to which all NATO Allies and Partners were invited to discuss NATO Partnership cooperation in the WPS context (October 2020). In addition, Canada contributed significantly to NATO's new WPS Global Database (https://www.globalwps.org/), launched on International Women’s Day in March 2021, which aims to provide support for Allies and Partners on the development and revision of National Action Plans (NAPs) by providing a compendium of comprehensive and accessible information on the overall commitments of NATO Allies to WPS, including best practices – fulfilling a key principle of cooperative security.
Challenges:
NATO’s cooperative security work was particularly affected by the COVID-19 pandemic and subsequent restrictions given its reliance on international travel and on in-person meetings. As such, Canada was not able to advocate with Partners as strongly and as regularly as usual for inclusion of WPS and gender issues, but did raise it whenever possible, including during online meetings once virtual working solutions were implemented. In addition, although the importance of advancing the WPS agenda receives broad consensus amongst most Partners, the necessary culture change in the historically male-dominated military and security and defence sectors is incremental. Cooperation on the WPS agenda is still often seen as peripheral to more important cooperation on “hard security” issues. Nevertheless, these views are slowly changing, as consistent advocacy from Canada along with like-minded Allies and Partners is resulting in WPS and gender issues increasingly being recognized as important, and WPS efforts increasingly being discussed and implemented in cooperative security frameworks as a matter of course.
Priorities: Promote the increased representation of women in senior positions at NATO
8.3 Target: Canada supports the increased representation of women in senior positions at NATO.
Target achieved to date as of March 31, 2021: On track/Objective 1
- Canada proposed, when possible, qualified Canadian women candidates for senior positions at NATO and encourages Allies to do likewise.
- Canada, when possible, led by example by appointing women to senior-level positions in the NATO context.
- NATO’s recruitment practices increasingly helped to encourage female applicants.
Baseline:
- The increase in the number of women in NATO senior level positions is stagnating.
Activity:
- Advocate increased appointment and representation of women in senior positions
- Propose, when possible, qualified Canadian women candidates for senior positions at NATO and encourage Allies to do likewise
- Provide input into the study on identifying barriers to representation of women in senior positions at NATO, begun in 2017 with funding from Canada
- Raise the issue of accountability by senior decision-makers at NATO for diversity in the workplace
Indicator:
- Canadian contribution to the study identifying barriers to representation of women in senior positions conducted at NATO
- # of Canadian interventions calling for more women in senior positions
Completed Activities:
Continued to raise the issue of accountability by senior decision-makers at NATO for diversity in the workplace by consistently highlighting the importance of gender balance in senior positions at NATO, including during management meetings on human resources and during discussions on NATO’s future direction.
- Helped ensure that the importance of encouraging gender diversity is reflected in material used for recruitment.
- Helped make progress towards eliminating barriers to women’s participation in NATO’s International Staff through a Canada-funded study published in November 2020 which identified issues with recruitment, selection and career advancement, and made recommendations for improvement.
Results and Progress:
Women are unfortunately consistently under-represented in senior-level positions in the Alliance. In order to support the increased representation of women in senior positions at NATO, Canada has consistently highlighted the importance of female leadership, and has advocated strongly and consistently for the inclusion of measures that encourage female applicants in NATO recruitment procedures. A Canada-funded study published in November 2020 should also help identity and propose solutions to break down barriers to women’s recruitment, selection and career advancement within the NATO International Staff. Canada also contributed to public diplomacy material to be used in recruitment which emphasizes diversity and inclusion, including gender diversity.
Canada tried to lead by example wherever possible by proposing qualified Canadian women candidates within the Alliance: during the reporting period, Canadian women filled relatively senior positions at NATO Headquarters, including the NATO Secretary General’s Special Representative on WPS, and the Gender Adviser in the International Military Staff. In addition, Lieutenant-General Frances Allen, the highest-ranking woman in the Canadian Armed Forces, was appointed Canada’s Military Representative to the Military Committee in August 2020.
Furthermore, Canada has been setting positive examples by appointing female military officers to key senior positions elsewhere in the NATO enterprise. Notably, Canadian Commodore Josée Kurtz, the former Commander of the Standing NATO Maritime Group Two (SNMG2), was the first woman to be given such a command in NATO history. One of the highest-ranking women in the Canadian Armed Forces, then-Major-General Jennie Carignan, commanded NATO Mission Iraq from November 2019 to November 2020. From September 2018 to July 2020, Brigadier-General Darlene Quinn was in command of Canada’s Formation Europe and was Canada’s National Military Representative to Supreme Headquarters Allied Powers. Then-Lieutenant-General Christine Whitecross was the first woman to command the NATO Defense College in Rome from November 2016 to July 2020.
Challenges:
Women remain under-represented in the Alliance, particularly in senior decision-making positions, despite the proportion of occupying senior roles having increased from 11% to 30% since 2002. Canada is encouraging NATO and Allies to continue to increase the representation of women, particularly at senior levels, within both the International Staff and the International Military Staff, and in operations. As stated above, Canada tries to lead by example, filling relatively senior positions at NATO Headquarters with Canadian women, such as the NATO Secretary General’s Special Representative on WPS and the Gender Adviser in the International Military Staff. Allies, Partners and the Alliance alike have raised the particular challenge of recruitment and retention in the traditionally male-dominated defence and security sector, and have held discussions on potential causes and solutions.
9. Permanent Mission of Canada in Geneva
Context: The mission participates in a range of Geneva-based UN bodies and other intergovernmental organizations that are active on security, human rights, humanitarian issues, migration, health, labour and disarmament, as well as trade and development, and that can effect change in the lives of women and girls in fragile and conflict-affected states. Among these organizations are the Human Rights Council; UN High Commissioner for Refugees; International Organization for Migration; International Federation of Red Cross and Red Crescent Societies/ICRC; International Labour Organization; World Health Organization; and the Conference on Disarmament. The mission also engages on a number of additional Geneva-based processes that are relevant including on protection of medical missions and on standards for private military and security companies. In addition, Canada is a governing board member or participant in many relevant Geneva-based international CSO and advocacy groups.
Priorities: Advance WPS in Geneva-based multilateral fora and other organizations
9.1 Target: By the end of FY 2018/19, the Mission develops key messages on WPS and uses them systematically in multilateral institutions and processes, governing boards and councils, and advocacy groups that can effect change in the lives of women and girls in fragile and conflict-affected states.
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Objective 1
- We consider to have achieved or surpassed the target within the limits of what was possible in these exceptional circumstances.
Baseline:
- The Mission advances the WPS agenda on a consistent basis.
Activity:
- Include language in national statements, resolutions, and outcome documents, in collaboration with other states and civil society, to amplify messages on women’s and girls’ human rights in fragile and conflict-affected states; women’s empowerment and the advancement of GE, including through women’s increased and meaningful participation and effective political decision-making in fragile and conflict-affected states; and the use of sex- and age-disaggregated data to support an evidence-based approach
- Promote gender analysis, increased and meaningful participation and effective representation of women, and specific consideration of women’s and girls’ human rights when participating in governing boards, councils, intergovernmental organizations, and donor groups
Indicator
- Key messages on WPS developed and systematically used in a manner tailored to context (Y/N, by program)
- Qualitative assessment of changes in Geneva-based multilateral institutions and processes, governing boards and councils, and advocacy groups that can effect change in the lives of women and girls in fragile and conflict-affected states
Completed Activities:
Disarmament, Peace and Security
- Efforts continued to add language on gender perspectives in UN General Assembly First Committee resolutions.
- During its chairmanship of the Anti-Personnel Mine Ban Convention (APMBC) Committee on Article 5 Implementation, Canada ensured that the Committee systematically mainstreamed gender in its activities, considering matters related to gender and the diverse needs and experiences of people in affected communities in every aspect of its work.
Humanitarian
- When taking part in governing board and bilateral meetings with its humanitarian partners, Canada systematically delivered key messages, emphasizing the needs and capabilities of women and girls, calling for a gender-responsive and participatory approach to humanitarian action and for stepped-up efforts to prevent, mitigate and respond to sexual and gender-based violence (SGBV). Governing board meetings included 3 sessions of UN High Commissioner for Refugees (UNHCR)’s Standing Committee, the negotiation of its OMNIBUS resolution as well as its annual Executive Committee meeting. For the International Committee of the Red Cross (ICRC), it included two Donor Support Group policy fora and the Annual Meeting of the Donor Support Group.
Human Rights
- At the 45th Human Rights Council (HRC45), Canada was part of a core group that presented a new resolution originally entitled “Accountability for women and girls in humanitarian settings”. The final negotiated title was “Promoting, protecting and respecting women’s and girls’ full enjoyment of human rights in humanitarian situations” and it requested the United Nations High Commissioner for Human Rights to produce an analytical report on this topic at HRC49 in 2022. The core group expects to present a follow-up resolution in 2022 based on the content of that report and will aim to involve the Group of Friends of Women, Peace and Security in consultations on the resolution.
- Also at HRC45, Canada supported and co-sponsored a different (also new) resolution on “Promoting and protecting the human rights of women and girls in conflict and post-conflict situations on the occasion of the 20th anniversary of Security Council resolution 1325 (2000)”. This resolution requested the High Commissioner for Human Rights to produce an analytical report, to be followed by an interactive dialogue, on the current state of play of the mainstreaming of the human rights of women and girls in conflict and post-conflict situations in the work of the Human Rights Council. The report and dialogue were scheduled for HRC48 in 2021.
Results and Progress:
Disarmament, Peace and Security
At the UN General Assembly First Committee (1C) in October 2020, Canada led a process to increase gender perspectives in resolutions, successfully contributing to the adoption of new language on gender equality in several resolutions. In addition, Canada, in its national statement, stressed that applying a gender perspective across all disarmament issues remains fundamental, not only in terms of equal participation in disarmament processes, but also in recognizing the differentiated gender impacts of weapons.
During its chairmanship of the Anti-Personnel Mine Ban Convention (APMBC) Committee on Article 5 Implementation, Canada ensured that the Committee, in its interactions with mine-affected states, systematically emphasized the decisions on gender mainstreaming at the APMBC Fourth Review Conference (RevCon4) and the related commitments for mine-affected states, as well as the consensus recognition by RevCon4 that boys, girls, men and women are affected differently by anti-personnel mines. Canada also ensured that the Committee systematically offered assistance to mine-affected states regarding the implementation of the relevant commitments.
Human Rights
Canada advocated for progressive language on women’s human rights and gender equality during negotiations on Human Rights Council (HRC) resolutions related to fragile, conflict and post-conflict settings (e.g. resolutions on Burundi, Central African Republic, Democratic Republic of the Congo, Libya, Mali, Myanmar, Somalia, South Sudan, Syria and Yemen).
As co-chair of the Women’s Human Rights and Gender Network, Canada continued to promote the WPS Agenda in human rights mechanisms (e.g. HRC, Universal Periodic Review (UPR), treaty body reviews, Special Procedures mandates, etc.) among States, civil society, UN entities and academia which are members of the network.
Challenge:
In FY 2020/21, the main challenge faced in implementing this target has been the COVID-19 pandemic, which caused the postponement/cancellation of events, limited access to resources and in some cases created new competing priorities.
9.2 Target:
- Geneva-based Group of Friends of WPS is established and Canada will lead it or actively participate in it.
- By 2022, the Group of Friends will contain at least 20 member states and work with at least four CSO, and it will support engagement on the WPS agenda in at least three Geneva-based forums.
Target achieved to date as of March 31, 2021: Target achieved or surpassed – 9.2.1, 9.2.2/Objective 1 and 1
- Canada leads the Group of Friends on WPS. The Group includes 33 Member States and 14 civil society organizations observers, in addition to UN Women and the UN Population Fund. In its FY 2020/21 activities, the Group has engaged on WPS issues related to peacekeeping, the Arms Trade Treaty (ATT), the Programme of Action to Prevent, Combat and Eradicate the Illicit Trade in Small Arms and Light Weapons in All Its Aspects, the Group of Governmental Experts on Problems Arising from the Accumulation of Conventional Ammunition Stockpiles, and the Anti-Personnel Mine Ban Convention (APMBC).
Baseline:
- There is an informal network of friends of WPS that meets periodically to coordinate for the Human Rights Council.
Activity:
- Build on interest in Geneva to have a Group of Friends of WPS
- Establish Group of Friends of WPS in collaboration with other interested member states
Indicator
- Qualitative assessment of progress in establishment of a Group of Friends
- Geneva-based Group of Friends on WPS exists (Y/N), Canada participates (Y/N)
- # of members in the Group of Friends on WPS (once created)
- # of CSO collaborating with the Group
- # of sector-specific gender advocacy groups in which Canada is involved that integrate WPS
Completed Activities:
- In April 2020, Canada invited members and observers of the Group of Friends on Women, Peace and Security to support the UN Secretary-General’s call for a global ceasefire and to engage on this issue in Geneva following a joint statement led by the Permanent Mission of Canada in New York.
- In May 2020, Canada invited members and observers of the Group of Friends on Women, Peace and Security to engage with the UN Institute for Disarmament Research (UNIDIR) on the findings of its report “Gender Perspectives in Arms Control and Disarmament: Views from Africa”.
- In July 2020, Canada invited members and observers of the Group of Friends on Women, Peace and Security to participate in a webinar hosted by Spain (member of the Group) on the commemoration of the 20th anniversary of UN Security Council (UNSC) Resolution 1325.
- In July 2020, Canada invited members and observers of the Group of Friends on Women, Peace and Security to participate in the e-learning course “Introduction to Gender & Diversity in Mine Action” created by the Geneva International Centre for Humanitarian Demining with funding from Canada.
- In October 2020, Canada invited members and observers of the Group of Friends on Women, Peace and Security to an event co-hosted by Canada on the linkages between the WPS Agenda and arms control and disarmament, where panelists examined further possibilities to integrate WPS priority topics into arms control and disarmament processes (such as the Arms Trade Treaty, the Programme of Action to Prevent, Combat and Eradicate the Illicit Trade in Small Arms and Light Weapons in All Its Aspects, and the Group of Governmental Experts on Problems Arising from the Accumulation of Conventional Ammunition Stockpiles) and vice-versa. The event featured two civil society organizations and three women speakers.
Results and Progress:
Launched in 2018, the Group of Friends on WPS is led by Canada and composed of 33 Member States and 14 civil society organizations observers, in addition to UN Women and the UN Population Fund. The members agreed that the Group would function as a network of well-informed stakeholders, notably by organizing WPS-relevant events and by sharing information, both at meetings and via other means (e.g. virtual discussions), in order to identify gaps and opportunities for collaboration across different WPS sectors:
- Human Rights;
- Humanitarian Affairs;
- Non-Proliferation, Arms Control, and Disarmament;
- Accountability, Responsibility to Protect (R2P) and International Humanitarian Law; and
- Representation and Participation of women (cross-cutting).
These efforts aim to mainstream WPS in existing mechanisms where applicable, avoiding duplication and maximizing impact. In its FY 2020/21 activities, the Group of Friends on WPS has engaged on:
- Peacekeeping;
- The Arms Trade Treaty (ATT);
- The Programme of Action to Prevent, Combat and Eradicate the Illicit Trade in Small Arms and Light Weapons in All Its Aspects;
- The Group of Governmental Experts on Problems Arising from the Accumulation of Conventional Ammunition Stockpiles;
- The Anti-Personnel Mine Ban Convention (APMBC).
Challenge:
In FY 2020/21, the main challenge faced in implementing this target has been the COVID-19 pandemic, which caused the postponement/cancellation of events, limited access to resources and in some cases created new competing priorities.
Priorities: Support the increased and meaningful participation in Geneva-based fora of women from fragile and conflict-affected states
9.3 Target:
- By the end of FY 2019/20, the mission has sponsored of partnered to support at least three activities related to women in FCAS per year.
- By the end of FY 2021/22, the mission supports at least 20 women or women’s groups per year.
Target achieved to date as of March 31, 2021: Mostly on track – 9.3.1, 9.3.2/Objective 1 and 1
- In FY 2020/21, the mission supported 3 activities related to women in fragile and conflict-affected states.
- In FY 2020-21, the mission supported 7 women, in addition to those among the 140 participants to the event “Leaving No One Behind: Ensuring an age, gender and diversity inclusive approach to internal displacement” who were supported through the provision of interpretation services (exact figure unknown).
Baseline:
- Canada supported two women’s groups in the FY 2015/16. A number of programs indicated that this was something that they are not presently doing, or are not consistently doing, but see this as a potential area for advancement.
Activity:
- When women or women’s groups from fragile and conflict-affected states come to Geneva to participate in peace talks, or to take part in multilateral meetings, the Mission will offer support in terms of meeting space, capacity building, facilitation of relevant bilateral meetings, and opportunities to share their experiences and priorities with the broader Geneva community of practice on peace and security issues.
Indicator:
- # of individual women peacebuilders, activists, etc. supported, not affiliated with a women’s group # of women’s groups supported
- # of relevant Mission programs supporting engagement
- qualitative assessment of outcomes linked to the participation of women’s groups that the mission supports
Completed Activities:
Disarmament, Peace and Security
- Canada has consistently supported gender-balanced delegations when reviewing APMBC Sponsorship Programme applications.
- At the event of October 2020 co-hosted by Canada on the linkages between the WPS agenda and arms control and disarmament, panelists included three women from the following organizations: The Elders, UN Office for Disarmament Affairs, UN Institute for Disarmament Research.
Humanitarian
- At the event “Leaving No One Behind: Ensuring an age, gender and diversity inclusive approach to internal displacement”, which was a multi-stakeholder dialogue aiming to identify key recommendations on age, gender and diversity for the High-Level Panel on Internal Displacement, panelists included four women from the following organizations: Women’s Refugee Commission, Plan International, Hurras Network and Save the Children. In addition, 140 participants (from Geneva permanent missions, civil society organizations, UN agencies and academia) were provided the support of interpretation in Arabic and French (costs covered by GENEV) to ensure inclusive participation.
Results and Progress:
As a contributor to the Anti-Personnel Mine Ban Convention (APMBC) Sponsorship Programme, Canada regularly receives, through the Sponsorship Programme Coordinator, applications seeking sponsorship to attend meetings of the APMBC. In this capacity, we have consistently supported gender-balanced delegations.
Sponsorships are administered by a third party. Canada has asked that its funding prioritize opportunities for women to be part of delegations, but the number of candidates varies and is ultimately up to the sending organization.
Canada also contributes to the Biological and Toxin Weapons Convention (BTWC) Sponsorship Programme and has requested that its funding prioritize opportunities for women delegates.
Challenge:
In FY 2020/21, the main challenge faced in implementing this target has been the COVID-19 pandemic, which caused the postponement/cancellation of events, limited access to resources and in some cases created new competing priorities.
Priorities: Strengthen WPS and gender analysis capacity within the Mission
9.4 Target: By the end of the FY 2018/19, all Mission officers working with internationally-oriented institutions and organizations that have the ability to effect change in the lives of women and girls in fragile and conflict-affected states are trained in gender competence and develop, on an ongoing basis, gender expertise as it relates to their respective responsibilities.
Target achieved to date as of March 31, 2021: Mostly on track/Internal capacity and efficiency
- 20 out of 27 mission officers working with internationally-oriented institutions and organizations that have the ability to effect change in the lives of women and girls in fragile and conflict-affected states were trained in gender competence.
Baseline:
- 12 out of 27 officers confirmed having taken departmental-organized training. Among those that had not taken the training, 2 had a relevant professional or academic expertise in gender analysis.
Activity:
- Ensure officers working receive training on gender and WPS
Indicator:
- # of officers who are trained on gender and WPS
Completed Activities:
- Mission staff were reminded that GBA Plus online training is available and received the relevant information to access it.
Results and Progress:
27 positions were identified as relevant under this indicator for the reporting period. These were filled by 14 women and 13 men. Of this group, 11 women and 9 men reported having received relevant training.
Challenge:
In FY 2020/21, the main challenge faced in implementing this target has been the COVID-19 pandemic, which caused limited access to resources and in some cases created new competing priorities.
10. Canada at the International Organization of La Francophonie
Context: One of the four major priorities of la Francophonie is peace, democracy and human rights. The International Organization of La Francophonie (OIF) programming in this area, which is directly supported by Canadian voluntary contributions, includes transitions and electoral processes; support for State and civil society actors in the areas of democracy, human rights, as well as crisis and conflict prevention and management; and the maintenance and consolidation of peace. WPS is addressed notably through the Francophone Women’s Network for Peace. Within the OIF, there are several opportunities to raise issues and promote solutions related to WPS: the various meetings of the OIF working groups and commissions; the meetings of the Permanent Council of La Francophonie and of the Ministerial Conference of La Francophonie; the Francophonie Summit and various thematic conferences; meetings of various boards and general assemblies of operators and of other institutions of La Francophonie (Association internationale des Maires francophones, Agence universitaire de la Francophonie , Senghor University, Institut de la Francophonie pour le développement durable); the preparation of the OIF’s strategic framework, programming, strategies; as well as the preparation of resolutions and statements by Heads of State and government.
Priorities: Advance the WPS agenda in La Francophonie
10.1 Target: Key messages on WPS are used regularly in relevant OIF meetings that can effect change in the lives of women and girls in fragile and conflict-affected states.
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Objective 1
- Canada has been proactive in the past year in communicating key messages on gender equality and Women, Peace and Security (WPS) considerations at relevant IOF meetings.
Baseline:
- Canada advances the WPS agenda on an ad hoc basis.
Activity:
- Include language in national statements to be delivered in working groups and committees, resolutions, and outcome documents, in collaboration with other states to amplify messages on women’s and girls’ human rigts in conflict-affected, transition and fragile states; women’s empowerment and advancement of GE, including in meaningful participation and effective political decision-making in conflict-affected, transition and fragile states; and the use of sex- and age- disaggregated data to support an evidence-based approach
- Intervene in support of meaningful participation and effective representation of women, and specific consideration of the human rights of women and girls when participating in relevant working groups and committees and at the Permanent Council
- Use the development of the OIF strategy on GE and the creation of an entity within the OIF for the promotion of GE, rights and empowerment of women and girls to promote Canadian messages about WPS
- Advocate for the participation of women human rights defenders and women peacebuilders in OIF events and high-level meetings.
Indicator:
- Standardized key messages developed and used regularly (Y/N)
- Key messages integrated in la Francophonie documents
Completed Activities:
- Made regular interventions on the WPS issue within the framework of the IOF and with member countries, particularly during meetings of the Permanent Council of La Francophonie and the Ministerial Conference, during Canada's meetings with the operators and bodies of La Francophonie, and within the framework of the organization's commissions and working groups.
- Made an intervention to add a reference to the United Nations Security Council Resolution 1325 on Women, Peace and Security (WPS) in the Resolution on Living Together during the Covid-19 pandemic and in the post-Covid world emanating from the Ministerial Conference of the Francophonie (CMF) in November 2020.
- Advocated for the addition of a paragraph on the importance of women's participation in the exit from the crisis in Mali, as part of the IOF resolution on this issue in November 2020.
- Organized a consultation with 19 Francophonie partners on "Women, Peace and Security in the Francophone Space" in December 2020.
- Continued monitoring of IOF programming related to WPS issues, and its results.
Results and Progress:
Canada is recognized as a leader in WPS and GE within the Francophone space. Canada's activities and forums for advancing WPS issues during the period supported women's participation and effective representation, and highlighted the particular importance of advancing women's and girls' rights in peacebuilding and conflict prevention and management contexts. Canada's interventions and actions have led to concrete results, including:
- The effective integration of WPS issues in the areas of conflict prevention, mediation, and peacekeeping and peacebuilding into many of the organization's programs, discussions and resolutions. Canada's ongoing work has been particularly apparent in the IOF Resolution on Mali, and the Resolution on Living Together during the Covid-19 pandemic and in the post-Covid world, both adopted in November 2020. Canada's interventions have better reflected WPS issues, including more specific language on women and girls, vulnerable people, diversity, sexual and reproductive health care for all and reproductive rights, media freedom and protection of journalists, resilience of education systems, and the need for urgent action to bridge the digital divide.
- Regular sharing of expertise on WPS and GE with all partners in the Francophone space. In particular, the consultation conducted by Canada with 19 of its Francophonie partners on "Women, Peace and Security in the Francophone Space" in December 2020 made it possible to establish recommendations and avenues for cooperation within the Francophone space. This meeting demonstrated Canada's leadership and proactivity on these issues and was very well received by the participating states.
Canada continues to encourage the use of gender indicators and the achievement of results in the area of GE within the OIF. It is expected that the new HFE unit, established in 2020, will enable the IOF to better meet Canadian expectations in this regard in the future.
WPS issues have generally been addressed by the IOF in recent years, as demonstrated by the Francophonie's Strategy for the Promotion of Gender Equality, Women's and Girls' Rights and Empowerment, the IOF's 2019-2022 Quadrennial Programming, and the creation of the WPS Unit.
Challenges:
Two challenges, however, have limited our ability to achieve results. The first is the multilateral context and the difficulty of building consensus with other parties who do not share Canada's priorities in WPS. Canada has generally been able to advance its priorities despite this context, thanks to the collaboration of several affinity countries. The success of the December 2020 consultation demonstrates that Canada can count on several allies within La Francophonie to advance these considerations.
Furthermore, the IOF's gender equality and monitoring and evaluation resources are still being developed. This represents a second challenge that limits the organization's ability to optimally integrate and monitor WPS issues in its programming. Canada supports the IOF through targeted expertise and funding to increase the IOF's capacity in this area.
Priorities: Strengthen gender analysis capacity within Global Affairs Canada’s La Francophonie-team
10.2 Target: By the end of FY 2021/22, two officers working on the OIF, one Ottawa-based and one Paris-based, are trained on gender to provide, on an ongoing basis, gender expertise as it relates to their respective responsibilities.
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Internal Capacity Building
- Although the target has been exceeded, it will be important to monitor the training that will come in the next year to ensure that new employees integrate well into the Francophonie team, both at headquarters and in Paris, receive required training.
- Periodic staff turnover presents a challenge to maintaining GE expertise within the team. This risk is mitigated by the high proportion of staff trained on these issues, both in Paris and at headquarters.
Baseline:
- 5 out of 5 officers identified as not having formal training.
Activity:
- Ensure training is provided on gender to the headquarters and PARIS officers
Indicators:
- # of officers trained on gender
Completed Activities:
- In previous years, the Deputy Director and three officers responsible for La Francophonie took a two-day training course on gender equality. The two officers based in Paris also took online courses on gender-based analysis plus (GBA Plus). In addition, the deputy director took an online training course on integrating gender equality considerations into policy development, and the senior Francophonie desk officer at headquarters took the "Gender Analysis Plus (GBA Plus)" and "Gender, Peace and Security" courses.
- With several of these officers still in place, the Francophonie teams at headquarters and in Paris still have the expertise required for their respective responsibilities.
Results and Progress:
Although no new officers received significant training on GE issues this year, the Francophonie team still exceeds the target of two trained officers. Indeed, four Francophonie officers at headquarters and in the field (PARIS) have received at least one training on GE, which allows them to act effectively with Francophonie institutions in the development of positions, policies and programs covering WPS and gender equality issues. These trainings have also allowed for the development of a better internal knowledge of the resources available to support Canada's interventions on gender equality in the Francophonie context.
For the 2021-22 fiscal year, it is expected that new employees will also benefit from training.
11. Canada at the Organization for Security and Co-operation In Europe
Context: Canada has been actively engaged in ensuring the adoption of several specific policies and measures in support of GE for the OSCE, both with participating States and within the Organization itself. Canada promotes the continued implementation of the 2004 OSCE Action Plan for the Promotion of Gender Equality (APPGE), advocates for the provision of more detailed data in its annual GE report, and helps identify ways for the Organization’s Secretariat, institutions and field operations to further integrate GBA Plus in day-to-day operations. Canada also actively advances and promotes priorities such as:
- developing a gender-responsive approach to security, including disarmament and security sector governance and reform, and combatting VAW;
- increasing the representation of women managers in higher positions at the OSCE and in missions;
- setting specific priorities for the promotion of women’s rights in line with UNSCR 1325 key priorities;
- highlighting and promoting the role of women in conflict prevention and peace reconstruction processes; and
- monitoring and evaluating progress on the implementation of the APPGE by the OSCE Secretary General and in the Unified Budget development process.
Priorities: Mainstream gender and WPS in the OSCE Secretariat, Institutions, and Field Missions
11.1 Target: Canada demonstrates strong commitment to supporting the OSCE Secretariat in promoting better integration of gender perspectives in its activities and operations.
Target achieved to date as of March 31, 2021: Mostly on track/ Objective 1
- During the reporting period, the Canadian Mission at the Organization for Security and Co-operation in Europe (VOSCE) raised gender equality and Women, Peace and Leadership in over 20 interventions in formal meetings, including the Permanent Council and the Forum for Security Cooperation.
- There will be a strong focus on WPS in the 2021 Ministerial Council and gender perspective is reflected in several draft decisions being discussed ahead of the Ministerial.
- Women in the 1st Dimension have set-up a mentoring program between senior delegates and more junior colleagues.
Baseline:
- The OSCE Secretariat is demonstrating efforts to address its weak track record in integrating gender perspectives in all three dimensions of comprehensive security by establishing internal mechanisms and by completing the development of its 2017-2020 Road Map for the implementation of the Gender Action Plan, which sets priorities and an accountability framework for each department.
Activity:
- Promote women’s increased and meaningful participation and integration of gender perspectives in all OSCE activities related to prevention, mediation and post-conflict reconciliation through statements at the Permanent Council, conferences and OSCE committees in relations to the OSCE Secretariat, institutions and field missions’ work
- Support efforts to integrate gender perspectives in OSCE field missions, operations, and projects and sensitize senior management in field operations on the importance of gender mainstreaming by promoting the establishment of a gender advisor if not already in place
- Continue dialogue with the OSCE Gender Unit on how to improve gender mainstreaming in all of the OSCE operations and activities, including by promoting the use of Canada’s GBA Plus as a tool to train OSCE staff
- Promote women’s participation in OSCE conferences and events addressing the conflict cycle and the role of women
- Advocate for increased financial and human resources for the Gender Unit and enhanced involvement of the OSCE Senior Gender Advisor in the Secretariat’s policy and decision-making processes
Indicator:
- # of relevant Canada interventions advocating for OSCE field missions that have a mission-specific Gender Action Plan or Strategy
- # of interventions by Canada encouraging that OSCE field missions have a mission specific Gender focal point
- # of OSCE field missions that have an identified Gender Advisor or National Programme Officers dedicated to gender issues
- # of OSCE projects supported by Canada through in-kind or financial contribution that have gender mainstreaming identified in their objectives
- increased resources allocated to the OSCE Gender Unit for the implementation of gender mainstreaming due to Canada’s leadership in the OSCE Unified Budget negotiations
Completed Activities:
- Provided high-caliber speakers/chairs and, as a matter of principle, raise gender and WPS in Canada’s interventions in various events every time it is relevant.
- Participated in informal networks:
- VOSCE Ambassador was involved in Women OSCE Ambassadors meetings
- Pol-Mil Counsellor was involved in Women in the 1st Dimension
- VOSCE DPR participated in Men Engage network
- VOSCE participated in bi-weekly discussions on advancing gender objectives with the Chairperson-in-office and like-minded.
Results and Progress:
Concrete action within the OSCE that will lead to actual progress is highly dependent on political will. VOSCE’s efforts aimed at building that political will, one speaker and one intervention at a time.
VOSCE regularly raised gender equality and Women, Peace and Leadership in its official statements to demonstrate its commitment and support of the OSCE Secretariat. OSCE gender-based Networks (Women Ambassadors, Women in 1st Dimension, and Men Engage) were initially informal and established mainly to share views on priority issues, but have rapidly evolved into concrete advocacy tools. For example, Women Ambassadors at the OSCE has become a voice in itself, now delivering statements at the Permanent Council, on behalf of the women ambassadors, highlighting their contribution at the OSCE. These interventions and active engagement in gender-based Networks were critical this year in ensuring a strong focus on WPS in the lead-up to the 2021 Ministerial Council.
Challenge:
In the OSCE the notion of “gender” creates deep divides along national-sociological lines, and there are persistent efforts by certain participating States to roll back previously agreed language. The inclusion of WPS or gender equality language in Ministerial decisions, which are essential to generate progress, is an uphill battle. It requires relentless efforts from delegations determined to achieve concrete results. Canada and like-minded delegations often have to be prepared to renounce or compromise progress in other areas in order to make some gains on gender, and sometimes even only to maintain the acquis.
Priorities: Mainstream WPS and gender into the politico-military efforts of the OSCE
11.2 Target: Canada demonstrates strong commitment to ensuring the systematic integration of gender perspectives into OSCE capacity-building initiatives and outreach activities such as training, conferences, workshops, etc., especially with defence forces, operational law enforcement agencies, and other security-related government entities.
Target achieved to date as of March 31, 2021: Mostly on track/Objective 1
- VOSCE arranged the participation of three high-caliber women speakers in security related events where women are often under-represented.
Baseline:
- The OSCE has a weak track record of integrating gender perspectives into its work in political-military affairs. In 2015, the number of gender projects at the OSCE increased, with a total of 81 projects reported within the political-military dimension that included gender perspectives. In the first dimension (political-military), only 11% of the projects reported had GE as a principal objective, 35% had GE as a significant objective or were fully gender mainstreamed, while the majority (54%) reported to have mainstreamed gender with regard to female participation only. Canada (RCMP/ Global Affairs Canada HQ/ VOSCE) participated in the first OSCE meeting on Gender Mainstreaming in Operational Responses to Violent Extremism and Radicalization that Lead to Terrorism in November 2016 and contributed to its main recommendations.
Activity:
- Promote and enable the work of the Senior Gender Advisor in Vienna and the Gender Advisor of the Special Monitoring Mission in Ukraine through meetings, brain storming sessions, by requesting follow up with the Secretary General and his office on identified issues and challenges
- Provide support to gender-related CT projects being developed by the CT Office in the OSCE Office for Democratic Institutions and Human Rights
- Promote the annual OSCE "NAP Academy” in Vienna to other participating States and civil society
- Share best practices on integrating gender considerations into pol-mil initiatives with other States in the process of renewing or updating their NAPs through the OSCE WPS Group of Friends, the NAP Academy, by inviting relevant experts and delivering statements
- Promote the role of women in countering violent extremism with reference to Canada’s best practices and lessons learned in statements in OSCE Counter terrorism related meetings and conferences and better understanding of their role as perpetrators of violent extremism
- Advocate that monitors deployed to the Special Monitoring Mission Ukraine, including on VAW in conflict zones, are trained on GBA Plus
- Identify, analyse and promote the use of gender data relevant to the pol-mil work of the OSCE in all aspects of the conflict cycle
- Invite a representative from the Canadian Armed Forces to present Canadian efforts and lessons learned regarding the integration of women in the armed forces
- Provide support to conduct a household-level survey to be implemented in 10 OSCE States focusing on VAW and paying particular attention to experiences of women in conflict and post-conflict settings in order to gather useful data in the OSCE region
Indicator:
- # of Canadian statements or interventions at the OSCE (Ministerial Council, Permanent Council, Forum for Security Cooperation and other OSCE fora) that advanced integration of gender considerations in the political-military efforts of the OSCE, including in counter terrorism and violent extremism
- # of Ministerial Council decisions and drafts decisions on political-military efforts of the OSCE that relate to WPS/gender and the overall degree [Low, Medium, High] of Canadian engagement in their negotiations
- Degree to which [Low, Medium, High] data disaggregated for gender is gathered in OSCE field missions
Completed Activities:
- Provide high-caliber women speakers/chairs:
- In May 2020, Jacqui O’Neill, Ambassador for WPS, participated on a panel in an OSCE webinar on “Women Peacebuilders”.
- In July 2020, as the Parliamentary Assembly’s Special Representative on Gender, The Honourable Hedy Fry spoke about “Women, Peace and Security” at the OSCE Mediterranean Partners Meeting. She also moderated a session of the OSCE Economic and Environmental Forum on “Promoting Women equal participation in the labour market” in February 2021.
- In February 2021, Raquel Garbers, Director General, Strategic Defence Policy, National Defence, spoke about “Competition below the threshold of Armed conflict” at the OSCE High Level Military Doctrine Seminar.
- As a matter of principle, raised gender and WPS in Canada’s interventions in various events every time it is relevant.
Results and Progress:
Since 2018, the Secretariat has been tracking the gender balance in panels at the OSCE conferences and meetings. In 2020, the gender imbalance was reduced by 18%. While women are overrepresented on panels in the human dimension, representation within the 1st Dimension (politico-military) remains low. Raquel Garbers for example was the only woman to present at the High Level Military Doctrine Seminar among more than 20 male speakers. VOSCE’s constant efforts to secure the participation of highly qualified female speakers within the 1st dimension are important not only to shift the gender balance on panels but also to incorporate gender equality into the security sector. VOSCE will be taking on the role of 1st Dimension (pol-mil) chair for 2022, and will use this position to work to improve the gender balance of speakers in this area.
Priorities: Promote the increased representation of women at the OSCE
11.3 Target: By 2020, the 2004 OSCE Gender Action Plan is fully implemented by the OSCE Secretariat, with leadership by Canada.
Target achieved to date as of March 31, 2021: Mostly on track/ Objective 1
- Out of the four highest-level positions at the OSCE, which were all filled in 2020, two were filled by women, including the Secretary General and the Representative on Freedom of the Media.
- At the director levels women currently occupy four out of the seven existing posts. This is up from 2 in the previous fiscal year.
Baseline:
- The 2004 OSCE Gender Action Plan has yet to be fully implemented, and requires updating. Women are systematically under-represented in political-military related positions, whilst over-represented in human rights and fundamental freedoms positions. Women are also present in low numbers amongst the heads of OSCE institutions and field operations. In 2015, for all non-HOM seconded posts to OSCE field missions, Canada nominated 42 women candidates as compared to 164 men (of which none of the eight DHoM candidates were women.) Canada successfully advocated for an upgrade of the OSCE Special Monitoring Mission’s Gender Adviser in the 2017-2018 budget of the Special Monitoring Mission in Ukraine.
Activity:
- Actively promote the appointment of women as heads of OSCE institutions (Secretary General, Office for Human Rights and Democratic Development, Representative for Freedom of the Media, High Commissioner for National Minorities and OSCE field missions)
- Seek out women nominees for secondment by Canada
- Promote increased representation of women in first dimension related work at the OSCE, including as speakers on political-military and security issues
- Engage with the newly nominated Senior Gender Adviser and like-minded participating States to organize targeted activities, such as working luncheons or side events, to coordinate and advance internal and external OSCE efforts to achieve active participation of women
- Use budget negotiations to promote the need for gender-based indicators and the use of gender markers in all OSCE executive structure budget proposals
- Promote efforts to ensure gender balance is taken into account in recruitments and secondments to OSCE missions
- Encourage other participating States to nominate women candidates for the various posts in the OSCE, most notably at senior levels
- Ensure that all Canadian training offered in the OSCE context is gender-representative and gender -mainstreamed
- Continue advocating for the upgrade of the Chief of the Gender Unit to allow more access and decision making capacity
Indicator:
- % and # of women candidates nominated by Canada for secondment, including at senior levels
- # of events held by the Mission to support and advance the active participation of women in the OSCE, including by inviting Canadian guests
- # of female experts invited by Canada to participate in OSCE-related events, on all substantive issues dealt with by the OSCE
- % and # of women in executive positions at the OSCE, across all dimensions of the organization’s work
Completed Activities:
- Development of a matrix of gender language used in OSCE documents/decisions mapping the gender language used in the past as tool to prevent backsliding and support VOSCE and likeminded in negotiating gender language in future documents.
- Regularly advocate for balanced representation at senior levels of the organization.
- Participate in informal networks and raise gender and WPS in Canada’s interventions in various events every time it is relevant.
Results and Progress:
Up from 30% between 2015 and 2019, women occupied 42% of senior leadership positions of the OSCE by December 2020, exceeding the 2023 interim target of 30%. At the director levels women currently occupy four out of the seven existing posts. Representation of women in the senior contracted positions (professional) increased from 28% in December 2018 to 39% in December 2020, still short of the interim target of 50% in 2021. By contrast, the share of women leading OSCE field operations – which are all seconded positions – remains low at 20%.
While some progress has been made to increase women representation in leadership position and strengthen internal mechanism for gender equality, the full implementation of the 2004 OSCE Gender Action Plan remains a work in progress within the Organization. One of the most concrete actions Canada can take to increase gender equality is to put forward more Canadian women candidates for secondment and encourage more Canadian women to apply for contracted positions.
Bilateral engagement
Middle East
Middle East Strategy: On February 2, 2016, Cabinet approved the Whole of Government Strategy for Support to the Global Coalition Against Daesh, and Broader Engagement in Iraq, Syria, Jordan and Lebanon. The three-year Strategy (April 2016 – March 2019) integrates foreign policy, defence, and development so that Canada can make a modest but effective contribution to international efforts to help address the crises. The $2 billion commitment includes new funding of $1.5 billion, plus $0.6 billion in existing funding, to support Canada’s continuing efforts, to address immediate security threats while also providing support for the ongoing humanitarian crisis and longer-term development, security and stabilization needs in the region. Iraq and Syria are the main theatres of conflict and sources of instability in the region, while Jordan and Lebanon are the two neighbouring countries most at risk of destabilization, as they bear some of the greatest burden of the Syrian refugee crisis and face growing security concerns. In addition, Canada’s increasing support to experienced humanitarian partners in SRHR in emergencies, including in the Middle East, is helping to address gender-based gaps in access to reproductive health services; to integrate comprehensive GBV response and treatment in reproductive health; and provide safe spaces for women and girls. This whole-of-government Strategy is led by Global Affairs Canada, in partnership with the Department of National Defence, the Canadian Security Intelligence Service, the Communications Security Establishment, and the Royal Canadian Mounted Police.
12. Middle East Development Programming
Context: This section pertains to the coordination and integration of the whole-of-government Strategy in the Middle East. Thus some targets below pertain more broadly to Humanitarian Assistance, Security and Stabilization, Diplomatic Engagement as well as Development. In 2019, the Government of Canada renewed the whole-of-government Strategy in the Middle East for an additional two years to March 2021.
The Middle East Development Program operates in Iraq, Syria, Lebanon and Jordan. Like most of Canadian development programming over the past two and a half decades, it has made a concerted effort to advance gender equality objectives through its programming to reduce poverty and improve economic development, accelerate human and social development, defend human rights, build the capacity of women’s rights organizations, and create more equitable societies. The Middle East Development Program operates in Iraq, Syria, Lebanon and Jordan.
Priorities Increase mainstreaming of WPS and gender into development programming in Middle East
12.1 Target: Canada will significantly increase the percentage of programming that integrates gender perspectives for the four countries under the Middle East Strategy (2016-2022).
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Internal capacity and efficiency
- 100% of development programming under the Middle East Strategy is now gender-integrated. This represents a completion rate of 105% of the 95% FIAP target, which has been achieved to date.
Baseline:
- At the beginning of FY 2016/17, 73% of development programming integrated GE at the GE01 to GE03 levels under the Middle East Strategy
Activity:
- Significantly increase integration of gender perspectives in our programming for the four Middle East countries during the Middle East Strategy (FY 2016/17 until FY 2018/19)
- Advance the GE policy dialogue and development advocacy in the Middle East
Indicator
- % of programming in the four countries of the Strategy that is gender integrated
Completed Activities:
Canada has significantly increased the percentage of development programming that integrates gender perspectives for the four countries in the Middle East Strategy (Iraq, Syria, Jordan, and Lebanon), from 73% at the beginning of FY 2016/17 to 100% for the FY 2020/21.
- In Iraq, Canada supported UNFPA under the initiative of Enhanced Governance for Improving the Well-Being of the Most Vulnerable Women and Girls in Iraq, and was able to complete the following activities:
- UNFPA, in coordination with the Kurdistan Region of Iraq’s High Council of Women’s Affairs and the Judiciary Commission, reviewed or developed policies and legal frameworks of Clinical Management of Rape protocol, Child Marriage Strategy, National GBV Strategy and the national and regional Violence Against Women strategies and action plans.
- Four Advocacy Campaigns were conducted and led by UNFPA in coordination with authorities in Iraq and the Kurdistan Region of Iraq (KRI). This included: 16 Days of Activism; a sensitization workshop for the enactment of the Anti-Domestic Violence Law at the federal level; Conflict-Related Sexual Violence Campaign (June 19); and an awareness raising campaign on International Women’s Day (March 8).
- One reproductive health policy was revised and the Family Planning Strategy was finalized.
- In Jordan, Canada continued to integrate gender perspectives in Jordan by focusing on these priority areas:
- Supporting the empowerment of women and girls through two new GE03 projects;
- Improving the quality and sustainability of gender-sensitive health, public security and municipal services, and expanding access to quality gender-responsive and inclusive public education in Jordan; and
- Creating economic opportunities for women and youth in Jordan.
- Canada has also advanced gender equality (GE) policy dialogue and development advocacy in Jordan, including through:
- Donor coordination group meetings on GE, with the participation of the Jordanian National Commission on Women and the Ministry of Planning;
- Bilateral and joint donor advocacy efforts to integrate and advance GE in Government of Jordan planning (through the Economic Growth Matrix) and programming in education, response to the COVID-19 pandemic, among others;
- Creation and leadership of a new Gender Sub-group of the Humanitarian and Development Partners’ Group (HDPG);
- Chairing a GE Network of all development partners to strengthen their capacity to integrate and report on GE results;
- Officers proactively raising the issue of GE with partners during project design, and when necessary, dedicating resources (i.e. local gender advisor, and support from HQ GE group) to strengthen the projects’ GE results and integration strategy;
- On an ongoing basis, officers seek GE specialists’ feedback on their projects’ GE reporting, and work with their implementing partners to improve it over time.
- In Lebanon, two Gender Donor Coordination Group meetings were organized. Bilateral and joint donor advocacy was undertaken for improved data and reporting on gender at the national level, and the integration of gender in strategies, plans, programs and crises response by the Government and development and humanitarian response actors
- Canada played a leadership role in advancing women’s economic rights in Lebanon, supporting the Government in the implementation of its National Action Plans for Women’s Economic Empowerment, through the World Bank Mashreq Gender Facility. In FY 2020/21, technical assistance was provided to support the revision of legal frameworks that discriminate against women, and with Canada’s support the law criminalizing sexual harassment has been developed and adopted by parliament.
Results and Progress:
In Iraq, Canada continued to advocate a gender-sensitive approach as a means of enhancing the overall effectiveness and sustainability of stabilization and security-related efforts and supported the development of Iraqi women’s collective capacity to contribute to stability and reconciliation at the local and governorate levels. With Canadian support, UNFPA has enabled 12,167 women and girls to access gender-based violence (GBV) services through women protection facilities in 12 districts of Iraq. 295 individuals, including GBV specialists, case managers, focal points and coordinators participated in writing GBV standard operating procedures. 31 social workers and case managers trained to provide GBV services through a hotline center. 400 health workers were trained on different reproductive health (RH) topics. 55 health facilities were supported with RH commodities and equipment.
In Lebanon, Canadian advocacy efforts, bilaterally and jointly with other donors, resulted in the meaningful integration of gender considerations, and the inclusion of women and civil society organizations in the implementation of the Lebanon Reform, Recovery and Reconstruction Framework, that was developed in response to the Beirut port explosion. There was a gradual increase in sex-disaggregated data and gender analysis observed in reports of the government and UN partners. With Canada’s support to the World Bank Mashreq Gender Facility, the law criminalizing sexual harassment has been developed and adopted by Parliament.
In Jordan, Canada’s assistance helped create more economic opportunities for women and youth through skills development, and business support services, while addressing social and logistical barriers for Jordanian women. During the reporting period, more than 6,862 entrepreneurs, 99% of which were women, received business development training, financial planning, and access to markets. 158 jobs (64% held by women) were created and occupied by women, in health, childcare, solid-waste management and renewable energy sectors. Canada increased support to the Ministry of Education to improve strategic planning, monitoring and reporting on GE results, by providing financial resources and technical assistance to the Ministry’s Gender Division.
Canada continues to support the Government of Jordan to implement its National Action Plan for UNSCR 1325 on Women Peace and Security (JONAP), advancing its priorities to prevent violent extremism (PVE), and reduce gender-based violence (GBV), while empowering women and girls. Through this support, 1,745 Jordanian and refugee women received training in community level mediation, dialogue and peacebuilding efforts, including sensitization on WPS, PVE and GBV. In addition, 12,875 women survivors of violence have increased access to GBV services including psychosocial assistance, and legal advice. Among them 1.5% (171 women survivors) benefited from quality shelter services in Amman.
With Canada’s support, through contributions to multi-donor funds, a number of Jordanian national institutions were able to develop and adopt the following gender mainstreaming policies, strategies and measures as follows:
- The 2020-2025 National Strategy for Women in Jordan (NSW) endorsed by the Government, with its subsequent addendum on the needs of women and girls in the COVID-19 pandemic context.
- An institutional capacity development framework for gender mainstreaming supporting the Ministry of Social Development to operationalize the Gender Mainstreaming Policy, a key policy document adopted by Jordan in 2020.
- A bylaw for the implementation of Article 72 of the Labour Code on flexible working arrangements. This article was adopted to reduce barriers to women’s access to the job market.
- The Gender Mainstreaming Strategies (GMS) for the Public Security Directorate (PSD) and the Jordanian Armed Forces (JAF), under Jordan’s National Action Plan for UNSCR 1325 on Women Peace and Security. In addition, PSD and JAF created structures to oversee and report on the implementation of the GMS.
- A national tool for the development of a gender-sensitive curriculum framework was adopted by the Ministry of Education and the National Center for Curriculum Development.
- A new mandatory training for all teachers focused on introduction and awareness of gender equality was developed and adopted by the Ministry of Education of Jordan. The Ministry is planning to train 5,000 teachers before the next school year.
Challenges:
In Iraq, institutions have suffered from the attrition effects of conflict, challenging their ability to formulate policies, design programs and deliver services, including in the areas of gender and reproductive health.
In Lebanon, the multilayered crisis facing the country over the past year delayed most programming and challenged GAC and partners in their GE advocacy efforts as the government was in crisis mode and did not consider gender to be a top priority. Nevertheless, Canada continued to push for the integration of gender and women’s voices in programming and the overall crisis response.
In Jordan, the main challenge faced by all implementing partners was dealing with the consequences of the COVID-19 pandemic. The lock downs, school closures, and limitation in movements hindered the continuation of a number of activities. This caused delays in the implementation of annual work plans for all projects, leading to most projects requesting no-cost time extensions. However, most of the partners were able to adapt to the new situation, and could use the projects’ resources, to some extent, for direct COVID-19 pandemic response. The transition to online learning/trainings/meetings and the use of technology were the main adaptation strategies, which in some cases facilitated access to services and training especially to women. This said, the technological transition became an extra hurdle for some women due to lack of tech-literacy, lack of privacy at home, lack of sufficient mobile devices in households, the prioritization of boys’ education, and the increased unpaid care burden on women.
Priorities: Undertake a gender stocktaking of programming and diplomatic engagement under whole of government Strategy
12.2 Target:
- Facilitate a common understanding of the GE context in the 4 Middle East Strategy countries, and provide a baseline inventory of GAC initiatives integrating GE.
- Changes to the baseline will be tracked.
- Identify options to improve the quality and effectiveness of GE efforts in a potential second phase of the Middle East Strategy after FY 2018/19, if approved by Cabinet.
Target achieved to date as of March 31, 2021: On track – 12.2.1, 12.2.2/Internal capacity and efficiency
- Target 12.2.1: Completed in 2018.
- Target 12.2.1: GE results are tracked and reported as part of the regular performance management and reporting cycle.
- Target 12.2.3: Completed in 2018 for the second phase of the Strategy with continuous improvements in progress with a GE Implementation Guide in development.
Baseline:
- Gender Stocktaking commenced in late June 2017.
Activity:
- Verify gender coding of programming with Global Affairs Canada divisions implementing programs under the Strategy and note any corrections that were made
- Provide options for future programming, particularly post FY 2018/19, in each country of the Strategy, regarding improved quality and effectiveness of programming to advance the GE agenda and regarding focus areas for selection and design of future projects
Indicator:
- Completion of the gender stocktaking exercise
- Options provided in the Gender Stocktaking for improving quality and effectiveness of GE initiatives.
Completed Activities:
- The Gender Equality Implementation Guide (GEIG) specific to the Middle East Strategy was completed in 2021, with final consultations held in late 2020. The Guide is an optional planning tool that officers can use to support their annual work planning activities to advance gender equality and women and girls’ empowerment under Canada’s Middle East Strategy.
- As part of a wider evaluation conducted by the International Assistance Evaluation Division of Global Affairs Canada on Gender Equality and the Empowerment of Women and Girls in the Middle East and the Maghreb, the international assistance programming for the four countries under Canada's Middle East Strategy was evaluated in a report released in March 2021. A Management Response and Action Plan was prepared that will take into consideration the results and findings in ongoing development assistance programming.
- Through its GE Network, the Jordan Program continued providing information sessions and technical advice to implementing partners on the good practices of gender equality integration, monitoring and reporting.
- Staff attended three information sessions organized by the GE specialist team in HQ, on GBA Plus, FIAP priorities in practice, and Gender Equality Implementation Guide.
- The program is part of ESA Core GE Group which coordinates Middle East Strategy countries’ gender efforts, discusses GE issues in the ME, and shares corporate and program updates pertaining to advancing GE results.
Results and Progress:
The Gender Equality Implementation Guide (GEIG) for the four countries under Canada’s Middle East Strategy (Iraq, Jordan, Lebanon, and Syria) has been completed. In late 2020, final consultations were completed on the GEIG, and the Guide will be launched for internal use in 2021, with GEIG launch sessions planned to be held for next reporting cycle. Consistent with the Feminist Foreign Policy, the Feminist International Assistance Policy (FIAP), and the National Action Plan on Women, Peace, and Security (WPS), the GEIG will provide evergreen planning tools and best practice examples to program officers, including checklists and work plans to advance gender equality and women and girls' empowerment under the four pillars of the Strategy.
In March 2021, the International Assistance Evaluation Division of Global Affairs Canada released an evaluation report on Gender Equality and the Empowerment of Women and Girls in the Middle East and the Maghreb. The findings and recommendations from this report will be integrated into programming and the performance management cycle to continue to improve the quality and effectiveness of ongoing efforts to advance gender equality.
During FY 2020/21, the Jordan Development Program continued to provide opportunities to its staff to improve their knowledge and skills of GE integration in programming, as well as monitoring and reporting on results that is in alignment with GAC’s priorities and results frameworks. The program also contributed to the Department’s efforts in advancing the GE agenda by providing input and feedback on HQ-led consultations and evaluation exercises related to GE and women’s empowerment.
Challenges:
The Jordan Development Program participated in an GAC Middle East Relations division-led Gender Equality Self-Assessment exercise, which revealed gaps and discrepancies among staff in knowledge, experience and skills especially regarding assessing key GE elements in thematic priorities; supporting better GE integration in projects’ Logic Models and Performance Measurement Frameworks; reporting requirements for GE; and understanding the GE coding system. The Program is keen to complete the Knowledge Building Framework developed in collaboration with GAC’s Gender Equality Division.
Support local women’s rights organizations and movements working to advance WPS and GE in the Middle East
12.3 Target: Canada establishes a mechanism through which to provide direct support to women’s rights organization in the four countries of the Middle East Strategy.
Assuming at least another 4 years to undertake implementation:
- Canada enhances advocacy by women’s rights organizations to advance WPS and GE in Iraq, Syria, Lebanon and Jordan
- Canada improves the management, programming and sustainability of local women’s rights organizations in the four countries of the Middle East Strategy.
- Canada increases the effectiveness of sub-national, national and regional women’s rights platforms, networks, and alliances to affect policy, legal and social change
Target achieved to date as of March 31, 2021: Mostly on track – 12.3.1, 12.3.2, 12.3.3/ Objective 1
- Progress was made on establishing the Middle East Women's Voice and Leadership initiative, but implementation has not started yet.
- The Heartland Alliance International in Iraq has achieved some results.
- Continuing to support the implementation of Jordan's National Action Plan and to advocate for the WPS Agenda with the Government of Jordan.
- Canada continues to advocate for the WPS Agenda in Lebanon, Jordan, and Syria.
Baseline:
- There is limited funding and institutional strengthening for women’s rights organizations and an absence of coordinated collective action on the part of women’s rights organizations in the four countries of the Middle East Strategy.
Activity:
- Provide capacity building to women’s rights organizations
- Provide multi-year funding for women’s rights organizations
- Facilitate networking and alliance building among women’s rights organizations and other relevant stakeholders
Indicator:
- # of Women rights organizations who received multi-year funding from Canada
- # of organizations supported by Canada to facilitate networking and alliances
- # of capacity-building initiatives for women’s rights organizations supported
- %/total of grantees reporting greater reachFootnote 8 of programs
- # of women’s rights organizations with expanded services or increased membership
- # of inclusive legislation, policies, programmes, services supported or influenced by partner organizations/networks
Completed Activities:
- In Lebanon, Canada together with UN Women supported the lobbying and advocacy efforts of the Feminist Civil Society Platform – a group of 46 feminist activists and women's rights organizations in Lebanon, that have come together calling for a gendered disaster response plan, following the Beirut Port Explosion. In October 2020, the embassy organized a roundtable discussion inviting representatives from the Feminist Platform to present their charter of demands to the larger donor group. The meeting provided an opportunity for the Feminist Platform to present themselves to donors, requesting their support. The Platform called for better integration of gender in the response and for women and civil society's voices to be taken into account by all actors. They further called for increased women’s political representation, leadership and inclusion.
- In Jordan, the Jordan Development Program is taking the lead in implementing the Middle East Women's Voice and Leadership (WVL ME) initiative. During the reporting period, the Program was able to identify Oxfam Quebec as the implementing partner, after a thorough analysis of potential international and national development organizations. WVL ME is in the approval process, and is planned to start implementation in 2022. WVL will be delivering grant support to Women's Rights Organizations, as well as policy development and capacity support to women's movements in Lebanon, Iraq and Jordan.
- The Jordan Program continues to support implementation of Jordan’s National Action Plan on Women Peace and Security and continues to advise the Government of Jordan on effective ways to advance women’s economic empowerment through ongoing consultations and the steering committee of the Mashreq Gender Facility.
Results and Progress:
In Iraq, Canada supported the Iraqi Women’s Leadership Initiative, which is executed by Heartland Alliance International (HAI), by building the capacity of four women’s rights organizations which include: The People’s Development Organization (PDO) based in Sulaymaniyah; the Skilled Iraqi Women Foundation (SIWF) based in Muthanna; Al Manahil Association for Women Development (Al Manahil) in Basra; and the Women Leadership Institute (WLI) in Baghdad. The activities consisted of building the organizational, technical and advocacy capacity of these organizations to prioritize and address the implementation of existing laws and policies advocating for women’s rights. Also, Canada supported these women’s rights organizations to develop collaborative actions plans and an advocacy strategy to support the implementation of Iraq’s second National Action Plan for UNSCR 1325.
Moreover, this initiative successfully provided services to nearly 3,946 women, including survivors of GBV, through five resource centers in different cities. These centers supported social and economic protection for women by providing legal and mediation services, psychosocial support services, and skills-building opportunities to increase their livelihoods. For example, in the third year of the project, 2,523 women received mental health and psychosocial support services in response to incidences of GBV through outreach teams and resource centers. The centers also provided livelihood programs through vocational training and financial support to 120 women.
In Lebanon, with Canada’s and UN Women’s support, the Feminist Civil Society Platform – a group of 46 feminist activists and women's rights organizations in Lebanon that have come together calling for a gendered disaster response plan following the Beirut Port Explosion – was able to present their charter of demands to the diplomatic community and mobilize their support.
In Jordan, Canada continues to support the Government of Jordan implement its National Action Plan for UNSCR 1325 on WPS (JONAP), raising awareness about gender-based violence (GBV), WPS, working with women and girls, and men and boys. Through this support, four local women’s organizations received funding to develop and implement awareness campaigns that address gender-based violence and provide services to GBV survivors. Through the work of these organizations:
- 1,099 youth from eight universities received information on GBV prevention and legal framework, as well as the role of youth and civil society in Jordan.
- 176 vulnerable Jordanian and refugee women received awareness raising about gender stereotypes, inheritance, child custody and marriage rights;
- 400 youth, 311 teachers and 11 parents in public schools and target communities of Madaba and Balqa Governorates (north of Amman) have increased knowledge and awareness of gender roles and norms, beliefs, tolerance, human rights and gender equality, respectful relations and tolerance.
- 12,875 women survivors of violence gained increased access to GBV services including psychosocial assistance, legal advice and shelter.
Challenges:
In Iraq, due to the COVID-19 pandemic, most of the government facilities were closed, GAC’s partners (HAI and UNFPA) used alternate means (virtual meeting and cell phone calls) for coordination and communication with the stakeholders of the project including, beneficiaries and governmental officials.
In Jordan, approval for the WVL ME initiative was planned for the end of the reporting period, but due to the slow due diligence and approval process, the project could not be launched. This is mainly due to the complexity of this regional WVL which includes three countries with very different political and security contexts, and varying levels of development of their women’s rights movements. Because of these complexities, it was challenging and time consuming to find the right partner with the necessary field presence and expertise able to implement WVL ME in Iraq, Jordan and Lebanon.
Priorities: Mainstream WPS and gender into peace and security efforts in Iraq
12.4 Target: Canada, through PSOPs, demonstrates support for women’s increased and meaningful participation in improving peace and security in Iraq by ensuring that gender perspectives are integrated in 100% of projects.
Target achieved to date as of March 31, 2021: Target Achieved or Surpassed Objective 3
- 13 out of 13 (100%) of PSOPs projects in Iraq integrated GE considerations (GE01 and GE02 levels).
Baseline:
- In FY 2016/17, four out of seven Iraq-PSOP projects (57%) integrated gender perspectives. Footnote 9 Five out of seven projects supported women in improving peace and stability in Iraq.
Activity:
- Prioritize project proposals that demonstrate comprehensive WPS and GBA PLUS, and consultation with women/women’s organizations/WPS activities, while also addressing stabilization needs in Iraq
- Ensure that WPS and gender perspectives are reflected in logic models and performance measurement frameworks for new PSOPs projects
Indicator:
- # and % of PSOPs projects in Iraq that integrate GE considerations (GE01 and GE02 levels)
- # and % of PSOPs projects in Iraq that explicitly target GE (GE03 level)
Completed Activities:
- Prioritize project proposals that demonstrate comprehensive WPS and GBA Plus, and consultation with women/women's organizations/WPS activities, while also addressing stabilization needs in Iraq.
- Ensure that WPS and gender perspectives are reflected in logic models and performance measurement frameworks for new PSOPs projects.
Results and Progress:
100% of operational projects in Iraq during FY 2020/21 integrated gender perspectives, demonstrating Canadian support for women’s increased and meaningful participation in improving peace and security in Iraq. The projects below exemplify project activities that demonstrate support for women’s increased and meaningful participation in improving peace and security in Iraq.
Challenges:
PSOPs continues to support integration of women within the wider Iraqi security sector, including as direct participants in trainings. However, donor desires for quick progress must be tempered given the realities of gender disaggregation of Iraqi security service providers and generally conservative social norms. The inclusion of women in training is often itself a success toward gender equality, and each session in which women meaningfully participate supports the normalization of women within the security space. Care must be taken to ensure that women are not seen as “token additions” to satisfy dislocated international demands, which would further set back gender equality progress. It is better to identify fewer quality participants who can properly demonstrate the value added of gender equality to operational effectiveness than to force the inclusion of unprepared participants.
Background and activities of PSOPs in Syria:
Over the past 50 years, Syrian women have participated only symbolically (at best) in political life, as they have had few opportunities to play an active role. Today, more than ever, they have the opportunity to influence the transition to peace and to play a leadership role in the UN-led peace negotiations in Syria. Currently, the ongoing conflict is having a disproportionate impact on women and girls. PSOPs activities in Syria take into account the particular needs of girls, women, boys and men. It also provides opportunities for them to participate in decision-making in all activities aimed at promoting peace and security, in addition to helping women exercise decision-making power and leadership in peacebuilding. In addition, PSOPs activities play an active role in supporting women's active participation in the UN-led peace process, and in efforts to create links between women at the local level and those involved in the UN peace process.
Priorities: Mainstream WPS and gender into peace and security efforts in Syria
12.5 Target: Canada, through PSOPs, demonstrates support for women’s increased and meaningful participation in improving peace and security in Syria by ensuring that gender perspectives are integrated in 90% of projects.
Target achieved to date as of March 31, 2021: Requires attention/Objective 3
- 2 out of 5 (40%) of PSOPs projects are currently GE00.
- 2 out of 5 (40%) of PSOPs projects in Syria integrate GE considerations (GE01 and GE02 levels).
- 1 out of 5 (20%) of PSOPs projects in Syria that explicitly target GE (GE03 level).
Baseline:
- Out of the 12 Syria- PSOPs projects in the FY 2016/17, 6 (50%) of the projects in Syria integrate WPS principles and/or gender perspectives.Footnote 10
Activity:
- Encourage the inclusion of gender-based results in project design and promote gender budgeting
- Ensure that gender perspectives are reflected in new PSOPs projects
Indicator:
- # and % of PSOPs projects in Syria that integrate GE considerations (GE01 and GE02 levels)
- # and % of PSOPs projects in Syria that explicitly target GE (GE03 level)
Completed Activities:
- Ensure that WPS and gender perspectives are reflected in logic models and performance measurement frameworks for new PSOPs projects.
Results and Progress:
The project ‘Support to the Syrian Women’s Political Movement’ seeks to increase Syrian women's effective political engagement through support to the Syrian Women’s Political Movement (SWPM), an advocacy organization established by politically active Syrian women. Gender Equality is at the center of this initiative as it specifically addresses power structures, root causes of violence and gender conflict in Syria. SWPM aims to establish a democratic and pluralistic state based on the principles of equal citizenship for all citizens regardless of their gender, race, religion, sect, geographic region or identity and works towards founding a State protected by a gender-sensitive constitution that forms the basis for the elimination of all forms of discrimination against women at the political, legal, economic, social and cultural levels, and complies with all relevant international human rights treaties and conventions.
Through their interaction with regional and international media, participation in informal and formal meetings, organizing and coordinating both internally and with other feminist movements, SWPM continues to bring Syrian women’s experiences and concerns to the political process, shedding a light on issues of concern to women and girls and aiming to establish an alternative discourse to the ongoing narratives related to the Syrian political process.
By following a feminist and gender sensitive approach, the SWPM addressed the specific needs of women and girls in formal and informal meetings with UN agencies and states involved in the discussions related to Syria on the International domain, and at meetings with European Union departments in Brussels, regarding advancing the role of women in peace processes, and participation in the Syria transition and reconstruction talks. In addition, the SWPM has shed light – during its participation at these platforms, talks and meetings – on the continuous and systematic demographic alteration policies pursued by the Syrian regime, the violation of the rights of the Internally Displaced Persons (IDPs) and refugees to their properties and jeopardizing their rights to a safe return to their homes; not to mention the continued coercion of young men to engage in the military conflict by both the regime and other de-facto forces in Syria.
Challenges:
Implementing projects in Syria remain challenging due to the lack of permissive operational space. The Syrian regime and extremist organizations continued to be present in important areas of Syria, limiting international donor’s capacity to support women and women-led organizations.
13. Middle East Diplomatic Engagement
Iraq
Context: The Government of Iraq’s implementation of its’ NAP on UNSCR 1325 (2014-2018) has been limited. Currently, Iraq is in the process of developing the new 5-year Action Plan, but it is unclear whether the newly-formed government will show greater commitment to its implementation than the last one. Canada has recently expanded its diplomatic presence in Iraq, in both Baghdad and Erbil, and has increased somewhat it’s capacity to engage with the Government of Iraq and the Kurdistan Regional Government on WPS issues. However, the security environment remains restrictive, posing challenges for Canadian diplomats to travel outside the main cities of Baghdad and Erbil to engage with local authorities and organizations.
Priorities: Advance WPS in Canadian diplomatic engagements in Iraq
13.1 Target: Canada promotes its WPS position and priorities to Iraqi government officials and stakeholders to increase awareness of WPS.
Target achieved to date as of March 31, 2021: On track/Objective 1
- Both the Baghdad Canadian Embassy (BGHDD)and Erbil Mission (ERBIL) continued to undertake outreach, advocacy and engagement efforts where WPS principles were advanced with stakeholders.
- BGHDD participated in ad hoc and regular meetings of formal and informal groupings (including Baghdad-based International Gender Group) to coordinate international advocacy in support of key gender issues in Iraq such as: the second Iraq National Action Plan on Women, Peace and Security; anti-domestic violence legislation; civil documentation for IDPs; women’s political participation; and economic empowerment.
- Awareness has been raised among government officials but much remains to be done to translate awareness into political will and tangible action in a context where political attention is fixed on security, the economic crisis, protests, and upcoming elections.
Baseline:
- Canada raises topics with senior government interlocutors related to: protection of women and girls, special consideration for survivors of Daesh atrocities, women and policing/women’s inclusion in the security sector, women as part of reconciliation processes, female genital mutilation, and other WPS-related issues.
Activity:
- Raise WPS priorities with Iraqi and Kurdish officials, and report on significant responses by government officials, including reporting on Iraq’s implementation of its NAP on UNSCR 1325
- Engage Iraqi stakeholders and donors regarding gender integration in policy and partnerships.
Indicator:
- # of outreach/advocacy/engagement initiatives where WPS principles were raised/ advanced with stakeholders
Timeline: Two years (to correspond with length of the Middle East Strategy, barring renewal)
Completed Activities:
- Due to the COVID-19 pandemic and lockdowns, there were fewer meetings this year.
- Approximately five bilateral meetings held by the Ambassador and the Head of Office in Erbil with senior Iraqi federal and Kurdistan regional officials, in which Canada reinforced prioritization of WPS. Head of Office in Erbil met with KRG officials to discuss issues related to women’s empowerment, concerns around the rise in GBV (including honor killings) during the pandemic, the differential impact of the COVID-19 pandemic on women and men, girls and boys, and on the establishment of the Gender Unit at the Ministry of Peshmerga Affairs.
- Approximately 30 meetings held with Iraqi civil society (including 1325 Alliance, Baghdad Women’s Association), international NGOs and UN agencies focusing specifically on elements of WPS (including IDPs and humanitarian access, gender and demining, policing, radicalization, counter-terrorism and reconciliation), as well as the Gender Advisor of NATO Mission Iraq. This includes four ERBIL meetings with civil society actors to discuss WPS issues, with a focus on the Yezidi community. Activities included ad hoc and regular meetings of formal and informal groupings (virtual and in-person), such as the Baghdad-based International Gender Group to coordinate international advocacy in support of key gender issues in Iraq, for example: the second Iraq National Action Plan on Women, Peace and Security; anti-domestic violence legislation; civil documentation for IDPs; women’s political participation and economic empowerment. Activities also included participation in the sub-group on advocacy on Anti-Domestic Violence Legislation.
- ERBIL Head of Office also participated in the Women’s Support Network in the Kurdistan Region, a network of civil society, government, and diplomatic contacts to advance women’s empowerment, which was re-launched in November 2019 by ERBIL Head of Office and the President’s Advisor on Women’s Affairs.
- The Ambassador and Embassy staff attended and supported WPS events in Baghdad, including a UK civil society event in October and a December ceremony for French-German 2020 Prize on Human Rights & Rule of Law for a Yazidi doctor and activist.
- A March visit to Nineveh, an area liberated from Daesh occupation, underscored the continued relevance of civilian-led stabilization priorities identified through the Global Coalition against Daesh, which include the clearance of explosive hazards and restoration of public infrastructure in liberated areas.
- The Ambassador and an Embassy delegation visited clearance sites in West Mosul, Tel Kaif, and Hamdaniya district and met with male and female clearance teams. The Ambassador inaugurated a women’s dormitory at a technical university formerly occupied by Daesh and since rehabilitated with Canadian support. The Ambassador highlighted Canadian engagement and contributions on traditional media (press conference with Governor, 30-minute sit-down interview (in Arabic) with independent media platform) as well as social media over the course of the two-day visit.
- Both BGHDD and the Office in ERBIL systematically used Twitter, with a spike in WPS or gender-related posts around the 16 Days of Combatting Gender-Based Violence Campaign (during a second wave of COVID) and International Women’s Day.
- Advocacy materials in Arabic and Kurdish for the 16 Days Campaign were posted online each day of the campaign. The Ambassador posted a 30-second video message as well to his large number of followers on Twitter (81.9K). ERBIL translated additional advocacy materials into Kurdish and posted the short videos each day of the campaign, in addition to engaging with the online content of other actors in the 16 Days Campaign, including the host government, and NGOs (one of which was a CFLI partner).
- “Canada in Iraq” social media (Twitter, Facebook) have also amplified online advocacy effort and public affairs by NATO Mission Iraq and the HQ-led advocacy campaign #PeaceByHer.
- In Baghdad, the Ambassador co-hosted (with Oxfam and Sweden) a virtual roundtable for International Women’s Day, bringing together 20 Iraqi officials and activists and members of the international community to discuss challenges and recommendations for women’s economic empowerment, and raise awareness about the Government of Iraq’s National Policy for the Empowerment of Iraqi Women.
- The Ambassador joined (in person) a Women’s Day event at the Iraqi Parliament where the President ratified a new law on Yezidi Women Survivors that officially recognizes acts of genocide against Yezidi and other communities and commits to a comprehensive program of reparations, including individual and collective measures and material support for survivors.
- The Ambassador participated in an interactive virtual discussion jointly hosted by the United Nations Assistance Mission for Iraq (UNAMI) and the Free Iraq Foundation, to explore the findings and recommendations of the research undertaken in 2020 on the needs and challenges facing Iraqi women entering politics. Participation included senior Iraqi leadership, policymakers, MPs, members of the Independent High Electoral Commission (IHEC), civil society, and the international community.
- ERBIL Head of Office hosted two in-person outreach/networking events, one with traditional partners in government and civil society working on improving the status of women and combatting GBV, and another with future women leaders working in non-traditional sectors.
- Three Canada Fund for Local Initiatives (CFLI) projects supported local Iraqi civil society efforts on WPS-related priorities. One supported a new Yezidi women’s organization in Sinjar on women’s empowerment; one supported a KRI NGO working with survivors of gender-based violence, including Yezidis, in camps and in Duhok City; and a third provided funding to a women’s empowerment organization working in federal Iraq and the Kurdistan Region to formally launch a 1325 Alliance to monitor implementation of Iraq’s second WPS National Action Plan. The Canada Fund projects succeeded in expanding and reinforcing Canada’s connections with civil society and activists.
- The Ambassador and the Head of Office Erbil made statements on a number of topics, including gender-based violence. The Embassy and the Ambassador monitored and engaged in advocacy in support of women activists, some of whom were under threat and facing lawsuits. The Embassy has also nominated an Iraqi activist and peacebuilder for Canada’s new Women, Peace and Security Civil Society Leadership Award.
Results and Progress:
On December 24, 2021, the Government of Iraq, with the Prime Minister, the Council of Ministers (Cabinet), the Department of Women’s Empowerment in the Secretariat supporting the Council of Ministers (PCO equivalent), and UN Women endorsed and launched the second Iraq National Action Plan on Women, Peace and Security in accordance with Security Council Resolution 1325 on Women, Peace and Security and presented an outline for implementation.
On International Women’s Day 2021, at an event at parliament attended by the Ambassador, the President also ratified a new law on Yazidi Women Survivors that officially recognizes acts of genocide by Daesh against Yazidi and other communities. In doing so, Iraq became the first Arab state to focus institutional attention on female survivors of conflict-related sexual violence. Through the new law, the government has committed to a comprehensive program of reparations, including individual and collective measures and material support for survivors. Canada has also recognized the Daesh crimes against Yazidis as a genocide and August 3 as a day of commemoration. Canada has also provided humanitarian support for vulnerable populations, including Yazidis, supported stabilization projects that benefit Yazidi communities, used the Canada Fund for Local Initiatives (CFLI) to support a new Yazidi women’s organization in Sinjar, and resettled to Canada 1400 Yazidi survivors of Daesh violence. It will be important for civil society and the international community to continue to monitor government funding for and implementation of both the law on Yazidi Women Survivors and the second National Action Plan on WPS/1325.
Canada has led by example in Iraq on WPS/1325. Canadian Lieutenant-General Jennie Carignan was in command of the NATO Mission in Iraq (NMI) from November 2019 to November 2020. Through her outstanding leadership, skills, and expertise, she effectively modelled the value of deploying women in senior defense and security roles. Canada has also deployed male and female civilian and military Gender Advisors to OIR (the Coalition) and NMI. A senior female RCMP officer was one of the Canadians who served as Gender Advisor for the Global Coalition in Iraq, and led initiatives which included support for the Peshmerga Gender Reform Team in the Kurdistan Region.
In 2020, Canada’s Chief of Defense Staff also invited Iraq’s Chief of Defense Staff to join the Women, Peace and Security Chiefs of Defense Network. In January 2021, NMI planning started with the federal Ministry of Defense and the Canadian Dallaire Centre of Excellence for Peace and Security on a Train the Trainer Course for Mainstreaming Gender Perspective in Defense to be delivered in June 2021 to senior faculty members of Iraqi’s defense learning institutions. The course was designed and run by Canadians in concert with NMI, and is expected to be integrated into mandatory MOD training curricula for the first time. The Embassy’s Canada Fund for Local Initiatives is also supporting an Iraqi NGO working in federal Iraq and the Kurdistan Region to launch a 1325 Alliance to monitor implementation of Iraq’s second WPS National Action Plan. The Director of the NGO Women Empowerment Organization also participated in the June 2021 NMI Train the Trainer pilot.
Challenges:
It has been a challenge to maintain and build networks during the COVID-19 pandemic, but not impossible. With competing priorities shaped by the evolving situation on the ground, it has been necessary to focus on the most immediate challenges. For example, this year saw a governmental crackdown in the Kurdistan Region of Iraq on freedom of the press and of expression, with over 100 detained (nearly all men). ERBIL led a group of diplomatic missions in communicating international concern to the government and calling for them to uphold their previously-stated commitments to human rights.
Nonetheless, ERBIL routinely raised WPS issues in meetings with KRI contacts, particularly the impacts of the COVID-19 pandemic on women and girls in the short, medium, and long-term. With a near-total focus of governmental institutions on dealing with the economic shocks of both the pandemic and collapse in oil prices (upon which the economy has near-total dependency), there was little willingness among governmental bodies to discuss WPS, seeing these issues as secondary. That said, there was widespread understanding that women and girls are differentially impacted, and that all kinds of GBV have increased against women and girls since the pandemic began in Iraq in February 2020. Civil society contacts have sounded the alarm repeatedly regarding increasing GBV and a loss of women in the formal work sector and they fear that ground lost on WPS issues during the reporting period will not be regained easily.
Consistent with the priority Canada attaches to providing gender-responsive humanitarian assistance to the most vulnerable conflict-affected populations, the Embassy and the Ambassador engaged regularly with diplomatic missions, UN organizations (including UNAMI, OCHA, IOM, UNDP), and representatives of Government of Iraq on issues such as access for NGOs (delivering stabilization and humanitarian assistance in liberated areas, including support to IDP populations in Iraq - most of whom are women and children). This engagement has been part of a process to work constructively with the Government of Iraq to engage on its preoccupations and requirements with regard to NGO access and the provision of services to vulnerable camp populations, as well as on other sensitive issues such as camp closures and the return of Iraqi refugees from Northeast Syria.
Provide a platform for advancing WPS in stabilization efforts through the Global Coalition against Daesh’ Working Group on Stabilization
13.2 Target: Canada maintains efforts to advance WPS in the Global Coalition against Daesh’ Working Group on Stabilization.
Target achieved to date as of March 31, 2021: Mostly on track/Objective 5
- No Gender Focal Point interventions were performed or events held during FY 2020/21.
Baseline:
- Canada’s Chargé d’Affaires in Baghdad currently co-leads an informal diplomatic group with women Iraqi parliamentarians and PSOPs represents Canada as the Gender Focal Point of the Global Coalition against Daesh’ Working Group on Stabilization.
Activity:
- Engage with the Government of Iraq and Coalition donors regarding gender integration into stabilization efforts, and engage women’s organizations, women members of parliament, civil society, security sector actors, and other partners as appropriate on WPS considerations (Iraq’s NAP on UNSCR 1325) within Iraqi-led priorities (e.g. service delivery, security, rule of law, reconciliation, etc.)
Indicator:
- The Stabilization Working Group continues to have a Gender Focal Point # of interventions and events on WPS that Canada hosted as the Gender Focal Point for the Global Coalition against Daesh’ Working Group on Stabilization
Completed Activities:
- Canada will continue to participate in WGS meetings and monitor the situation to identify opportunities for Gender Focal Point interventions or hold specific WPS/GE events. However, until the effects of the COVID-19 pandemic on international meetings are alleviated these opportunities will continue to be limited.
Results and Progress:
In FY 2020/21, there were fewer Global Coalition Against Daesh Working Group on Stabilization (WGS) meetings due to the impact of the COVID-19 pandemic and competing Coalition priorities. When WGS meetings occurred, they were held virtually and with limited agendas. Where interventions could take place, they were focused on the top priorities, which included presenting the WGS stabilization priorities for the year and obtaining commitment from Coalition members to support continued stabilization efforts in both Iraq and Syria. Other competing priorities for the WGS included addressing the changes in conditions of the Iraqi operating environment, including threats to the Coalition, but particularly the need to support the returns and reintegration of persons perceived to be affiliated with Daesh. For example, previous events hosted by Canada as the WGS Gender Focal Point included workshops held on the margins of in-person WGS meetings, which were impossible in FY 2020/21.
The Head of Mission in Baghdad continued to advocate for the Government of Iraq to fund the second Iraqi National Action Plan (INAP) on WPS.
Challenges:
The most significant challenge to maintaining efforts to advancing WPS in the Global Coalition Against Daesh Working Group on Stabilization (WGS) during FY 2020/21 was the lack of opportunity. Where WPS meetings were held, they were held virtually which had the result of severely limited stakeholder intervention. The need for highly scripted and tightly managed interventions dissuaded any discussion other than the meeting’s top priority, and the reduced number of meetings ensured the focus of those few meetings were on topics that necessitated those meetings: namely, the need to ensure continued Coalition member support to stabilization efforts in Iraq and Syria and the commitment to ensuring a lasting defeat of Daesh. It is expected that as in-person meetings become more frequent, opportunities to perform Gender Focal Point interventions will increase.
Syria
Context: Canada works closely with like-minded partners and Syrian stakeholders towards reaching a political solution to Syria's protracted conflict. Seven tragic years of conflict have added significant challenges to, and led to a deterioration of, women rights and the situation of Syrian women and girls living in and outside the country (when displaced by the conflict). Canada has continued to be highly active in supporting the meaningful participation of women in Syrian peace negotiations, and meaningful participation of women’s organizations and networks in conflict prevention. Canada will continue to prioritize women’s empowerment and increased and meaningful participation in political dialogue and decision making as well as GE, inclusiveness and protection generally.
Priorities: Advance WPS in Canadian diplomatic engagements concerning Syria
13.3 Target: Canada promotes its WPS positions and priorities with Syrian stakeholders to increase awareness of WPS
Target achieved to date as of March 31, 2021: On track/Objective 1
- Canada continued to advocate in support of the WPS agenda as it relates to Syria at all levels: from local women’s rights NGO in northern Syria to the Office of the UN Special Envoy to Syria. In this reporting period, there were more than 15 specific high-level engagements aimed at building commitments and encouraging actions to advance WPS objectives.
- However, there remained significant barriers to women's participation. Despite close to a decade of support to opposition movements and advocacy around the importance of women's involvement and ownership of political processes and peace talks, few women are in leadership positions, with women merely filling quotas and participate in separate women-specific groupings instead of front and center at negotiations. In Idlib and north Syria, women's representation was worse, with women's participation in local councils and stabilization activities largely absent.
- Although essential to securing a long-term and sustainable peace in Syria, our targets remain relatively modest considering the depth of the insecurity, cultural barriers, and the near-absence of space for a Canadian-led WPS agenda in regime-held areas. However, our efforts are on track to achieve the target by the end of FY 2021/22. Normal procedures and level of effort are sufficient to achieve the target, with increased direction for women's participation as a condition for support and Canadian participation at stabilization meetings and at local levels.
Baseline:
- Canada has raised, with Syrian stakeholders, issues related to women’s empowerment and participation in Syrian representative and governing bodies; women participation in political transition and future reconciliation processes; the protection of women and girls, with special considerations for issues related to SGBV, child, early and forced marriage and female genital mutilation; and Canada is recognized as a strong advocate for the participation of women in Syrian peace talks. However, there are persisting complex challenges in improving GE, women’s empowerment, inclusiveness, protection, and participation in the peace process.
Activity:
- Raise WPS priorities with Syrian stakeholders/opinion-shapers/decision-makers, and report on significant developments
- Engage Syrian stakeholders, donors, women’s rights organizations, female senior Syrian representatives, civil society, and other actors on WPS and gender considerations (e.g. service delivery, political transition, reconciliation, security, rule of law, etc.)
- Support increased and meaningful participation of Syrian women’s groups, including the Women’s Advisory Committee, in the peace process
- Support programming that amplifies the voices of women
Indicator:
- # of outreach/advocacy/engagement efforts where WPS principles were raised/ advanced with stakeholders
Timeline:
- Two years (to correspond with length of the Middle East Strategy, barring renewal)
Completed Activities:
- Canada does not have diplomatic relations with the Syrian regime, nor does it enter regime held areas (in additional to all other areas). Given the extreme control of the regime and the lack of civil society space, Canada has also not been unable to utilize CFLI or other means of engagement to advance WPS. However, given our broad network across non-regime held areas (northern Syria) and into Turkey, Lebanon and Jordan, plus our diplomatic reach into various diplomatic capitals (New York City, Geneva, Den Haag), Canada has situated itself towards the Syrian crisis as a strong advocate and partner on WPS.
- The CFLI program, which focuses its increasing budget exclusively of women’s empowerment and elements of WPS in Syria, is an important part of Canada’s success on promoting WPS. Combining local grassroots women’s NGOs with diplomatic engagement in the regions capitals, and beyond into the halls of the UN, has helped to put WPS on the agenda in Syria. Raising knowledge and advocating clear examples of change that can happen when women are included in addressing peace and security, will bode well for years to come. The efforts that Canada expends today play an important role in creating the conditions for the WPS agenda in the future. It is a long road ahead for obtaining gender equality in Syria, let along peace and security.
- Globally, the WPS agenda is largely focused on traditional UN-led peace operations, whereby there are established international linkages into peace and security dynamics of a country. In this context, there is an obvious target for Canada: advocate for WPS within existing frameworks. The situation in Syria is diametrically different. In Syria there is no formal and effective structure for addressing peace security. Canada is unable to support and advocate various parties to the conflict to create a space for women’s contribution to addressing peace and security, as these parties are general hostile to Canada’s values. Nor are they willing to address and make compromises for peace and security, let alone WPS. As such, the Syria-Hub has had to be creative and explore and secure alternative channels for promoting WPS. Canadian officials have continued to support the WPS agenda in all engagement with Syrian stakeholders.
- The Syria-Hub had to shift the majority of its activities to online in FY 2020/21 due to the COVID-19 pandemic. While a challenge in some respects, various ways of working were employed to ensure continued progress of the WPS agenda in Syria. Using online tools as the primary form of diplomatic engagement resulted in a greater reach and scope of relationships. The Hub continued to have regular and consistent interaction with individuals, partners and organizations on the WPS agenda, promoting its implementing. Canada was also recognized as a strong advocate and partner on WPS across a host of ongoing working groups, for example, when Canada raised WPS as a cross-cutting theme within issues such as transitional justice, human rights and donor/NGO relations. Canada also participated in a number of high-level events; again raising WPS as a central component of any solution to peace in Syria.
- Canada’s Executive coordinator for Syria virtually attended meetings of the Opposition Stabilization Support Unit, Syrian Opposition, UN Special Envoy for Syria, the Syrian Women Advisory Board and the Syrian Women’s Political Movement to support greater women’s participation in Syrian political processes, including negotiations with the regime. At the third annual general assembly meeting of the Syrian Women Political Movement, he provided remarks to the assembly based on the theme of “no women, no legitimacy.”
- The CFLI Syria Allocation managed by the Syria-Hub was a primary tool of advancing WPS. While GE and the empowerment of women and girls is an important theme under the CFLI, the Syria-Hub went further by mandating that all CFLI partners and projects must focus on GE and Women’s empowerment across the elected themes of media freedom and human rights. WPS was also a theme unto itself.
- The Syria-Hub remained very active in promoting WPS in Syria on social media.
Results and Progress:
Canada continues to advocate in support of the WPS agenda as it relates to Syria at all levels: from local women’s rights NGO in northern Syria to the Office of the UN Special Envoy to Syria. In this reporting period, there were more than 15 specific high-level engagements aimed at building commitments and encouraging actions to advance WPS objectives.
Canada continues to identify and support Syrian partner organizations that are advancing WPS principles, including women’s participation in the peace process, by prioritizing engagements with Syrian women civil society leaders and women's organizations. Canadian officials met with the Syrian Women’s Political Movement, the women’s representative of the White Helmets, the Syrian Women’s Peace Movement, the Syrian Women’s Peace Network, Afaq Academy on Women’s Peace and Justice programs and the Syrian American Medical Society, among others.
In FY 2020/21, 16 Syria-related CFLI projects were implemented. All 16 contributed to Canada’s WPS objectives, with mandatory women’s empowerment and gender equality criteria. The results of these projects include the following:
- 25 women trained on aid principles are qualified to be hired in senior NGO positions;
- 40 female journalists and 40 female teachers trained on their rights, and equipped with skills to realize freedom of expression and SGBV prevention;
- 21 young Syrian female journalists trained;
- 45 women and girls from the families of detained and forcibly disappeared persons become mentors in their community;
- 1,132 Syrian refugee women in Jordan and 72 women and girls in Syria trained on online safety to communicate securely and use the internet with less harassment;
- 182 direct beneficiaries were provided capacity building / awareness-raising on adolescent sexual and reproductive health in humanitarian programming through training and documentation in Jordan and Lebanon;
- 10 online awareness sessions for 150 beneficiaries were conducted on the COVID-19 pandemic protection, use of hygiene, good practices, symptoms and psychological support on how to deal with the stress resulted from staying home;
- 150 hygiene kits were distributed among 150 families;
- 232,000+ people reached through radio programming (Welat) with a focus on women, through its COVID-19 pandemic awareness-raising project in North-East Syria (the project broadcasted a radio program on social media hosted by doctors and provided information in photo reports and video graphics);
- 15 Syrian journalists trained on COVID19 on safe practices, research methodologies, fact-checking practices, public health reporting techniques, story production and interview methods;
- 30 legal cases were built, completed, and filed by a partner before the Syrian domestic court - the majority of the cases focused on women (GBV, inheritance, human rights etc).
Jordan
Context: Jordan has demonstrated support for and is implementing strategies that focus on women’s empowerment (National Strategy for Women and Government's Vision 2025). However, women still do not have the same legal status and rights as men. Discrimination, domestic violence, and child, early and forced marriage are enduring concerns, both in host communities and especially among Syrian refugees. Diplomatic advocacy continues to support Canada’s efforts to prioritize GE, women’s economic and political empowerment, inclusion, and protection.
Priorities: Advance WPS in Canadian diplomatic engagements in Jordan
13.4 Target: Canada promotes its WPS position and priorities to Jordanian government officials and Jordanian stakeholders to increase awareness of WPS.
Target achieved to date as of March 31, 2021: On track/Objective 1
- The Ambassador spoke at over 20 events on the importance of Resolution 1325, WPS priorities and women’s equality more broadly.
Baseline:
- Canada has raised, with senior Jordanian interlocutors and stakeholders, issues related to women’s empowerment and participation in Jordanian representative and governing bodies; women and policing/women’s inclusion in the security sector; the protection of women and girls, with special consideration for SGBV, child, early and forced marriage; and other WPS-related issues. However, challenges in improving GE, women’s empowerment, inclusiveness and protection persist.
Activity:
- Raise WPS priorities with Jordanian stakeholders and report on significant developments
- Engage Jordanian stakeholders and donors regarding gender integration in policy and partnerships
Indicator:
- # of outreach/advocacy/engagement efforts initiatives where WPS principles were advanced with stakeholders
Completed Activities:
- The embassy strongly encouraged both the Jordanian Armed Forces and the Public Security Directorate to apply for funding from the Canadian-funded Elsie Initiative to advance implementation of Jordan UNSC 1325 National Action to Support Women in Peace and Security (JONAP) in the context of UN Peacekeeping. At the end of the reporting period, the Jordanian Armed Forces (JAF) application had advanced to the short list for funding. With the Embassy’s advocacy, the JAF would not have applied. The potential funding supports Canada’s and Jordan’s WPS objectives.
- The Ambassador is a member of the JONAP Donors Group which met with the Government and stakeholders three times and has attended every meeting. The HOM launched one of those partner meetings with the keynote intervention.
- The Ambassador contributed, on behalf of all donors supporting the implementation of the JONAP, to a joint press release between the JAF, UN Women and the donor consortium. She emphasized the importance of increasing women’s participation and retention in the military and in peacekeeping operations.
- The Embassy is actively engaged with Jordanian authorities at senior levels to support the development of JONAP 2.
- The Ambassador participated in three Principles meetings of the Gender Partners Coordination Group, which includes Jordan’s Inter-Ministerial Committee on Women’s Empowerment, the Jordanian National Commission on Women (JNCW), the UN Women, and the bilateral donor community.
- The Ambassador advocated Canada’s position on gender equality, and women’s empowerment; as well as inclusive policy making which allows for meaning engagement with civil society, especially women’s rights organizations.
- The development program created and led a donor coordination mechanism to advance Canadian priorities, in particular Gender Equality. Canada co-chaired the Education Sector Working Group and delivered messaging to government, UN partners, and other partners on the importance of GE, gender mainstreaming and inclusion. Canada, with UN Women, established a new Gender Subgroup of the Humanitarian and Development Partners Group, the main donor coordination mechanism in Jordan.
- The Ambassador spoke to Digital Media Forum on Women in Media and Gender-Sensitive Reporting During the Pandemic in June 2020: convened 120 media professionals, CSOs, academia, international organizations and national stakeholders for a strategic dialogue on the positive role of women in media and challenges they faced during the COVID-19 pandemic outbreak. The panelists and participants were from a wide range of media outlets, such as CNN and BBC, as well as media groups and influencers covering women’s issues. 2,000 people on social media also viewed the forum live, and a press release was published in offline and online media outlets.
- The Ambassador spoke to a forum to celebrate the 65 years since the creation of the UN Commission on the Status of Women. This event brought together experts, peacebuilders, and advocates from the Arab States, Asia, and Latin America, the cross-regional dialogue focused on progress, challenges and emerging priorities in the context of the COVID-19 pandemic. More than 100 participants joined the discussion, which also addressed the profound implications of the COVID-19 pandemic on national and regional peace, security and stability. A press release was published after the meeting.
- The Embassy’s online advocacy efforts prioritized four limited-duration social media campaigns with multiple posts a day on thematic priorities: education for all, democracy promotion in the lead up to the 2020 parliamentary election, 16 days of action; and International Women’s Day. These were effective social media campaigns. For example, the education campaign of early September 2020 increased page engagement by 62.3% compared to the 15 days prior to the campaign. Likewise, the democracy campaign in mid-September generated four times the engagement compared to the same period a year earlier. To advocate for FIAP principles, the Embassy supported the launch of the Peace by Her Campaign on International Women’s Day 2021 with the Ambassador recording a video in front of a mural of a strong woman. The video generated 3110 impressions, the best for March. The Ambassador also did a TV interview celebrating the contributions of women and girls everywhere. The political team in Jordan produced targeted messages around the video and the TV interview, generating 2291 impressions. In partnership with the Swedish Embassy, a Wikigaps event generated 54 new and 61 edited articles on Arab women, which was positive given the challenges of doing the event online.
- At the Canadian Permanent Mission to the UN (PRMNY), the Ambassador delivered remarks at High-Level Side Event during the commemorations of the 20th anniversary of UNSCR 1325 at the UN HQ. The Ambassador highlighted the characteristics that makes the JONAP an effective national action plan.
Results and Progress:
Throughout the timeframe of this report, the Ambassador spoke at over 20 events on the importance of 1325 and women’s equality more broadly.
The Ambassador was involved in negotiations involving other key donor heads of mission, the Jordan National Commission for Women and the Inter-Ministerial Committee to advocate for a robust and comprehensive National Women’s Strategy. While the Strategy’s release was delayed by the COVID-19 pandemic, the final Strategy was widely seen as reasonably thorough and an indication of the Government of Jordan’s commitment to advancing women’s equality.
Through multiple programs and cross-cutting advocacy, the Embassy advocated for gender sensitive analysis, planning, and reporting in Ministries, supporting development of monitoring and evaluation tools to track progress. Largely due to Canadian efforts, there is now an impressive structure in place of positions for gender advisors in line Ministries and a Monitoring and Evaluation framework to track gender results. The Embassy continues to undertake advocacy to ensure that implementation and capacity development supports the frameworks. Canada’s role was highlighted when the Ambassador delivered remarks at the launching ceremony of the Ministry of Political and Parliamentary Strategy for 2021-2025. Our partner, Forum of Federations, helped the Ministry revise its Strategy to make it gender-sensitive.
As Jordan expanded its National Aid Fund (NAF) to cover those in need due to the pandemic’s impact on poverty, concerns were expressed by women’s rights groups that the NAF excluded women-headed households in providing relief to more traditional family structures, (i.e. provided funding to the father and never the mother regardless of circumstances). The Ambassador raised this concern in bilateral meetings with the Prime Minister and several ministers. Any residual discrimination in how the NAF was administered has been resolved.
Lebanon
Context: Lebanon continues its slow and fragile transition from the civil war, addressing its many structural challenges including lack of good governance, high levels of corruption, limited economic growth, human rights limitations, and recurrent security challenges due notably to the presence of armed groups. While Lebanon appears fairly progressive compared to many other Arab countries with respect to many rights, some fundamental rights are still not fully recognized and respected. While the Lebanese government has remained focused on political and security issues, such efforts have slowed progress in a number of other areas, such as the improvement of women’s status in society, GE, human rights and good governance. While being one of the most vulnerable communities in the country, facing all of these challenges, including the influx of Syrian refugees, women have become advocates for social cohesion within and between communities. Under its Middle East Strategy, Canada has put GE, women’s protection, empowerment, and inclusiveness at the top of programming and advocacy efforts in Lebanon.
Priorities: Advance WPS in Canadian diplomatic engagements in Lebanon
13.5 Target: Canada promotes its WPS position and priorities to Lebanese government officials and stakeholders to increase awareness of WPS.
Target achieved to date as of March 31, 2021: On track/Objective 1
- Canada was involved (as a chair, co-chair, member, and organizer) in four working groups that conduct follow-up on different aspects of the National Action Plan on WPS.
- Canada (either the Embassy or the Ambassador) raised WPS on 6 occasions.
Baseline:
- Canada has raised with senior Lebanese interlocutors and stakeholders, topics related to women’s empowerment and participation in Lebanese representative and governing bodies; women and policing/women’s inclusion in the security sector; the protection of women and girls, with special consideration for SGBV violence, child, early and forced marriage; and other WPS-related issues. However, challenges in improving GE, women’s empowerment, inclusiveness and protection persist.
Activity:
- Raise WPS priorities with Lebanese stakeholders, and report on significant developments
- Engage Lebanese stakeholders and donors regarding gender integration in policy and partnerships
Indicator:
- # of outreach/advocacy/engagement initiatives where WPS principles were raised/ advanced with stakeholders
Completed Activities:
The COVID-19 pandemic affected the overall Mission planning cycle, considerably limiting outreach and advocacy opportunities to advance Women, Peace, and Security (WPS) issues. Therefore, original plans had to be scaled back. Some meetings with local stakeholders were held late in the fiscal year, most of them virtually, while Mission’s social media was used to display Canadian contribution to stability and security.
- The Ambassador attended a general assembly of the Lebanese parliament along with two other likeminded ambassadors (Norway and Switzerland), in June 2020. Their attendance highlighted the political empowerment of women and the importance of their involvement in the decision-making process.
- The Embassy attended a meeting of Lebanon's steering committee for the implementation of the country's National Action Plan (NAP) for UNSCR 1325 on Women, Peace, and Security (WPS) in July 2020. The meeting aimed at discussing and adopting a work plan for FY 2020/21.
- In October 2020, the Embassy together with UN Women organized a roundtable discussion inviting representatives from the Feminist Civil Society Platform – a group of 46 feminist activists and women's rights organizations in Lebanon that have come together calling for a gendered disaster response plan, following the Beirut Port Explosion – to present their charter of demands to the larger donor group. The Platform called for better integration of gender in disaster response and for women and civil society's voices to be taken into account by all actors.
- he Embassy in collaboration with the Ecole Supérieure des Affaires organized a screening of the film Dream, Girl followed by a round table on the empowerment of women and gender equality, in November 2020. In her speech, the Ambassador stressed that Canada has made the promotion of diversity and inclusion, including gender equality and the empowerment of women and girls, key priorities, both nationally and abroad.
- The Embassy contributed in the Beirut International film festival that was attended by high-level Canadian speakers, in March 2021. The festival focused on how portraying women leaders’ achievements on big screen has a positive impact on women’s status in reality. The Ambassador’s speech at the panel highlighted how women can effect positive changes in society and help build more peaceful and inclusive ones.
- The Embassy hosted a donor roundtable discussion on women’s participation in decision-making, leadership and politics in Lebanon with guest speakers from UN Women and UNDP, who presented the UN Joint strategy to support women’s leadership and political participation in Lebanon, in March 2021.
Additional activities:
- Canada is an active member of the National Steering Committee for the Women’s Peace and Humanitarian Fund in Lebanon.
- As chair of the gender donor coordination group in Lebanon, Canada engaged regularly, on a bilateral basis or jointly with other donors, in advocacy efforts towards the Government of Lebanon and leaders to push for women’s rights and the gender agenda in Lebanon.
- As co-chair of the donor group in Lebanon, Canada strongly advocated for the integration of gender in the design of the Lebanon Reform, Recovery and Reconstruction Framework (3RF) and the Lebanon Financing Facility (LFF), to ensure that activities and reforms planned under the 3RF are integrating a gender perspective. Moreover, to ensure women leadership in the post Beirut explosion response plan, Canada together with other donors, lobbied strongly to ensure that civil society and women rights organizations are properly consulted and represented in the coordination and oversight bodies of the response.
- The Embassy organized and moderated coordination meetings on women's political participation with NCLW and UN Women, and other stakeholders.
Results and Progress:
The massive explosion at the Port of Beirut in on August 4, 2020, while causing more delays, further highlighted the urgency of NAP-related efforts to enhance national resilience and recovery. Any recovery efforts in Lebanon must be inclusive of women in order to be sustainable.
Lebanon’s unprecedented socio-economic crisis compounded by the COVID-19 pandemic lockdown have deepened gender inequalities and resulted in further delays on NAP progress. While women in Lebanon are at the forefront of many current initiatives aimed at making peace, gender inequality in Lebanon is uniquely intertwined with the political and social structures. Addressing gender equality and women’s rights issues in Lebanon is necessary to sustainably address the current multi-faceted crisis that the country is facing.
The participation of women in peace, security, and political processes, including in Lebanon’s parliamentary and municipal elections in 2022, is at the center of broader efforts to consolidate peace and bring stability to Lebanon.
Key challenges to implementation of Lebanon’s National Action Plan include:
- Lebanon’s multiple crises, including the massive explosion in Beirut’s port, the economic collapse and rising political instability.
- The limited coordination and consensus among stakeholders with competing priorities (political, economic, and financial crises; the COVID-19 pandemic; and port explosion aftermath);
- The absence of trust between the current caretaker Government of Lebanon and civil society in a climate of pervasive government corruption, and deteriorating human rights conditions;
- The absence of baseline assessments that fully capture the extent of WPS activities undertaken by donors.
Africa
14. South Sudan
Context: South Sudan is one of the world’s most fragile states and women and girls remain one of the most marginalized groups. Conflict continues to impact women and girls differently and disproportionately, and continues to violate their rights. Women are also consistently excluded from conflict prevention and peace activities. The South Sudanese government has a NAP on UNSCR 1325 (2015-2020), but its implementation capacity is limited. Given South Sudan’s extreme fragility, the political and security environment presents numerous challenges for programming and diplomatic engagement related to the WPS agenda.
Canada’s bilateral development assistance in South Sudan is focused on meeting the basic needs of the poorest and most vulnerable, particularly women and girls. Empowering women and girls and reducing gender inequalities is also at the core of Canada’s development approach. Canada’s programming supports the delivery of gender-sensitive basic health services, including maternal, newborn and child health, with increasing attention to SRHR. In particular, Canada is working with local partner organizations to empower women and girls to make their own decisions about their sexual and reproductive health, free from discrimination, coercion and violence, and to positively influence attitudes and social norms related to SRHR. Canada is also supporting efforts to improve food security by boosting food production, protecting livelihoods, and strengthening community resilience to hunger, including by working directly with women farmers to increase their participation in production and marketing activities. Canada regularly engages with the Government of South Sudan to advocate for the needs and rights of women and children affected by the conflict. This includes an emphasis on protecting women and girls from high levels of SGBV, including the use of rape as a weapon of war. Canada also monitors the human rights situation for women and girls and actively engages advocates for the meaningful inclusion of women leaders in the peace process.
The PSOPs programming is taking into account the different needs of girls, women, boys and men, as well as their opportunities to participate in decision-making in all peace and security efforts. PSOPs is supporting women’s decision-making and leadership in peacebuilding and the efforts aimed at addressing the underlying root-causes of conflict and violence, particularly addressing unequal power relations and discrimination against women and girls.
Priorities: Increase the support to local women’s rights organizations in South Sudan
14.1 Target: Canada increases targeted support to local women’s rights organizations and movements working to empower women and girls and advance GE. By 2021/22, 15 women’s rights organizations and movements are supported by the bilateral development program and through CFLI.
Target achieved as of March 31, 2021: Target achieved or surpassed/Objective 1
- 16 local women’s rights organizations and movements working to empower women and girls and advance GE received support through the bilateral development program and the CFLI.
Baseline:
- One women’s rights organization and/or movement received support via the bilateral development program and through the CFLI in FY 2016/17
Activity:
- Provide support to local women’s organizations and movements, including the mapping of organizational capacities, priorities, and needs
Indicator:
- # of women’s rights organizations and/or movements supported in South Sudan by the bilateral development program and through the CFLI
Completed Activities:
- Supported 16 local women’s rights organizations and movements working to empower women and girls and advance GE through the bilateral development program and the CFLI. This is 4 fewer than the previous year.
Results and Progress:
During FY 2020/21, 16 women-led organizations received multi-year funding, which helped improve the management capacity of these organizations, as well as their capacity to undertake programming and advocacy to advance gender equality. These organizations also received training and coaching on financial management, governance, the prevention of sexual abuse and exploitation, and project and grant management. With Canada’s support, most of the WLOs have been able to secure external funding, contributions and grants for project implementation that respond to the needs of women and girls in fragile and post-conflict situations.
An additional 16 women-led organizations were supported through Rapid Response Fund grants to respond to the gendered impacts of the COVID-19 pandemic. These funds have supported a wide variety of activities, including: COVID-19 related GBV awareness raising; preventative measures and access to GBV-related services; awareness raising on women’s and girls’ SRHR; and facilitation of participation by women and girls in COVID-19 pandemic related decision-making processes.
Challenges:
Since the onset of the COVID-19 pandemic in March 2020, the Canadian Mission in Juba (JUBA) has experienced several human resources challenges. Despite these challenges JUBA is on track and has surpassed Target 14.1. JUBA will have dedicated team members for PSOPs and WPS issues starting in September 2021.
Priorities: Advance WPS in Canadian diplomatic engagements in South Sudan
14.2 Target: Canada increases advocacy on the WPS agenda in diplomatic engagement with South Sudan.
Target achieved as of March 31, 2021: On track/Objective 1
- 8 outreach/advocacy/engagement efforts where WPS principles were advanced with stakeholders.
Baseline:
- No advocacy specific to the WPS agenda in diplomatic engagement with South Sudan.
Activity:
- Regularly advocate for the WPS agenda, with a focus on objectives set out in the South Sudan NAP on UNSCR 1325
Indicator:
- # of outreach/advocacy/engagement efforts with stakeholders where WPS principles were advanced
Completed Activities:
- Engaged in 8 outreach/advocacy/engagement efforts with stakeholders where WPS principles were advanced.
- Regularly advocated for the WPS agenda, with a focus on objectives set out in the South Sudan NAP on UNSCR 1325.
Results and Progress:
Canada is among the most active members of the Juba Women, Peace and Security Working Group with Norway and Sweden as co-chairs. In addition, Canada is an active member of the Women Peace and Security Technical Committee. Canada worked within this forum to mobilize partners and leverage their advocacy on women, peace and security-related issues and opportunities.
In meetings with government interlocutors and political parties, including the office of the President, Canadian officials advocated for enhanced women’s participation in the peace process and in government institutions. While the cabinet has already been formed, ongoing emphasis is placed on state and local positions, and on parliament. This diplomatic work was complemented by advocacy in semi-public forums such as the Reconstituted Joint Monitoring and Evaluation Commission, and through public activities such as interviews and social media.
In March 2021, Canada co-hosted an International Women’s Day event with the South Sudanese Minister of Defence and Veterans Affairs and the Minister of Gender, Child and Social Welfare on assessing progress on the 35% commitment on women’s representation since the establishment of the Revitalised Transitional Government of National Unity (RTGoNU). The event supported Canada’s women peacebuilders campaign by amplifying the voices of two women peacebuilders and led to several #PeacebyHer pledges.
Challenges:
Since the onset of the COVID-19 pandemic in March 2020, JUBA experienced several human resources challenges which impacted the ability to work in WPS throughout the reporting period. Despite these challenges, JUBA actively worked towards achieving the target by leading on several WPS advocacy initiatives. JUBA will have a dedicated team member for PSOPs and WPS issues starting in September 2021.
Priorities: Mainstream WPS and gender into peace and security efforts in South Sudan
14.3 Target: Canada, through PSOPs, demonstrates support for women’s increased and meaningful participation in improving peace and security in South Sudan by ensuring that WPS principles and gender perspectives are integrated into 100% of projects.
Target achieved to date as of March 31, 2021: Target Achieved or Surpassed/Objective 3
- 3 out of 4 (75%) of PSOPs projects in South Sudan integrated GE considerations (GE01 and GE02 levels).
- 1 out of 4 (25%) of PSOPs projects in South Sudan explicitly targeted GE (GE03 level).
- PSOPs continued to support the Senior Gender Advisor deployed from UN WOMEN to the Intergovernmental Authority on Development (IGAD) Envoy for South Sudan. IGAD is leading the mediation for the South Sudan peace process. The Senior Gender Advisor has been deployed to enhance IGAD’s gender expertise.
Baseline:
- In FY 2016/17, there were 2 (100%) projects that supported women to participate in improving peace and security in South Sudan. Both projects integrated WPS principles, and both projects increased the budget to integrate more WPS elements.Footnote 11
Activity:
- Encourage the inclusion of gender-based results in project design and promote gender budgeting
- Ensure that WPS and/or gender perspectives are reflected in new PSOPs projects
Indicator:
- # and % of PSOPs projects in South Sudan that integrate GE considerations (GE01 and GE02 levels)
- # and % of PSOPs projects in South Sudan that explicitly target GE (GE03 level)
Completed Activities:
Between April 01, 2020 and March 31, 2021:
- All GE02 or higher operational projects integrated GE considerations into their project design.
- A total of four (4) projects that integrate GE considerations have been operationalized.
- PSOPs continued to support one (1) GE03 project, implemented by UNWOMEN that focuses on women's high-level engagement by a Senior Gender Advisor to the Intergovernmental Authority on Development (IGAD) led mediation peace process.
- PSOPs funded a project implemented by the Reconstituted Joint Monitoring and Evaluation Commission (RJMEC), the monitoring and oversight body of the Revitalized Agreement on the Resolution of the Conflict in South Sudan (RARCSS). This project is GE02, therefore fully integrated GE consideration throughout their project design.
- In March 31, 2021, PSOPs contributed to the South Sudan Multi-Partner Reconciliation, Stabilisation, and Resilience Trust Fund (RSRTF). While it’s too early to report on the results of Canada’s contribution to the RSRTF, within the review process of this GE02 project, PSOPs influenced how the fund mainstreams GE considerations through its operations and encouraged the fund’s secretariat to explore opportunities to consult women’s groups about RSRTF activities.
- PSOPs funded one (1) GE02 project implemented by the Sentinel Project that focuses on reducing misinformation through enabling a two-way mobile communication system. Women and girls in South Sudan are often excluded from information flows and public discussions that influence communal decision-making. This project enables women to contribute information gained and shared from their unique positions both inside and outside of the household and between communities through livelihood activities in which they engage.
Challenges:
- Focus on the R-ARCSS stipulated 35% minimum women’s participation quota has led to the inclusion of more women within the peace process, however, there is a challenge to translate this increased physical “representation” to meaningful participation within the peace process and state-building initiatives.
- The women who enrolled in the training centers faced many challenges among them such as sanitary facilities, separate bathrooms for women, special places for lactating mothers and places to keep their kids (some of the women are accompanied with children). These challenges were discussed with the VP and the Security Advisor for the President to address them and provide the needed support for women. Both the VP and the Security Advisor promised to address these challenges; however, so far, no action has been taken.
Results and Progress:
Zero GE01, three GE02 and one GE03 projects were supported by PSOPs during this reporting period.
The Senior Gender Advisor to the IGAD Special Envoy for South Sudan continues to ensure that the IGAD Special Envoy for South Sudan has the gender analysis and tools needed to facilitate its work as the chief mediator of the national peace agreement. She also continues to mobilize women groups and networks across South Sudan and in the diaspora to engage with the Revitalized Agreement on the Resolution of Conflict in South Sudan (R-ARCSS). The Senior Gender Advisor ensures that all gender provisions implemented take into account gender issues and women’s empowerment. She participates in and provides technical expertise at various high-level meetings, including meetings with: the IGAD Special Envoy for South Sudan, the Chairperson of IGAD, the Sudan Prime Minister, the Minister of Foreign Affairs, the Security Advisor for the President of South Sudan, FemWise-Africa, various Vice Presidents for South Sudan and opposition leaders, on the women, peace and security strategy. Key results of this high-level advocacy have resulted in resolving women’s issues in the training centers and ensuring women’s representation in the last nomination for the National Transitional Legislative Assembly. In addition, she has also provided technical support in the design and facilitation of various workshops, including one on experience sharing for female mediators across the IGAD region; as well as between the South Sudanese women signatories to the R-ARCSS and the Sudanese women signatory to the Sudan Peace Agreement. The latter provided an opportunity for women leaders from both countries to exchange information about their roles in the transitional processes of their respective countries.
Challenges:
Focus on the R-ARCSS stipulated 35% minimum women’s participation quota has led to the inclusion of more women within the peace process, however, there is a challenge to translate this increased physical “representation” to meaningful participation within the peace process and state-building initiatives.
The women who enrolled in the training centers faced many challenges among them such as sanitary facilities, separate bathrooms for women, special places for lactating mothers and places to keep their kids (some of the women are accompanied with children). These challenges were discussed with the VP and the Security Advisor for the President to address them and provide the needed support for women. Both the VP and the Security Advisor promised to address these challenges; however, so far, no action has been taken.
15. Burundi
Context: In April 2015, President Nkurunziza of Burundi announced that he would be running for a third term in the election planned later that year. Burundian authorities engaged in systematic and brutal repression of any form of dissent to President Nkurunziza’s decision, and this crackdown intensified following the May 2015 coup attempt. Large segments of Burundi’s population, the political opposition, and many members of the international community deemed his decision unconstitutional and in contravention of the 2000 Arusha Agreement. According to reports from the UN, local and international NGOs such as Human Rights Watch and Amnesty International, the violence orchestrated by President Nkurunziza’s regime has targeted many groups and individuals perceived as opponents of the regime. Women and girls have been the target of SGBV, notably rape, principally from the Imbonerakure youth militia.
As Canada does not have a physical diplomatic presence in Burundi, visits to the country and information-gathering from bilateral and multilateral partners on the political and humanitarian situation are a significant part of how Canada scopes out opportunities for diplomatic or programmatic action and advocacy on Burundi. Therefore, in order to ensure that the needs, interests and challenges of Burundian women and girls are taken into consideration in the development of Canada’s plans and actions in Burundi, Canadian officials reporting on Burundi will ensure that their conflict analysis integrates gender perspectives and gender-based concerns, specifically those related to women and girls.
Priorities: Increase Canada’s knowledge of issues pertaining to women and girls in the context of the conflict in Burundi
15.1 Target: Canada increases its understanding of the differential impact of the conflict on Burundian women, men, boys and girls. At least half (50% per FY) of reports and analytical products, produced by the mission in Kigali and/or Global Affairs Canada headquarters, relating to the situation in Burundi, will integrate and/or address gender-based perspectives.
Target achieved to date as of March 31, 2021: Mostly on track/Objective 1
Baseline:
- Owing to the nature of the conflict, Global Affairs Canada reporting on the situation in Burundi already captures gender-based concerns. However, this approach to reporting is not fully integrated into routine practice. Also, there is currently no systematic tracking of reporting and analysis that comprise gender-based and women’s issues.
Activity:
- Conduct gender-based reporting and analysis
- Engage with government officials working on gender issues, CSO, in particular women’s rights organizations, and/or relevant international organizations in most GAC missions to Burundi
- Advocate for GE and women and girls safe and meaningful empowerment
Indicator:
- % of reporting and analytical products that are prepared according to gender-based considerations, based on the total number of reporting and analysis prepared
- Number of meetings with relevant stakeholders in Burundi, in particular women’s rights organizations
Completed Activities:
- In FY 2020/21, the Canadian High Commission in Kigali, Rwanda, produced 7 reports on the political, humanitarian, human rights, economic and security situation in Burundi. Kigali also produced situation reports on the COVID-19 pandemic. One report, on the topic of human rights, included an analysis of the status of gender equality in Burundi, and a recommendation for Canada to explore programming options to support conflict prevention and peacebuilding in Burundi, including in the domain of women, peace and security.
- One project was funded through the Canada Fund for Local Initiatives, which took into account gender dimensions.
Results and Progress:
As described in the annual report for the FY 2019-20, Kigali, as a micro-mission, faces significant resource challenges towards meaningful implementation of the 15.1 target as originally stated.
Kigali is not located in the target country and Canada’s ability to influence Burundi, including on gender issues, is limited. Canada's engagement on gender issues in the context of development aid and humanitarian support is also limited, and mostly performed remotely through headquarters, due to the nature of mechanisms used (e.g. absence of a bilateral development program), and limited mission capacity.
Challenges:
In 2020-21, the impact of the COVID-19 pandemic, particularly on travel and face-to-face meetings, added to the challenges of implementing activities.
16. Democratic Republic of Congo
Context: Canada provides humanitarian and development assistance to the DRC to address the needs of the poorest and most vulnerable, including those affected by the country’s ongoing conflict and state fragility. Canada’s development assistance aims to improve the health of women and children, advance their rights, increase their political, economic and social empowerment, and support democratic governance and peaceful pluralism. Canada’s programming in the DRC includes efforts to combat SGBV at the national and regional levels, with a focus on provinces affected by conflict in the Eastern region. Programming is aligned with the DRC’s National Strategy to Combat GBV (2009). Through projects and policy dialogue, Canada advocates for the rights of women and girls, women’s empowerment and the end to impunity for perpetrators of sexual and gender-based crimes and promotes social behavioural change. Projects provide health, psychosocial and legal services and assistance to survivors of SGBV, strengthen key national institutions, and support local women’s organization to advance gender equality and women’s rights. More broadly, Canada engages in policy dialogue with the DRC government, the donor community and other stakeholders on a broad range of issues related to women’s rights and participation in society, including the fight against SGBV. This includes advocating for greater commitment by the DRC government on the prevention of SGBV and the fight against impunity, improving donor collaboration, promoting coherent efforts and approaches, and increasing protection measures for women and girls affected by the country’s regional conflicts.
Priorities: Increase the number of leaders committed to and engaged in the fight against all forms of sexual and GBV in the DRC
16.1 Target: Canada engages with key DRC stakeholders in the prevention and behavioural change efforts in order to strengthen their commitment to address the root causes of SGBV
Target achieved to date as of March 31, 2021: On track/Objective 2
- In FY 2020/21, Canada continued its outreach and coordination activities with key stakeholders in the DRC sector, including the Government of the DRC.
Baseline:
- Some awareness of root causes but little is translated into action.
Activity:
- Conduct educational, advocacy and behavioral change campaigns with key national, regional and local stakeholders
- Support civil society to hold leaders to account
Indicator:
- Perception by women's organizations that there is a greater national dialogue on these issues and action taken at different levels.
- # of outreach/advocacy/engagement efforts with stakeholders on the root causes of SGBV
Completed Activities:
- From April to December 2020, Canada continued to lead the Call to Action against Gender-Based Violence in Humanitarian Action in DRC.
- Canada has been very active in national and inter-donor coordination of the gender sector. From April to October 2020, it continued to provide leadership in the coordination of the inter-donor gender group, coordination with ministries responsible for gender at the national and provincial levels of the Gender Thematic Group (sector coordination framework). As of October, Canada passed the leadership to Sweden and continues to actively participate in all these dialogue spaces.
- A brand new group of seven Ambassadors (the "feminist friends") was also born for political advocacy at a higher level to push the feminist agenda with the Congolese authorities, with Sweden and Canada as leaders (because of their feminist international aid policies) with five other Ambassadors having joined (Great Britain, United States, France, Belgium, European Union)
- On the margins of the celebration of International Women's Day, the Canadian Embassy brought together several Congolese civil society organizations fighting for women's rights on Thursday, March 18, 2021, in Kinshasa for a round table discussion. This consultation platform identified a series of priority actions including electoral reforms, the launch of the Zero Tolerance Campaign against sexual violence and the political participation of women in decision-making bodies with a view to a common advocacy that could lay the foundations for a constructive dialogue with the new presidential cabinet. A joint declaration was issued at the end of the meeting and was shared on social networks. The Canadian Ambassador was able to hand-deliver this statement to the President of the DRC a few days later.
- Canada has also supported, through its Field Support Services Project (FSSP), the National Secretariat of Resolution 1325 in the process of developing and finalizing the operational plan of the UN Security Council's 2nd Generation National Action Plan on Women, Peace and Security for the period from 2020 to 2023 in the DRC. This plan was unanimously validated during the Council of Ministers in August 2020.
- The Fighting GBV: Justice, Empowerment and Dignity of Women and Girls in DRC (United Nations Development Programme, $18.0M, 2018-2023) and Women's Voices and Leadership in DRC (Carter Center, $8.7M, 2019-2024) projects launched in 2018 and 2019, respectively, routinely carry out prevention and behavior change activities related to GBV in DRC. During the 16 Days of Anti-Violence Activism commemorations (November 25-December 10) and during the month of March, large-scale activities were organized with communities and decision-makers to solicit more engagement in the fight against violence and more access to human rights.
Results and Progress:
Since 2006, Canada has been engaged in the fight against SGBV through its various initiatives, the most recent of which are the SGBV Project: Justice, Empowerment and Dignity of Women and Girls and Women's Voices and Leadership (WVL) in the DRC which are national in scope. The development and launch of these projects has deepened the dialogue with key actors in the Congolese women's movement on gender equality and the best approaches to address the root causes of SGBV.
In FY 2020/21, the Canadian Embassy in the DRC supported a number of SGBV awareness-raising activities with various stakeholders in the DRC. These included:
- In August and September 2020, WVL 's local partner organizations conducted the launch in Kananga and Mbandaka of project activities. In Mbandaka, the Canadian Ambassador took the opportunity to emphasize to provincial authorities the need to support actions to promote rights and reduce inequalities. WVL 's in Mbandaka was welcomed as one of the few programs targeting the needs of women in the province.
- As a result of increased advocacy by WVL partner organizations in Mbandaka, Equateur Province, the provincial governor appointed a female provincial police inspector and a female provincial health inspector; while in Kisangani, Tshopo Province, the governor appointed a second woman as a provincial minister in his cabinet, bringing the total to two women out of nine members of government. In Kinshasa, the two VLF partners actively participated in the advocacy led by women's rights organizations (ODDF) for more women's representation in the cabinet of the new Prime Minister Sama Lukonde. As a result of this advocacy, women's representation in the current government has increased from 12% to 27%. ODDF Kinshasa was also among the civil society organizations and political parties that advocated for the revision of the Electoral Law and the Independent National Electoral Commission.
- Sensitization activities on women's protection and empowerment were organized by local WVL partner organizations during the COVID containment period. In the six provinces where the WVL program is implemented, several cases of GBV were identified and several victims were accompanied.
- Canada also continued to advance the engagement of key stakeholders in the fight against SGBV through its leadership and active participation in coordination spaces. These spaces, which include the gender theme group (chaired by the Minister of Gender), the inter-donor gender group, the One + One group (donors, UN and INGOs), the Feminist Friends Ambassadors group and the sub-cluster of the SGBV group, allow for discussion, exchange and joint solutions to the challenges in the fight against SGBV.
Challenges:
It is important to note the slowness of the DRC government to implement the concrete actions put forth through this policy dialogue. However, it must be recognized that on a small scale, changes in the status of women and girls are being observed at the national, provincial and local levels through the involvement of, among others, the country's political and administrative authorities.
Priorities: Increase the availability and use of health, psychosocial and protection services for survivors of SGBV in the DRC
16.2 Target: Canada supports the measures outlined in DRC’s National Strategy to Combat GBV (2009) to increase national leadership and coordination and make services available to survivors of SGBV.
Target achieved to date as of March 31, 2021: On track/Objective 2
- After a long process that began in 2015, the revision of the national strategy to combat sexual and gender-based violence was completed with its formal adoption by the Council of Ministers in July 2020. The DRC now has a concerted, more inclusive convergence framework that should make it possible to achieve concrete results in order to improve the situation of women and girls, in addition to safeguarding their dignity, fighting SGBV and promoting peace.
Baseline:
- Plan exists but it requires updating, as well as a dedicated budget.
Activity:
- Build the capacity of key national institutions and civil society to put in place needed reforms and action agreed measures, as well as to commit resources and provide services
- Through programming and advocacy, support key national institutions and local civil society networks to deliver on their mandates in the fight against SGBV and to support survivors
- Develop programming to prevent and respond to SGBV, in line with Canada’s commitment to advancing SRHR, including by engaging men and boys and the prevailing norms in their respective communities.
Indicator:
- # of Canadian supported interventions to prevent and respond to SGBV
- Progress on the measures outlined in DRC’s National Strategy to Combat GBV
- Demonstrated commitment by the government to put in place prevention, protection and response strategies to address SGBV.
Completed Activities:
- The GBV Project: Justice, Empowerment and Dignity of Women and Girls (JAD) (GE03, UNDP, $18M, 2018-2023) has actively contributed to the entire process of revising and validating the national strategy to fight against GBV. The implementation of this concerted and harmonized document will make it possible to achieve results in terms of improved coordination and management in this sector.
- Thanks to the advocacy work of the Justice, Empowerment and Dignity of Women and Girls program, the central government's Minister of Gender was able to have the project to institutionalize the CISMs (integrated multi-sectoral service centers for survivors of SGBV) adopted by the Council of Ministers. The new government in place has made the institutionalization of CISMs a priority in its action plan.
- Eleven local recipient organizations of the WVL project (GE03, The Carter Centre, $8.7M, 2018-2024) have been selected to receive organizational and technical capacity building. This will enable them to gain skills to conduct evidence-based advocacy, coordination, and leadership, while leveraging innovative, effective, and efficient approaches to advance gender equality and empower women and girls.
- In conjunction with the celebration of Women's Month and as part of the advocacy for the institutionalization of the SGBV survivor care approach through the Integrated Center for Multi-Sectoral Services (ICMS) model, the Canadian Embassy organized a joint visit with ambassadors and heads of cooperation in March 2020 in the company of Dr. Denis Mukwege, Congolese Nobel Peace Prize winner. This visit raised awareness of the benefits of this model of care and fostered a commitment to not only support Canada's advocacy, but also the establishment of CISMs in new regions.
Results and Progress:
Through Canadian-funded initiatives, coordination spaces exist to effectively discuss, exchange and find joint solutions to SGBV challenges. These include the inter-donor group on gender and the sub-cluster on SGBV, where Canada is very active, as well as the spaces for coordination at the provincial level within the framework of the project Fighting SGBV: Justice, Empowerment and Dignity for Women and Girls.
Challenges:
It is important to note that the SGBV: Justice, Empowerment and Dignity of Women and Girls project has been over-programmed and is not in line with the available budget. This situation could jeopardize the achievement of some of the project's results. Regarding the Integrated Multi-Sectoral Service Centers (IMSCs) for SGBV survivors, future government funding for these structures may not be assured. For this reason, Canada's ambassador to the DRC is contributing to the policy dialogue in collaboration with JED partners so that the DRC government and other development partners can take ownership of this approach to survivor care and that it be officially integrated into the national protocol for the management of sexual and gender-based violence.
In December 2020, Canada completed its leadership role in the Call to Action to address SGBV in humanitarian settings. This provided another forum for Canada to engage in policy dialogue to advance women's rights and the fight against SGBV in the DRC.
The DRC government also continued its participation in the steering committee of the joint evaluation of the SGBV sub-sector. In addition, with the results of this evaluation, the national Ministry of Gender, Family and Children has agreed to review and enrich the National Strategy to Combat SGBV to improve its effectiveness and scope. Government actors are also participating in the inter-donor gender group, as well as the sub-cluster on SGBV and the Call to Action against Gender-Based Violence in Humanitarian Settings.
Priorities: Support the empowerment of women and girls in preventing/addressing SGBV in the DRC
16.3 Target: Canada continues to advance a portfolio of projects to advance the rights of women and girls, women’s empowerment, and the implementation of the WPS agenda in DRC.
Target achieved to date as of March 31, 2021: On track/Objective 2
- Nine projects supported by Canada in which gender equality is fully integrated and women are at the heart of the initiatives, both as beneficiaries and promoters (two GE03 projects and three GE02 projects).
Baseline:
- Many women’s organizations are dedicated to advancing women’s empowerment and rights but lack capacity and the means to advance their objectives.
Activity:
- Develop projects that advance GE and focus on increasing women’s rights, leadership and control over resources
Indicator:
- # and % of projects that integrate GE considerations coded GE02 and GE03 in which women’s empowerment is a core objective and results in advancing GE.
Completed Activities:
Canada supports nine active projects that advance women's and girls' rights, women's empowerment, and the implementation of the Women, Peace and Security Program in the DRC that are coded GE02 or GE03:
- Fighting SGBV: Justice, Empowerment and Dignity of Women and Girls in DRC (GE03, UNDP, $18M, 2018-2023) contributes to the reduction of gender-based violence through the adoption of gender-sensitive attitudes and socio-cultural norms, the empowerment and resilience of survivors through holistic care, and the strengthening of national-level coordination.
- The Women's Voices and Leadership in DRC project (GE03, The Carter Centre, $8.7 million, 2018-2024) provides women's organizations with the tools, resources, funding, and sponsorship to build and sustain their technical and organizational capacity to create progressive change, promote women's and girls' rights, and strengthen gender equality in five provinces of the DRC.
- The Access to Health Services in Kinshasa project (GE02, Center for International Cooperation in Health and Development, $19.9M, 2017-2023) strengthens improved availability and utilization of health services, including sexual and reproductive health for women and girls, including maternal and newborn care. The project also helps strengthen the management of health facilities and access to sexual and reproductive health services for women and girls, including post-abortion care and methods.
- The Growing Up Well project (GE02, Save the Children, $10M, 2018-2021) aims to address the sexuality education and social behavior change needs of pre-adolescents and adolescents. Activities also seek to create a supportive social environment that enables adolescents to exercise their sexual and reproductive health rights and protect them from gender-based violence.
- Canada is also funding four projects (GE02) (one of which is regional) as part of its commitment to the reintegration of women and girls in crisis and conflict situations made at the G7 meeting in Charlevoix. These projects target the reintegration of girls into the school system through capacity building and awareness raising, increasing the commitment of state and non-state actors to gender-sensitive and safe education for girls, and combating SGBV.
At the more specific level of peace and security, Canada has been able to:
- Contribute to the deployment of 15 Canadian police officers, including 5 who happen to be in the specialized police team against sexual and gender-based violence.
- Through the Mission Initiative Fund, KNSHA has funded three activities in conjunction with other local embassies and the national government to advocate for the Women, Peace and Security agenda (including celebrating the 20th anniversary of the resolution in November 2020 and an event with the UN Special Representative of the Secretary General on Sexual Violence in Conflict (November 2019) and against the use of child soldiers (February 2021).
- Following KNSHA's advocacy, the DRC endorsed the Vancouver Principles in November 2020.
- Through Canada's assessed contributions to the United Nations Organization Stabilization Mission in the Democratic Republic of Congo (MONUSCO).
Partnership for Innovation
Through the project Femmes de courage - Femmes, paix et sécurité en RDC , KAIROS and its local partner are enabling individuals and organizations that advocate for women's human rights to participate effectively in post-conflict development, peace and security processes. Key activities are: 1) psychosocial and legal support to help survivors recover and seek justice for the physical and psychological violence they have experienced; 2) training for individuals and organizations advocating for women's human rights on gender analyses and national and international human rights frameworks as well as organizational capacity building; 3) improving the 2nd generation of the National Action Plan and the implementation of UN Security Council Resolution 1325 on Women, Peace and Security; 4) holding South-South exchanges to facilitate networking, mutual learning and skills development.
Stabilization and Peace Operations Program(PSOPs)
- La localisation des résolutions du Conseil de sécurité sur les femmes, la paix et la sécurité (PSOP 20-038) is the most recent project of the Global Network of Women Peacemakers. This project aims to encourage the active and meaningful participation of women in Colombia, the Democratic Republic of Congo (DRC), Lebanon, and Nigeria in the implementation of United Nations Security Council Resolution 1325 (UNSCR 1325) on women, peace and security, including peace processes and peacebuilding. This project ensures a long-term improvement in peace and stability and generates a better response to the coronavirus pandemic in the four countries. Project activities include: (1) identification and mapping of key stakeholders, including local women, women's organizations, civil society organizations, and local leaders; and (2) organization of workshops, media training, and production of lessons learned on the active and meaningful participation of local women in the implementation of UNSCR 1325, including in peace processes and peacebuilding. This project is scheduled to end in 2023.
- The project Confronter le militarisme et la masculinité : Construire des alliances, analyses et plaidoyer (Women's International League for Peace and Freedom, $1.7M, 2020-2022) in DRC, Colombia, Afghanistan, and Cameroon, aims to address the root causes of gender-based violence and support local advocacy to advance the WPS agenda and broader peace and security efforts. The project will include research, knowledge sharing, advocacy, movement building, and grants to grassroots organizations on the theme of men, militarism, and masculinity.
Mission Discretionary Fund (MDF/MIP)
Activities related to the 16 Days of Activism, in partnership with other embassies, such as the November 2020 event to celebrate the 20th anniversary of UNSCR 1325.
Canada Fund for Local Initiatives (CFLI) (2020/21)
All of our projects have gender equality as a cross-cutting theme. Some projects were particularly related to the theme:
- CDJP (Bukavu): Strengthening the participation of women and youth for the improvement of local governance through the creation of space for dialogue for conflict prevention. The project, focused on peacebuilding, strengthens local community mechanisms for good governance, social cohesion and the promotion of a culture of peace and human rights.
- Mbongi ya Nsobolo (Isangila, Central Kongo): The objective of the project is to strengthen the capacities of 40 women from ISANGILA, 10 from each group. The capacities strengthened concern the prevention and mediation of land conflicts through participatory mapping workshops as well as the use of traditional mechanisms for the prevention and resolution of land conflicts.
- REAFECOM: Empowerment and security of women and girls in Mambasa territory, DRC, through dialogue and community engagement for non-violence against women. The goal of this project is to increase the empowerment and security of women and girls through the promotion of gender equality and empowerment, and the prevention and mediation of conflicts in the mining areas of Mambasa territory, DRC.
Results and Progress:
In FY 2020/21, the majority of active projects fully integrate gender equality or make it their primary focus (including two GE03 projects and three GE02 projects).
Challenges:
The change of government in April 2021 represents a challenge in managing these projects. The relationship between Canada and the DRC needs to be rebuilt and solidified. In addition, FCIL's CDJP (South Kivu) and REAFECOM (Ituri) projects must operate in complex environments where general violence and GBV persist or are on the rise.
17. Mali
Context: Since 2012, Mali has been facing profound governance, development and security challenges. Instability is persistent and is progressing, while the security context is becoming more complex. While Mali’s fragility is more noticeable in the north and increasingly so in the centre of the country, the country as a whole is still in a very precarious situation. In the north and centre, humanitarian and development organizations’ access to civilian populations remains a challenge. The government and most armed groups in the north signed a Peace and Reconciliation Agreement in June 2015, but there has been slow and uneven implementation of the accord and increasing attacks by terrorist groups. Despite the presence of the French CT force, and a large UN peacekeeping mission, the country continues to face serious threats to its stability and security. Traditionally, women in Mali have been active behind the scenes in resolving conflict in their communities. However, very few women and women’s groups have participated in peacebuilding activities and fewer still have been actively involved in the formal peace process in Mali.
In FY 2018/19, Mali was the second-largest recipient of Canadian international assistance in Sub-Saharan Africa. Canada is engaged in policy dialogue with the Government of Mali, the donor community and other stakeholders on a broad range of issues related to women’s rights and participation in society, and Canadian development assistance is intended to help the country build a brighter future for its people by concentrating on access to sexual and reproductive health care services; nutrition; improving the quality of education and vocational training; increasing agricultural productivity; and better governance and accountability. This also includes support to Mali’s transitional justice and national reconciliation process. Canada is an active member of the donor coordination groups in Mali and maintains an ongoing and open dialogue with Malian authorities. Canada is also co-leading the GE donor coordination group and uses this platform to promote the rights and empowerment of women and girls. Canada also uses other platforms and networks (e.g. International Women’s Day, VIP visits, sector committees and working groups, the Francophonie) to show its support for the implementation of UNSCR 1325 in Mali and also the implementation of the Mali national gender plan, which was developed with Canada’s assistance.
Priorities: Support the increased and meaningful participation of women in reconciliation and conflict prevention and enhance women’s access to justice in Mali
17.1 Target:
- Increased access for women and girls to justice services and legal representation for the promotion and protection of their human rights.
- Increased participation of women, youth and others affected by the crisis, to reconciliation and conflict prevention.
Target achieved to date as of March 31, 2021: On track – 17.1.1, 17.1.2/Objective 3 and 1
The JUPREC project, which ended on March 31, 2020, met or exceeded most of its targets, many of which correspond to the targets outlined in the Action Plan implementation plan.
- The approval in February 2021 of the Support for Justice and Peace in Mali project brief provides an opportunity to continue to make progress toward these targets by the end of the Action Plan. However, it is too early to report on progress for this project.
- The PSOPs projects in Mali in 2020-2021 (SCVJR, Strengthening Security Governance in Northern and Central Mali) have contributed to this target while working in complementarity and continuity with the above-mentioned development program initiatives in rights protection and peace building activities, demonstrating a willingness to implement a triple bottom line approach.
- At the level of GAC initiatives, we can consider the target achieved, since the projects have contributed to strengthening the capacity of CSOs to promote human rights and support women leaders in their reconciliation and conflict prevention efforts, and to supporting increased and concrete participation of women in reconciliation and conflict prevention, and increasing women's access to justice in Mali.
- However, in light of the deteriorating context, attention is needed to pursue the goal of increasing women's access to justice in Mali (see also section 1 on challenges to increasing women's participation in reconciliation and conflict prevention).
Baseline:
- Limited capacity of CSOs to promote human rights and support women leaders in their reconciliation and conflict prevention efforts. Justice, prevention and reconciliation for women, minors and other persons affected by the crisis in Mali (JUPREC) [2014-2021].
Activity:
- Support CSO in providing legal aid and judicial assistance to protect and respect for the rights of persons affected by the crisis in Mali, including women and minors.
- Support to various reconciliation and conflict prevention mechanisms at the community and national level that integrate women and youth affected by the conflict.
Indicator:
- # of new practices and tools adopted by CSO in their legal interventions and representation with the purpose of respecting and protecting human rights of those affected by the conflict, in particular women.
- # of commitments and mechanisms for conflict prevention, reconciliation and transitional justice that include women and youth at the community and national level.
- # of women leaders supported by Canada on reconciliation and conflict prevention
Completed Activities:
- Justice, Prevention, and Reconciliation (JUPREC, 2014-15 to FY 2020/21) for women, minors, and others affected by the crisis in Mali supported civil society organizations to provide legal assistance to protect and respect the rights of people affected by the crisis in Mali, including women and minors. For example:
- Model women's and men's organizations have been strengthened and are providing services, conducting investigations, and accompanying women in the exercise of their rights, as well as a network of actors able to support GBV victims to appropriate services.
- The "Hope" advocacy committee, made up of 18 CSOs, is mobilized in order to ensure that victims' rights are taken into account in public policies.
- Training of trainers has been provided to CSOs on integrity management, the fight against corruption, codes of ethics, partnership development and fundraising.
- Lawyers were deployed to communities through the establishment of legal clinics by the Tribune Jeune pour le Droit au Mali (TRIJEUD) in Mopti, Gao and Bamako to facilitate follow-up legal assistance to victims of violence. They were able to provide legal aid and judicial assistance to 1,526 people, including 1,000 women.
- TRIJEUD continues to develop expertise in strategic litigation and is now able to identify strategic litigation cases.
- The project team participated in the work of the Permanent Law Commission (CPL), in charge of the reform of the Penal Code and the Code of Criminal Procedure, by formulating proposals to ensure that victims of international crimes benefit from protective measures.
In addition, through PSOPs’ Support to the Truth, Justice and Reconciliation Commission for the Stabilization of Mali (SCVJR, 2019-2021) initiative, 86 victims of human rights violations, including 71 women, have been represented before national or supranational courts. SCVJR has enabled 1,480 women (almost 60%), 377 men, 496 girls (20%) and 134 boys to benefit from protection, awareness-raising and mobilization of victims to give their statements in the regions of Mopti, Gao and Kidal, while 76 victims of gender-based violence, including 64 women, have benefited from group therapy, individual interviews and awareness-raising sessions.
- JUPREC has also supported various community and national reconciliation and conflict prevention mechanisms that include women and youth affected by the conflict. For example, it has:
- Supported the creation of peace committees for conflict prevention and resolution, particularly in the regions of Segou, Mopti, Timbuktu and Gao;
- Enabled the consultation of nearly 4,000 victims of the conflict on their perceptions, expectations and needs which influenced the work of the Truth, Justice and Reconciliation Commission (TJRC) and the national policy of reparation for the suffering of victims of human rights violations;
- Strengthened the mandate and functional work of the TJRC, leading to the strengthening of reconciliation and the right to the truth.
- Supported the Hope Advocacy Committee against the Law of National Accord (LEN), which participated in national consultations and made substantial amendments to the law before its enactment, taking into account the concerns of victims.
Quote on leaders' satisfaction that a diversity of actors were involved in conflict resolution under JUPREC:
"[before] conflicts were only managed by imams; but now, other actors (women and youth) participate in conflict management" and speak up to express their needs before traditional leaders."
"Women know their rights, they are trained and there is understanding in the homes. Men used to prevent women from going out, participating in development activities and meeting in associations, but today there is a clear improvement."
Mr. Macalou, Secretary General of the TRCJ, on March 10, 2021, on the work of solidifying the database of victims' statements (Output 1113):
"CBSA's support allowed us to see the potential of the victim statement database, how we could analyze it to extract the consequences and causes of conflicts."
Results and Progress:
At its conclusion in March 2020, JUPREC led to:
- 19 new practices and approximately 40 tools adopted by CSOs in their legal interventions and representation with the aim of respecting and protecting the human rights of those affected by the conflict, particularly women.
- 40 community commitments and 10 recommendations for conflict prevention, reconciliation and transitional justice that include women and youth were made during the project (e.g., commitment to establish village peace committees and adoption of Natural Resource Management Agreements and Pastoralist-Community Agreements).
- Increased participation of women in public forums. 18 women leaders trained by the project have been elected as communal or village councillors and 11 women in the Gao region have been elected as mayoral councillors.
In addition, through Canada's support to the MINUSMA Trust Fund, 21 women have been included in the monitoring mechanisms of the peace agreement in Mali. Previously, there were no women represented.
Complementing the results of JUPREC, the SCVJR initiative has resulted in:
- The development of 26 new actions (out of a target of 20) and tools to enable the CVJR to be a catalyst for peace, such as the production of 12 investigation reports and four victim counseling reports.
- The support mechanism for CSOs under the SCVJR initiative has made it possible to strengthen the involvement of women and girls (115/209, or more than 55% of the beneficiaries of the mobilization) in the transitional justice process through their participation in the work of the Truth, Justice and Reconciliation Commission (TJRC).
- " Without raising awareness of the TJRC’s mandate and the financial support of the project, I was not going to make any statement, because I was unaware of the existence of the TJRC and I lacked the means to make the trip to Mopti.” Woman who gave her statement in Mopti.
These projects will give way to the new Support for Justice and Peace in Mali project (2021-2025), supported by GAC and implemented by Lawyers Without Borders Canada, which will build on these gains and expand on this target 7.1. The project aims to combat impunity, increase access to legal aid services, and ensure that women, girls, and other vulnerable people (VHP) realize their human rights in the context of gender equality, reconciliation, and peace in Mali.
As part of the initiative to strengthen security governance in northern and central Mali, out of 86 community dialogue sessions held in Mali with 135 women and 265 men, at least 16 dealt with the role of women and/or youth in conflict prevention and resolution and/or dynamics that particularly affect women or are gender-related, such as discrimination in education, early marriage, or gender-based violence. The inclusion and representation of women in government institutions in Mali, however, continues to be a significant challenge.
In Mali, in a project with Avocats Sans Frontières Canada, the support mechanism for civil society organizations made it possible to strengthen the involvement of women and girls (115/209 or more than 55% of the mobilization beneficiaries) in the transitional justice process through their participation in the work of the Truth, Justice and Reconciliation Commission (TJRC).
2,477 people, the majority of whom were women: 1,480 women (59.74%), 377 men, 496 girls (20.02%), and 134 boys benefited from protection, awareness-raising, and mobilization of victims to give their statements in the regions of Mopti, Gao, and Kidal.
76 victims of gender-based violence, including 64 women, benefited from group therapy, individual interviews and awareness sessions.
Out of 86 community dialogue sessions organized in Mali by International Alert with 135 women and 265 men, at least 16 sessions dealt with the role of women and/or youth in the prevention and resolution of conflicts and/or with dynamics that particularly affect women or are related to gender, such as discrimination in education, early marriage or gender-based violence.
The inclusion and representation of women in government institutions in Mali continues to be an important challenge. An important advance is the inclusion of 21 women in the monitoring mechanisms of the Mali peace agreement, thanks to Canadian financial support. Previously, there were no women represented.
Challenge:
While JUPREC has undoubtedly contributed to the fight against GBV, impunity and corruption, and to better access to justice for women, minors and other people affected by the crisis, major challenges remain to achieve optimal respect for rights in Mali. At the end of the project, the increase in violence and human rights violations, as well as the deterioration of the security situation in the country, demonstrates that the fight against impunity and the support of victims are still necessary in Mali.
PSOPs is making progress towards these targets in Mali, working to increase women’s access to justice and increasing the participation of women in the peace process. However, it is challenging to make significant gains in these areas within a socio-political context dominated by men. Additionally, implementation of key elements of the Algiers Accord is stalled, compounded by the August 2020 coup and continuing political turmoil.
Priorities: Advance WPS in Canadian diplomatic engagements in Mali
17.2 Target: Increased advocacy and engagement with interlocutors, including government officials, on Canada’s WPS position and priorities on WPS in Mali.
Target achieved to date as of March 31, 2021: Mostly on track/Objective 1
- The Canadian Embassy in Mali has updated its Strategy and Engagement Plan for the Policy Dialogue for 2021-22, which includes a pillar on governance and a pillar on gender equality. This plan sets out Canada's key messages on: democracy; good public governance (state reforms, accountability and the fight against corruption and impunity); civil society engagement and mobilization; improving the justice system; operationalizing the MPFEF's PRODAFFE 2020-2024; Women, Peace and Political Governance; Gender Responsive Planning and Budgeting; and Addressing Sexual Gender-Based Violence. This builds on previous Canadian Policy Dialogue efforts through various hearings and forums.
- Several operational projects of the development program in FY 2020/21 have supported this dialogue with concrete actions, such as supporting CSO advocacy in the fight against corruption, fighting impunity, empowering women and girls, etc.
- The Plan of Engagement for the 2021-22 policy dialogue in Mali identifies specific indicators for which it is too early to comment.
Baseline:
- Canada raises issues with Malian authorities and other donors related to: the protection of women and girls and representation of women in the security sector (as part of reconciliation processes), female genital mutilation, SGBV, peacebuilding activities (including economic empowerment), and other WPS-related issues.
Activity:
- Increase focus of advocacy efforts on advancing the rights of women and girls related to WPS priorities and principals.
Indicator:
- # of outreach/advocacy/engagement efforts where WPS principles were advanced with stakeholders
- # of outreach/ advocacy/ engagement efforts with stakeholders on roots causes of SGBV
Completed Activities:
- In FY 2020/21, Canada continued to share with Malian authorities and other donors its perspectives on opportunities and challenges related to the protection of women and girls and women's representation in the security sector (as part of reconciliation processes), female genital mutilation, SGBV, peacebuilding activities (including economic empowerment), and other WPS-related issues.
- Canada is a co-founder and member of the Friends 1325 group, which aims to advance the Women, Peace and Security agenda in Mali. As part of this effort, Canada financially supported and participated in the January 22-23, 2020, National Workshop on Women's Participation in the Implementation of the Peace and Reconciliation Agreement in Mali. One of the recommendations of this workshop was to create an independent Observatory for better representation of women in governance, monitoring and evaluation of the implementation of the Peace Agreement, and for the effective application of texts on women's rights. Canada has advocated for the implementation of this recommendation.
- In 2020, Canada contributed to the publication of a study by the Ministry for the Promotion of Women, Children and the Family on the incidence and prevalence of gender-based violence (GBV) throughout the country as well as to the revision of the Sexual and Reproductive Health (SRHR) Policy, Standards and Procedures Manual.
- Through several projects supported by Canada, hundreds of thousands of Malian men and women have been sensitized to GBV and SRHR in the last few years, including 240,000 adolescents and young people through the Spotlight+ project and 67,389 people through JUPREC.
Results and Progress:
The Roundtable on the Rebuilding of the State held on March 15, 2021, was an opportunity for Canada to encourage the Government of Mali to establish a dialogue with all civil society actors, including women and girls, to better take their needs into account, and to involve them in the elaboration, implementation and monitoring-evaluation of development policies and programs. Canada has led ongoing advocacy, including in FY 2020/21, to promote commitment to gender equality, including as co-chair of the Gender and Women's Empowerment Thematic Group (GWEG), which is the technical and financial partners' coordination group on gender equality.
Through its operational projects in the area of inclusive governance, the Mali Development Program continuously supports various advocacy and awareness-raising actions in favor of women's participation in peace processes, the defense of rights, and the fight against impunity, corruption and gender-based violence.
- Through the Promoting Gender Equality and the Empowerment of Women and Girls (Spotlight+) project with UNFPA (2019-20 to 2021-22), Canada continues to support CSOs and the MPFEF involved in the fight against GBV to implement more contextually appropriate communication approaches to better explain the concept of GBV to enable opposing organizations to adhere to the principles of advocating for the rights of survivors
- The Women’s Voice and Leadership (WVL) - Musoya Mali project (2018-19 to 2023-24), directly supports 25 partners (19 Local Organizations for the Defense of Women's and Girls' Rights (OLDDF/F) and 6 Platforms, Alliances and Networks (PAR)) with over 3,000 members. Even though 2020 was heavily impacted by the pandemic, all LWDAs/F have integrated at least two innovations in their programmatic approach related to ICTs, positive masculinity, gender equality or organizational strengthening tools. For example, a watchdog unit on gender-based violence (GBV), which was on the rise during the lockdown, was set up using ICTs.
- As part of the Public Accountability and Women's Participation in Mali (RPPFM, 2018-19 to 2021-22), in October and November 2020, 200 women leaders from the regions of Kayes, Koulikoro, Ségou, Sikasso and Bamako benefited from a second training to consolidate their capacities in terms of advocacy, resource mobilization and political leadership. These trainings allowed the National Council of Civil Society to create a pool of women who are experienced in promoting HFE and advocating for accountability.
Challenges:
The coup d'état in Mali on August 18, 2020, brought institutional instability that complicated advocacy efforts with Malian authorities. To combat transmission of COVID-19, the government of Mali implemented measures to restrict gatherings, which impacted some planned outreach activities.
The examples of results above demonstrate Canada's sustained and responsive engagement with the evolving Malian context in advocacy, awareness raising, and stakeholder engagement on GE issues and respect for democratic principles and human rights, both in its coordination and dialogue activities and through GAC-funded development project activities.
However, it is unlikely that the deep and complex crisis in Mali will give way to a full resolution of instability and peace in 2022. Moreover, this situation presents a barrier to increased advocacy and engagement with interlocutors, including government officials, on Canada's position and priorities for WPS in Mali.
Priorities: Support women’s political, social and economic empowerment in Mali
17.3 Target: Canada’s development initiatives promote the empowerment of women and girls, including increasing women’s political, social and economic empowerment.
Target achieved to date as of March 31, 2021: Mostly on track/Objective 3
- Again this year, 100% of development assistance to Mali was GE-coded (at least GE-01) and the program is putting efforts in place to maintain or increase this target, through rigorous assessment of project proposals and collaboration between the program and implementing partners in the planning phase of projects to achieve the coding criteria.
- In particular, in FY 2020/21, the program collaborated with GAC gender specialists and partners in the planning phase of initiatives where GE coding was weaker to strengthen the integration of GE into the project design.
- A progression since the beginning of the CNAP is noted on the number of GE-03 projects (the program had only 2 in FY 2017/18).
Baseline:
- Operational development projects that integrate GE and support to women’s political, social and economic empowerment in Mali (2017-2018).Out of 28 operational development projects: 20 projects are coded GE02 (71%) and 2 projects are coded GE03 (7%)
Activity:
- Fund projects where women’s rights, leadership and control over resources are core objectives, including capacity building of key government ministries and support to civil society.
Indicator:
- # and % of projects that integrate GE considerations coded GE02 and GE03 (7%) in which women’s empowerment is a core objective and results in advancing GE
Completed Activities:
- The bilateral development program in Mali continued in FY 2020/21 to fund projects with core objectives related to women's rights, leadership, and control over resources, including capacity building in key government ministries and support to civil society.
- During 2020-21, several new projects coded GE-02 and GE-03 have been approved in which women's empowerment is a core objective and contributes to advancing the GE.
- The development program makes deliberate choices to fund projects that have GE as a primary outcome or that fully integrate it, valuing project proposals received that are assessed as fitting this definition and/or working with partners to bring proposals that do not meet these principles to this level of integration.
Results and Progress:
By 2020-21, 100% of bilateral development assistance to Mali was addressing GE. Of 32 projects operational and in final stages of completion, 10 projects (31%) targeted GE as a primary outcome (EG-03), 16 projects (50%) were fully integrated (EG-02), and 6 projects (19%) were partially integrated (EG-01).
Overall, the projects in the development program contribute to funding with core objectives related to women's rights, economic empowerment, leadership, access to essential services such as education and health, and control over resources, including capacity building of key government ministries and support to civil society. All of the projects target changes in behavior and practices that contribute to GE.
This represents progress from last year. In 2019-20, out of 23 operational projects, 6 projects targeted GE as a primary outcome (GE-03), 14 projects were fully integrated (GE-02), and 3 projects were partially integrated (GE-01).
Priorities: Mainstream WPS and gender into peace and security efforts in Mali
17.4 Target: Canada, through its PSOPs, demonstrates support for women’s increased and meaningful participation in improving peace and security in Mali by ensuring that WPS principles and/or gender perspectives are integrated in 80% of projects.
Target achieved to date as of March 31, 2021: Target Achieved or Surpassed/Objective 3
- 5 out of 6 (83%) of PSOPs projects in Mali integrated GE considerations (GE02 and GE03 levels.)
- 0 projects of PSOPs projects in Mali explicitly target GE (GE03 level)
- Thanks to Interpeace, security and civil society actors (224 women and 277 men) have formulated recommendations for better implementation of community policing in Kayes.
- Thanks to Canada's financial support of the Peace and Security Trust Fund of the United Nations Multidimensional Integrated Stabilization Mission in Mali (MINUSMA), 21 women are integrated into the monitoring mechanisms of the peace agreement in Mali
- Out of 86 community dialogue sessions organized in Mali by International Alert with 135 women and 265 men, at least 16 sessions dealt with the role of women and/or youth in conflict prevention and resolution and/or with dynamics that particularly affect women or are gender-related, such as discrimination in education, early marriage or gender-based violence.
Baseline:
- In the FY 2016/17, there were 3 (75%) projects that included WPS principles and/or gender perspectives.Footnote 12
Activity:
- Fund projects/activities supporting women’s engagement in peace and security activities
- Fund projects/activities aiming to increase the capacity of women to engage in peace and security activities
Indicator:
- # and % of PSOPs projects in Mali that integrate GE considerations (GE02 and GE03 levels
- # and % of PSOPs projects in Mali that explicitly target GE (GE03 level)
Completed Activities:
- Supported two gender advisor positions in MINUSMA
- Held 16 training sessions for 983 (184) civilians and uniform participations.
- Gender advisors supported the Malian Ministry of Women Affairs in the adoption of the new national action plan on WPS (2019-2023) and helped grow the representation of women involved in the Peace Agreement Monitoring Committee by 28%.
- Through Interpeace, security actors and civil society representatives (224 women and 277 men) made recommendations for better implementation of community policing in Kayes.
- Thanks to Canada's financial support of the Peace and Security Trust Fund of the United Nations Multidimensional Integrated Stabilization Mission in Mali (MINUSMA), 21 women are integrated into the monitoring mechanisms of the peace agreement in Mali.
- Through Alert International, out of 86 community dialogue sessions organized in Mali with 135 women and 265 men, at least 16 sessions dealt with the role of women and/or youth in conflict prevention and resolution and/or with dynamics that particularly affect women or are related to gender, such as discrimination in education, early marriage or gender-based violence.
Results and Progress:
Canada continued to support two gender advisor positions in MINUSMA to ensure WPS priorities were mainstreamed in UN peace operations in Mali. The gender advisors supported the training of UN staff on Gender in Peacekeeping Operations, holding a total of 16 training sessions for 983 civilian and uniform participants, of which 184 participants were women.
In coordination with the broader United Nations family, as well as the international community, the Gender Advisors supported the Malian Ministry of Women Affairs in the adoption of a new national action plan on Women, Peace and Security 2019-2023, signed on 12 November, 2020.
Finally, the Gender Advisors continued to support the meaningful participation of women in the political and peace processes in Mali. At the beginning of the project in 2018/2019, there were zero women out of 14 members constituting the Peace Agreement Monitoring Committee (CSA); two women in the four CSA sub-committees; zero women out of 42 members in the Integration Commission and one woman out of 34 members in the National Commission for Weapons, Demobilisation, for a total of three women. As of November 2020, there were 9 women involved in the Peace Agreement Monitoring Committee. Representation grew from 3% to 31%.
Challenges:
COVID 19 slowed down the process to approve new projects in FY 2020/21, 5 news projects in Mali are currently under review at different stages.
In November 2020, one of the gender advisors supported by the project accepted an offer for a deputy representative position at the UN Women office in Mali. This loss of capacity, while beneficial to the country as a whole, affected the pace of work that had begun in the mission. Supported by other UN staff members, the second gender advisor was able to continue advancing the mainstreaming of the WPS priorities in MINUSMA until the arrival of a replacement about four months after, due to lengthy UN recruitment processes.
Latin America and the Caribbean
18. Guatemala
Context: In 2016, Guatemala commemorated the 20th anniversary of the signing of the Peace Accords formally ending a 36-year internal armed conflict that left over 200,000 people dead and over one million people displaced, the majority of whom were Mayan Indigenous Peoples. Unfortunately, many of the underlying causes of the armed conflict are yet to be resolved. Achieving GE and the full exercise of women’s and girls’ rights remain a significant challenge in Guatemala’s society that is largely dominated by men. Discrimination and racism particularly affect Indigenous women and girls. VAW is widespread: Guatemala has the third highest rate of femicide in the world. The promotion, protection and respect for the rights of women and girls are at the centre of Canada’s development programming in Guatemala. Canada seeks to strengthen:
- gender-sensitive criminal investigations;
- access to justice and use of justice support services by women and girls particularly in cases related to SGBV; and
- respect for women’s and girls’ human rights including SRHR.
- Canada will develop specific GE initiatives to meet its objectives on advancing the rights of women and girls in Guatemala and will also ensure a high level of GE integration in all projects.
Canada will use all programming channels and diplomatic tools available to advance this work including policy dialogue with Guatemalan state officials, civil society, especially women’s organizations, and with the international donor community.
Priorities: Support a gender-responsive approach to transitional justice, reconciliation and security sector reform in Guatemala
18.1 Target: Canada improves institutional capacity for gender-sensitive criminal investigations in Guatemala.
Target achieved to date as of March 31, 2021: On track/Objective 3
- 5 approved projects (a 6th is now closed and a seventh is going to start) delivered substantial results to strengthen women and girls’ access to justice.
- A total of 2778 state authorities involved in justice related issues (1926 women and 852 men) received training on women’s rights and gender-sensitive justice in regards to criminal investigation, preventions of violence against women and human trafficking.
- The Canadian Embassy staff in Guatemala received one training session on Canada’s leadership on Gender and received tools to locally launch the #PeaceByHer pledge for #WomenPeaceBuilders in March 2021.
Baseline:
- As of April 2017, Canada had one project approved but no advances on gender-sensitive criminal investigations. Six women’s rights and gender-justice projects with criminal investigation strengthening components were in the design and/or seeking approval stages.
Activity:
- Provide training, policy dialogue, evidence gathering and strategic litigation that improves Guatemala’s gender-sensitive investigative and prosecution capacity in legal cases related to sexual violence and other gender-based crimes
Indicator:
- # of tools, processes and trainings developed to increase a gender-sensitive approach to investigations
- # of initiatives supported by Canada to strengthen women and girls access to justice in FCAS
Completed Activities:
Five initiatives supported by Canada worked to strengthen gender-sensitive criminal investigations in Guatemala. One new initiative was approved:
- Women’s Rights and Gender Sensitive Justice project [$6.15M, 2018-2024] (Bilateral Development)
- Strengthening of Capacities of Justice Operators working on human trafficking cases against women and girls and other individuals in situation of vulnerability project [$4.3M, 2018-2021] (Anti-Crime and Capacity Building Program)
- The Strengthening the Rights of Indigenous and other Discriminated Women in Guatemala project [$2.5M, 2018-2023] (Bilateral Development)
- The Strengthening Criminal Investigations and Evidence Sharing in Central America project [$4M, 2017-2021] (Anti-Crime and Capacity Building Program)
- Strengthening the Central America Justice and Security Sector capacities to effectively prevent, identify and prosecute cybercrime, transitional organized crime and associated case work through digital evidence: Guatemala, El Salvador, Honduras and Belize [$2.99M, 2019-2023] (Anti-Crime and Capacity Building Program)
- Human Rights Protection Fund Guatemala [$2.6M, 2021-2026] (Bilateral Development) – Too early to report.
The projects have supported training of a total of 2778 state authorities involved in justice related issues (1926 women and 852 men) on women’s rights and gender-sensitive justice in regards to criminal investigation, preventions of violence against women and human trafficking.
Results and Progress:
Results from programming in FY 2020/21 that strengthens gender sensitive criminal investigations include:
- The “Women’s Rights and Gender Sensitive Justice” project includes a component on investigation and litigation of sexual and gender-based violence crimes committed against women, as well as training of relevant justice actors. In 2020-21 the project advanced on three legal cases.
- A case on sexual abuse of Indigenous girls by their teachers in Alta Verapaz and the lack of appropriate disciplinary measures by the Ministry of Education. Advances included: 3 criminal cases before the courts and the Ministry of Education issued, at the end of 2020, an internal accord suspending all teachers reported or investigated for sexual assault and dismissing all teachers who have a conviction for the crime of rape or sexual assault committed in public educational spaces.
- The negation of a therapeutic abortion by Guatemala justice officials for a physically and intellectually disabled Indigenous girl who was raped and impregnated. Advances included: a medical report with a gender perspective and two psychiatric reports of the victim, her mother and son have been completed. A draft case document has been prepared for presentation to the UN Committee on the Rights of Persons with Disabilities.
- A case of irregular investigation by Guatemalan justice officials towards an Indigenous woman who was sexually abused. Advances included the identification and gathering of new evidence that were not previously included. Among them, psychological and psychiatric reports of the victim and an anthropological gender assessment with an ethno-cultural approach.
- A total of 450 justice actors (329 women and 121 men) received training related to these cases.
- The “Strengthening of Capacities of Justice Operators working on human trafficking cases against women and girls and other individuals in situation of vulnerability” project strengthens the capacity of justice operators working for state institutions specialized in trans-border crimes against women and girls with the goal of reducing impunity for these crimes in El Salvador, Guatemala and Honduras. Results in 2020 include: 1) A new video-conference room was equipped and inaugurated in Guatemala allowing Guatemalan courts and police investigation teams to hold 245 virtual hearings providing access to justice to women victims of human trafficking despite restrictions imposed in the context of the COVID-19 pandemic; 2). Sixteen new legal tools were created based on international standards linked to human trafficking cases; 3) Three hundred complaints were received for human trafficking. Of these, the Attorney General’s Office filed 37 indictments. The judiciary reported nine sentences and four resulted in convictions; A total of 12 workshops were given to 1870 (1236 Guatemalan) justice actors (1305 women and 565 men).
- The “Strengthening the Rights of Indigenous and other Discriminated Women in Guatemala” project includes a component on strategic litigation of cases of human rights violations against Guatemalan women through a grant to the United Nations Office of the High Commissioner for Human Rights (UNOHCHR) in Guatemala. Court proceedings for the case of 41 girls who were killed by a fire in a State-run home for children on March 8, 2017 were delayed due to the pandemic and are reprogrammed for later in 2021. OHCHR has continued to work on with the Child Welfare authorities on improved protection protocols. A total of 189 state authorities (136 women and 53 men) have participated in trainings on international human rights standards with a gender-based focus.
- The “Strengthening Criminal Investigations and Evidence Sharing in Central America” project bolsters the use of criminal intelligence analysis and surveillance skills. It also puts in place capacity building to share evidence and intelligence across borders in relation to human trafficking. In-person training, coaching and consulting with the justice sector institutions in Guatemala, Honduras and El Salvador was suspended during the reporting period due to the COVID-19 pandemic. A specialized team was hired to build an online learning platform and develop training materials that will be used in 2021 and beyond.
- The project “Strengthening the Central America Justice and Security Sector capacities to effectively prevent, identify and prosecute cybercrime, transnational organized crime and associated case work through digital evidence in Guatemala, El Salvador, Honduras, and Belize” worked with police and public ministry investigators to increase their capacity and equipment. Results for the period include: 1) A total of 19 trainings facilitated for Criminal Investigators, Analysists, Prosecutors and Judges of which 148 (64 women and 84 men) were from Guatemala; 2) Specialized equipment, software and technical assistance provided to improve the effective functioning of Cybercrime Units; 3) A total of 1062 Cybercrimes and Cyber-enabled crimes were investigated and prosecuted in Guatemala during the reporting period with 23 sentences delivered; 4) Trainings and webinars on cybercrime prevention were delivered with the Guatemalan Ministry of Education to 121 teachers (92 women and 29 men).
Challenges:
Externally, Judicial results depend on the courts and the willingness of justice actors to move cases forward and apply international human rights standards. Judicial independence has been an issue with independent judges receiving threats. The COVID-19 pandemic has compounded judicial backlogs and the number of cases presented and the number of condemnatory sentences has seen a decline. This however has not stopped implementing partners from advancing processes of evidence gathering, preparation of judicial arguments, institutional strengthening and capacity-building activities, policy development and advocacy work. Internally, the COVID-19 pandemic restrictions limited physical monitoring of projects and possibilities of trail observation.
18.2 Target: Canada increases women’s and girls’ access to justice and use of justice support services, particularly in cases related to SGBV.
Target achieved to date as of March 31, 2021: On track/Objective 2
- 1853 women and girls accessed gender-sensitive legal, psychological and other justice-related social services.
- The Embassy of Canada in Guatemala supported eight advocacy processes to raise awareness about the rights of women and girls to access justice.
Baseline:
- As of April 2017, Canada had no operational projects providing support services to women survivors of SGBV. Three new projects were in the design, planning and/or seeking approval stage to support this target.
Activity:
- Strengthen women’s and girls’ access to justice in cases of SGBV by providing gender-sensitive legal, psychological and other justice-related social services, and by raising public awareness on SGBV
Indicator:
- # of women and girls accessing gender-sensitive legal, psychological and other justice-related social services as part of Canadian programming initiatives
Completed Activities:
- Three projects are working directly with women and girls to provide gender sensitive legal, psychological, and other justice-related social services.
- Women’s Rights and Gender Sensitive Justice project [$6.15M, 2018-2022] (Bilateral Development)
- The Strengthening the Rights of Indigenous and other Discriminated Women in Guatemala project [$2.5M, 2018-2023] (Bilateral Development)
- Technological Platforms to Strengthen Public Responsibility and Citizen Participation project [$3.79M, 2017-2021] (Partnerships for Development Innovation).
- Embassy of Canada to Guatemala advocacy activities also supported women, especially Indigenous women in positioning their priorities, recognizing their work and facilitating their access to decision-makers.
Results and Progress:
Canada is supporting three projects that include components on providing women survivors of violence (and other human rights violations) with access to gender-sensitive legal, psychological and other justice-related social services.
In 2020-21 the implementing partners of the “Women’s Rights and Gender Sensitive Justice” project provided psychosocial support services to 534 Indigenous women and 96 mestizo women, legal accompaniment to 504 Indigenous women and 224 mestizo women and economic empowerment support to 495 Indigenous women victims of violence. Also, 497 men (community leaders, academics, social organizations) participated in a virtual process on positive masculinities to transform their relationship with women and girls.
The “Strengthening the Rights of Indigenous and other Discriminated Women in Guatemala” project provided psychological and legal support to the families of the 41 victims and 15 survivors of a fire in a State-run home for children. Three local women’s and human rights organizations received $14,000 each in 2019 to provide these specialized services to the victims/survivors. Two of the organizations received no-cost extensions due to the COVID-19 pandemic until late 2021. The other was able to fully implement the resources provided.
Canada also continued its support to the “Technological Platforms to Strengthen Public Responsibility and Citizen Participation” project to improve access to and the quality of, standardized services to crime victims - focusing particularly on women, children, minorities and vulnerable people who have been victims of violence. The project unifies the efforts of government institutions and civil society that provide services in Guatemala through a web portal for victims. In FY 2020/21 the project worked in close collaboration with the Public Prosecutor’s Victims Attention Department and civil society to finalize a website which was launched on March 24, 2021, (AYUDA.gt) with the participation of the Canadian Ambassador and Guatemalan Attorney General. This website provides information on how and where to denounce acts of violence, organizations that can support victims including Indigenous ancestral authorities, advice on how to protect oneself, an auto-evaluation of risk for violence and how others can help victims of violence. The event and content of AYUDA.gt site was covered by numerous local media outlets and a national campaign to direct people to the site was also launched. All site material has been translated into four Indigenous languages. A focus group of 134 people (87.3% women and 12.7% men) were consulted on the website pages and 84.3% positively rated the content. This project has also developed on-line self-directed courses for Public Ministry and Victim Services Network providers on how to improve service delivery for vulnerable victims of violence and is soon to launch a Web app which allows victims service professionals to securely access and add information to victim files from multiple technological devices, including their phones.
The Embassy of Canada to Guatemala has used a variety of advocacy tools to raise awareness about the rights of women and girls and especially Indigenous women and girls to access justice in a post-conflict society. These include:
- Continued support to a dialogue space for 25 Indigenous women leaders with senior officials leading to the signing of a Vice-Presidential Accord in October 2020 to create an independent advisory group of Indigenous women. This group is now autonomous and very active in dialogue and advocacy spaces.
- Participation of WPS Ambassador Jacqueline O’Neill in a virtual event to mark the 20th anniversary of UN Resolution 1325 with civil society organizations in Guatemala and Latin America on October 1.
- Organization of a meeting of women peace builders who contributed to the negotiations of the Guatemala Peace Accords, on March 25, 2021.
- Contracting of a Maya Mam man through the Embassy’s Indigenous Peoples Professional Experience Program to support programming and advocacy activities on Indigenous rights including a strong focus on Indigenous positive masculinities to reduce violence against women and girls.
- Organization of social media posts and coordinated advocacy actions during the 16 days of activism campaign around no violence against women, the Day of the Girl, the International Day of Women and the Day Against Human Trafficking.
- Leadership within the G13 Donor Coordination space on gender equality including coordination of the Gender Equality Working Group providing advocacy opportunities with State decision-makers.
- Participation in the international donor group on transitional justice cases and advocacy around key cases.
Challenges:
Externally, the COVID-19 pandemic made traditional service delivery much more difficult for partner organizations. The first months of the fiscal year were spent making adjustments to on-line services or preparing the sanitary conditions to be able to provide in-person services in some cases reducing the number of beneficiaries. Internally, the Embassy team was at approximately 60% staffing capacity during most of the year due to the departure of several Canada-Based Staff in the context of the COVID-19 pandemic evacuations and the vacancies of numerous Locally-Engaged Staff positions. This combined with travel and meeting restrictions and time spent on addressing the humanitarian situation made it difficult to conduct advocacy activities although many creative virtual and/or social distanced activities were achieved.
Priorities: Promote respect for women’s and girls’ human rights in Guatemala
18.3 Target: Canada increases the knowledge and exercise of women’s and girls’ human rights, including SRHR.
Target achieved to date as of March 31, 2021: On track/Objective 3
- 14,002 women and girls exercised their rights to justice, services, economic empowerment and humanitarian assistance.
- The Embassy of Canada in Guatemala supported three bilateral development projects fully integrating gender equality.
Baseline:
- As of April 2017, Canada had two operational small initiatives working on SGBV and one operational multilateral project on SRHR. Four new projects were in the design, planning and/or seeking approval stage to support this target.
Activity:
- Support national and grassroots women’s organizations in the promotion, protection and respect for women’s and girls’ rights, especially those related to SGBV and SRHR
Indicator:
- # of women and girls exercising their rights, along with and types of actions taken (e.g. legal, advocacy to exercise these rights)
- # of projects that significantly or fully integrate GE are implemented
Completed Activities:
- There were 3 operational projects working directly with women and girls, survivors of sexual and gender-based violence, the national and grassroots women’s and human rights organizations that support them and other Indigenous women defending their rights including sexual and reproductive rights. Additionally, several Canada Fund for Local Initiatives projects significantly integrated gender equality.
- More than 14,000 women, mostly Indigenous women and girls, have increased their knowledge of their rights and were participating actively in legal and advocacy work, humanitarian response, and economic recovery actions to advance those rights in 2020-21.
Results and Progress:
The “Women’s Rights and Gender Sensitive Justice” project includes components on training and accompaniment of women and the local women’s organizations that support them as well as community leaders, to exercise their rights. In 2020-21, 229 activities on sexual and gender-based violence (SGBV) directly reached 4,320 people (of which 3,264 are women and girls and 484 are men and youth), the majority of whom are Indigenous. In addition, communication campaigns carried out by the partner organizations on SGBV reached more than 540,000 people. Eighty-three Indigenous ancestral authorities in alliance with 225 Indigenous midwives attended 44 cases of SGBV in the department of Sololá putting into practice training models received.
Through the “Strengthening the Rights of Indigenous and other Discriminated Women in Guatemala” project, a total of 213 women participated directly in strategic litigation processes. These women represented a broader membership of their organizations of more than 17,000 women in Guatemala, most of whom are Indigenous. Of these 142 women have received training in 2020-21 on international human rights norms and standards. The women have actively participated in the elaboration of strategies, proposals and plans to advance their cases. Indigenous women weavers prepared a legislative proposal, consulted amply among their network and sought technical support from the UN organization responsible for collective intellectual property. Indigenous midwives negotiated with health authorities who released an Action Plan 2021-2025 for the National Midwives Policy of the Four Peoples of Guatemala which was made public in January 2021. Additionally, 15 survivors and 71 family members of the 41 girls who died in a fire in a State-run children’s home have participated in the preparations of court proceedings and negotiations with State authorities to ensure non-repetition and improved conditions in State facilities.
Women’s Voice and Leadership [$2M, 2019-2023] project began implementation during the pandemic and is working with a grassroots umbrella Indigenous women’s network, Tz´ununija. The project is supporting 20 Indigenous women’s organizations representing approximately 2,400 participants. Tz´ununija´ is working to establish bridges for dialogue and advocacy with local governments and with justice officials to adopt differentiated protocols for Indigenous women to address racism and discrimination. In 2020-21, eight Indigenous women rights organizations have improved their governance and management practices. A total of 14 women from Indigenous women’s rights organizations are now participating in decision-making spaces at the community, municipal, departmental or national levels.
Strong efforts were made to include a better use of the gender-based analysis guide in the Canada Fund for Local Initiatives (CFLI) in 2020-21. Information on the meaning of GBA Plus was shared with potential beneficiaries from the beginning, to ensure it was integral part of project planning cycles. Beneficiaries understood the concept better, which led to projects with greater social, cultural and gender relevance. The positive results are consistent with what was initially stated in the proposals, positioning gender as the central point of inclusive development. (See story www.guatemala.gc.ca) Regular CFLI projects included the participation of 113 women and 2314 girls that were mostly focused on economic empowerment. Humanitarian projects responding to two hurricanes supported 8069 Indigenous women providing them with personal care and hygiene kits, food supplies, recovery of their civil documents and culturally pertinent clothing that is essential to their identify and personal wellbeing. COVID-19 projects supported 4076 frontline health workers with biosecurity supplies.
Challenges:
Externally, the COVID-19 pandemic was a challenge throughout the year for women and girls to actively participate in trainings and human rights actions due to mobility restrictions and economic hardships. Most partners found virtual options to support processes but many also engaged participation locally with socially distanced activities. Internally, Embassy resources were stretched and funding priorities focused primarily on addressing the COVID-19 pandemic and response to two hurricanes that caused loss of life and heavy damage in the country’s poorest department of Alta Verapaz.
19. Haiti
Context: Despite the absence of conflict, Haiti remains a fragile state marked by weak institutions, political volatility, control of the economy by a handful of private interests, and vulnerability to natural disasters and external shocks.
Addressing issues relating to women’s rights, GE, and women's participation in decision-making spheres is a stark challenge within Haitian society. The promotion, protection and respect for the human rights of women and girls and for issues relating to WPS take on special importance in this context, and will be an important part of Canada’s development programming in Haiti in each of its priority sectors. In this context, Canada will continue its efforts to strengthen:
- Women’s socio economic empowerment through economic and civic engagement of women in decision-making spheres;
- Women and girls’ sexual rights, and access to sexual and reproductive health and education services; and
- The promotion and safeguarding of the human rights of women and girls and will take special measure to protect them from SGBV.
As women and girls play a key role in their communities’ development, the programs’ and projects’ focus on those priorities (i.e. ongoing projects and planned projects that will be submitted for approval) will help to improve the economic, social and political well-being of women and girls so that they can fully play their role in the Haitian society. Canada will promote and support the empowerment of women in meaningful decision-making spheres and will develop specific initiatives for the promotion and protection of and respect for the rights of women and girls
Canada will continue to foster sectoral initiatives in which GE will be strongly integrated, and will also engage in a policy dialogue with the government of Haiti, Haitian civil society (especially women’s organizations), and the donor community, on the rights of women and girls, chiefly in the three priorities mentioned above. The Haitian state has a weak capacity to address SGBV, Canada thus supports initiatives that address SGBV issues and that encourage the presence of women in decision-making platforms relating to such issues. The achievement of objectives associated with these priorities depends in large part on the approval of projects currently in the planning stage. The following indicators, baselines and targets will be considered, and further indicators, baselines and targets will also be provided following consultations with civil society. Moreover, efforts will be undertaken to identify these indicators, baselines and targets and ensure their measurability.
Furthermore, Canada, through its PSOPs, will engage in efforts designed to strengthen Haiti’s public governance institutions in the security and justice sectors and proactively target violence prevention efforts to effectively enforce security and protect the human rights of its citizens. For example, PSOPs will support the engagement and participation of women/girls at all levels of decision-making; prevent VAW/girls and promote women’s rights; provide gender-sensitive training; and give women and girls access to and control over resources.
Priorities: Women’s socio-economic empowerment through economic and civic engagement of women in decision-making spheres
19.1 Targets:
- Canada supports local women’s rights organizations and movements;
- Canada helps to increase the number of women who engage in political life; and
- Canada helps to promote and support the empowerment of women and girls, including by increasing women’s political, social and economic empowerment
Target achieved to date as of March 31, 2021: Mostly on track/19.1.1, 19.1.2, 19.1.3/ Objective 1, 3 and 3
- A total of 18 women's organizations were able to improve their governance and management structures so that they could better serve their target audiences. As a result, 23,083 women were able to better understand their rights through the actions of our partners.
- Thanks to Canada's support, several activities carried out during the 16 Days of Activism, such as talks on violence against women, awareness campaigns and ceremonies to honour women and girls who were victims of femicide, enabled the participation of 42 women's organizations and 2,899 people, including 1,859 women.
- In terms of economic empowerment of women and girls, out of 6 projects operational during this year, we are only able to report on one project for which the target was reached (AVETI). Concerning the 5 other projects in this area, several activities have been greatly delayed due to delays in the approval of the implementation plan or because of the insecurity or the COVID-19 pandemic. It is currently too early to comment on their results.
Baseline:
- Capacities of Haitian CSO are weak; women’s political engagement is low. Currently, only 4 out of 148 parliamentarians are women.
Activities:
- Support and coach women’s organizations, state and local authorities in order to strengthen women’s access to positions of accountability and decision-making in the public and political spheres
- Promote and support the rights of women and girls, including through the political, social and economic empowerment of women and girls, with a special focus on sexual and GBV, as well as SRHR
- Build the capacity of government agencies, civil society and private-sector organizations and foster initiatives that will support women in decision-making forums (national and local governments, school boards, health boards, Police, etc.)
- Coach and build the capacity of women entrepreneurs and their organizations, including in the agriculture and business sectors; support technical and vocational training for women and teenage girls.
- Promote the economic empowerment of women and youth, not only at the production level, but also at the processing and marketing levels in different agricultural value chains.
- Training and technical guidance activities, as well as access to credit, capital and inputs
Indicator:
- # of women’s advocacy organizations with strengthened capacities
- Perception of the level of engagement of women and women’s organizations in political life
- Proportion of women involved in local and national governance
- Proportion of women involved in agricultural value chains activities
- #of women entrepreneurs, farmers and smallholders provided with financial and/or business development services through GAC-funded projects
Completed Activities:
- Support and mentor women's organizations as well as state and local authorities to increase women's access to leadership and decision-making positions in the public and political spheres.
- Promote and support women's and girls' rights, including political, social and economic empowerment, with a particular focus on sexual and gender-based violence (GBV) and SRHR.
- Build the capacity of government agencies, civil society organizations, and private sector organizations, and promote initiatives to support women in decision-making forums (national and local governments, school boards, health boards, police, etc.).
- Mentor and build the capacity of women entrepreneurs and their organizations, particularly in the agricultural and business sectors; support technical and vocational training for women and adolescent girls.
- Promote economic empowerment of women and youth, not only at the production level, but also at the processing and marketing level in different agricultural value chains.
- To provide training and technical guidance, as well as access to credit, capital and inputs.
Results and Progress:
19.1.1:
- Notwithstanding the constraints arising from the socio-political crisis and the spread of the COVID-19 pandemic in Haiti, the Women's Voice and Leadership project ($8.3M, 2018-23) has supported 18 local women's rights organizations to strengthen their governance and financial structures, in addition to improving their service delivery to the target population. Canada's financial support has enabled the project over the past year to fund the acquisition of office equipment, including internet and alternative energy sources to strengthen the management and sustainability of local women's organizations. The project has also supported the strengthening of service delivery, including staffing to provide psychological, legal, and medical support, as well as improving spaces for survivor care, such as reception and shelter spaces.
- Although it is still too early to see behavioral or skill changes in the target population, outreach efforts-including awareness training-by women's organizations have increased community knowledge building on women's rights and gender equality. For the reporting period, 4 organizations demonstrate increased capacity in governance and management and 9 organizations have been able to expand the reach of their program in terms of service delivery.
- However, the project faced some challenges in its second year of implementation, including socio-political and security insecurity, as well as the COVID-19 pandemic, which impacted the progress of activities, particularly the selection of partner organizations, which was slowed down. To better respond to the health crisis, some organizations decided to implement new activities, including the distribution of medical kits, while others organized awareness campaigns.
19.1.2:
- As part of the Support for Local and Inclusive Governance in Haiti project ($15.57M, 2018-24), 20 women civil society leaders were prepared to actively participate in consultations on reforms related to territorial governance. This initiative thus normalized female participation in territorial politics in addition to training and sensitizing 145 men to accept and support women's participation in territorial politics.
19.1.3:
- Through its support to the Climate Adaptation and Economic Valorization of Agricultural Chains in Haiti project ($13M, 2019-24), Canada has provided increased access to women for entrepreneurial development and managerial capacity in targeted value chains, including processing and marketing.
An increase in the number and quality of more women-friendly services by financial institutions has been noted over the past year. 272 women have been sensitized to access financial products and services; 30% of women on the committees of 9 enterprises and 43% of women (total of 208 members) have benefited from financial services; 51.6% of women (total of 902 members) are members of the management committees of the Village Associations and credit savings.
Priorities: Support women’s and girls’ access to health services, including for sexuality and reproduction, and education
19.2 Target:
- Canada helps to build the capacity of health institutions to take care of women and girl survivors of sexual violence and exploitation;
- Canada increases the level of knowledge on the part of women, girls and communities related to reproductive and sexual health and associated rights.
- Canada contributes to increasing the net secondary enrolment rate for girls.
Target achieved to date as of March 31, 2021: Mostly on track/ 19.2.1, 19.2.2/ Objective 3; Too early to report/19.2.3/ Objective 3
19.2.1 and 19.2.2:
- Despite the various challenges encountered, the sexual and reproductive health projects were able to mitigate some of them by focusing on activities such as the training of multipurpose community health workers and student midwives, and the admission and treatment of children with severe acute malnutrition.
- 30 adolescents (15 girls and 15 boys) were trained on responsible sexuality, the right to sexual and reproductive health and the promotion of gender equality; 35 boys and men on positive masculinity, sexual and reproductive health and gender-based violence; and 24 new multipurpose community health workers (9 women and 15 men) on the promotion of gender equality in their training curriculum.
- The PRISMA II project enabled 2,464 pregnant women to benefit from economic support measures implemented in conjunction with women's organizations.
- Projects in this area have also helped strengthen the governance of the 10 government health structures.
19.2.3:
- At this point, it is too early to report on the net enrollment rate of girls in high school since the annual report is submitted in September to allow for data collection and analysis during the school vacations. As this is the first year of implementation with virtually no interruptions other than a November start and a two-week premature end of the year, the data that will be presented will be particularly important as it will indicate whether the project is on track.
Baseline:
- Weak capacity of health care and education institutions; Weak level of knowledge on the part of women, girls and communities related to reproductive and sexual health and associated rights. The net secondary enrolment rate for girls is 16.5% (2015-2016).
Activities:
- Support health care institutions in offering better-quality services, especially for reproductive and sexual health, and prevention and empowerment for women and girl victims of sexual violence and exploitation
- Support the public education sector in improving access to school and school feeding, and inclusive education services to foster student retention and success, especially for girls
Indicator:
- Level of capacities of health care institutions to provide care for women and girl survivors of sexual violence
- Level of knowledge on the part of women, girls and communities related to reproductive and sexual health and associated rights
- # of GE and women rights capacity-building programs delivered to government education officials and school personnel
- Net secondary enrolment rate for girls
Completed Activities:
- Public school teachers and principals have received in-house training on gender issues.
- Public schools have established girls', boys' and parents' clubs to raise awareness about gender-based violence, sexual and reproductive health and rights.
- Completion of baseline data collection in schools.
- Launch of the Alo Saj Fanm platform which has reached more than 50,000 households.
- Implementation of economic support measures for more than 2,464 pregnant women.
- Training in strengthening gender equality and sexual and reproductive rights for women and girls.
Results and Progress:
19.2.1:
- Despite the socio-political insecurity and health restrictions imposed by the authorities during the COVID-19 pandemic in Haiti, progress has been observed in the PRISMA II and Saj Fanm pou Fanm projects. The first project progressed to more than 75.4% of the targeted level, despite insecurity on the roads, which caused a decrease in delivery services (2,572 institutional deliveries out of 3,416 targeted, down from 2019-20 (3,228) and 2018-19 (3,571) results). The second project was able to mitigate the risks through pre-positioning of equipment in the regions for continuity of care services. The number of institutional deliveries in the areas covered (Grande Anse, South-East, Nippes and North-West) by this project increased from 14,607 to 32,743, while last year's increase was from 13,709 to 14,607.
19.2.2:
- In the framework of the Saj Fanm for Fanm project, the consultations planned for ongoing community involvement in respecting the rights of women and girls could not take place, as a result of the COVID-19 pandemic, which limited field mobility. On the other hand, the establishment and launch of the Alo Saj Fanm platform promoted the profession and managed to reach 50,000 households. This platform also allowed families, especially women and girls, to communicate and interact directly with midwives for reliable guidance and information on sexual and reproductive health - including family planning - in Creole.
19.2.3:
- At this time, it is not possible to report on this target as the data is being analyzed and will be presented in the Girls' Access to Secondary School annual project report in September 2021. In February, the World Bank (WB) presented a semi-annual report on its activities, partly funded by Canada. These activities took place in a context of socio-political instability and the COVID-19 pandemic, which repeatedly shifted the start of the school year and reduced the number of days in the school calendar. This affected school retention and attendance, in addition to slowing down the collection of baseline data, which is essential for reporting on results. Despite the postponement of the start of the school year to November 2020, as the previous school year ended in October, this report shows considerable progress. Indeed, 388 schools (202 public schools, 126 non-public schools and 60 community schools) have been able to carry out activities related to school achievement, including technical assistance, training of teachers and principals and delivery of school kits and textbooks.
- The numerous constraints experienced by the project due to socio-political instability and the health crisis forced the WB team, in agreement with the Ministry of National Education and Professional Training (MENFP), to adjust their interventions in order to better respond to the observed needs. The precariousness of Haitian households (decrease in economic activities, increase in the cost of living and reduced access to basic services and commodities) has led to a decrease in school attendance and therefore a problem of school retention. As a result, GAC and the WB have discussed revising certain activities and increasing the number of beneficiaries and schools for the 2021-22 school year.
Priorities: Promote and protect the human rights of women and girls, their access to justice and security, and take special measures to protect them from SGBV
19.3 Targets:
- Promote and safeguard the human rights of women and girls and take special measures to protect them from sexual and GBV;
- Canada supports Haitian institutions and civil society to address SGBV issues; and
- Canada supports the improvement of the legal framework for women, particularly with regard to the protection of women, girls and boys from SGBV.
Target achieved to date as of March 31, 2021: Mostly on track/ 19.3.1, 19.3.2, 9.3.3 / Objective 3
- Despite the fragile context of the recent year, in consideration of the health crisis and a difficult socio-political context for several years, the Women's Voice and Leadership project has made progress in its implementation. It has helped a growing number of women's organizations improve their governance and service delivery structures, enabling them to better serve their target audiences with higher quality programs.
- This second year of the project was marked by increased communications from partner women's organizations both through social networks and in their communities of intervention. This has contributed to the strengthening of women's awareness of the fact that the violence they suffer is an attack on their rights and physical integrity. Many beneficiary organizations have organized awareness campaigns, training sessions and panel discussions to better inform the population about women's rights. For the reporting period, the number of direct beneficiaries of the project was 26,410, of which 23,083 were women (87.4%) and 3,327 men (12.6%).
- Through the Access to Justice and the Fight against Impunity in Haiti project, 688 people (246 women and 91 minors) also received legal assistance. 239 were assisted by partner civil society organizations and 449 others by lawyers recruited by the project. The latter enabled the arrest, following legal proceedings, of the aggressors of 40 women and girls who were victims of assault, rape and breach of trust. Six lawyers (2 women and 4 men) have become trainers in strategic litigation, gender-based violence and the use of international mechanisms for cases of human rights violations.
- On the occasion of the 16 Days of Activism against Gender Violence, hundreds of people were sensitized to the prevention of gender-based violence through the Essential Conversations activity, jointly organized by the Canadian Embassy and civil society organizations partners of the AJULIH project.
Baseline:
- Ability of the Haitian state to address SGBV is low. Haitian legislations protecting women from sexual harassment, domestic violence and sexual violence in several sectors are lacking.
Activity:
- Coach and build the capacity of human rights advocacy organizations (including women’s organizations), and justice sector actors (lawyers, Ombudsman’s office -OPC, etc.) to document human rights violations and advocate for human rights, especially for women and children.
- Support legal identification and protection for Haitian migrants on the border with the Dominican Republic and the safe relocation of Haitian families displaced by the 2010 earthquake, chiefly women and children.
- Support protection for minors in domestic service and in prison and the prevention of child domestic labour.
- Build the capacity of the Haitian National Police Force to counter SGBV.
Indicator:
- # of special measures and safeguards for women and girls towards SGBV issues; and
- # pieces of legislation proposed, passed or seconded addressing the issues of women and girls’ human rights and SGBV
Completed Activities:
- Support for human rights organizations (including women's organizations) and justice sector actors (lawyers, Office de la protection du citoyen, etc.) to strengthen their capacity to document and defend human rights violations, particularly for women and children.
- Providing care for victims of sexual and psychological harassment and abuse in shelters offered by several women's organizations.
- Offered workshops and training courses on economic empowerment, sexual and reproductive health, child protection and gender-based violence.
- Launched awareness campaigns, including radio broadcasts and the production of awareness panels on women's rights.
Results and Progress:
19.3.1: In 2020-21, the Women's Voices and Leadership project ($8.3 million, 2018-23) helped promote and protect the human rights of women and girls by improving the delivery of quality services by local organizations and the effectiveness of women's rights platforms, networks, and alliances. With funding from Canada, the project was able to provide financial support to partners to carry out awareness-raising and training activities on women's rights as well as to improve services on gender-based violence through the provision of support staff, including psychologists, lawyers and nurses. Two organizations were able to provide shelter to women and girls who were victims of violence, while others were able to provide care to more than 500 women and girls who had suffered physical, sexual and psychological violence.
However, this project faced a difficult collaboration with the Ministry of Women's Affairs and Women's Rights (MCFDF), which required the project to dedicate a portion of its funds to the institutional strengthening of the Ministry, even though according to the project's terms of reference, GAC cannot directly fund a foreign ministry. Although the impact on project activities has been minimal, collaboration with MCFDF could deteriorate further if no agreement can be identified.
19.3.2: Supported by Canada, the Access to Justice and the Fight against Impunity in Haiti (AJULIH) project ($18.16M, 2017-23) fights against impunity for violence against women and girls by contributing to the improvement of judicial processing of gender-based violence cases. Supporting the l’Office de la Protection du citoyen (OPC), the AJULIH project aims to make the Institution's services more accessible by improving the reception and processing of complaints. A free telephone line that provided legal assistance to 417 people (252 women, 35 men and 130 minors). 688 people (246 women and 91 minors) also benefited from legal assistance, of which 239 were assisted by partner civil society organizations and 449 by lawyers recruited by the project. The latter have enabled the arrest, following legal proceedings, of the aggressors of 40 women and girls who were victims of assault, rape and breach of trust.
However, there are some challenges to be mentioned, notably the difficult security context and the numerous health restrictions put in place to fight against the COVID-19 pandemic, which have created difficulties in the continuity of the offer of proximity services in all the departments of the country. The contract of the project coordinator within the OPC was not renewed in September 2020 due to insufficient results. The coordinator was not replaced until January 2021. Recruitment, retention and evaluation of staff are important issues in this institution.
19.3.3: The AJULIH project also supported 14 partner civil society organizations in the development of an advocacy plan on the preventive and arbitrary detention of women, including 6 women's and/or feminist organizations (KRIFA, MOUFED, Fanm Deside, Konbit Fanm Leve, AFASDA and OFSA).
Priorities: Mainstream WPS and gender into peace and security efforts in Haiti
19.4 Target: Canada, through PSOPs, demonstrates support for women’s increased and meaningful participation in improving peace and security in Haiti by ensuring that WPS and gender are integrated in 80% of projects.
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Objective 3
- 4 out of 5 or (80%) of PSOPs projects in Haiti integrated GE considerations (GE01 and GE02 levels).
- 1 out of 5 or (20%) of PSOPs projects in Haiti explicitly targeted GE (GE03 level).
Baseline:
- In the FY 2016/17, there were 2 (50%) projects that supported women to participate in improving peace and stability in Haiti. The 2 projects integrated WPS considerations in the logic model and performance measurement frameworks.Footnote 13
Activity:
- Encourage the inclusion of gender-based results in project design and promote gender budgeting
- Ensure that WPS and/or gender perspectives are reflected in new PSOPs projects
Indicator:
- # and % of PSOPs projects in Haiti that integrate GE considerations (GE01 and GE02 levels)
- and % of PSOPs projects in Haiti that explicitly target GE (GE03 level)
Completed Activities:
In Haiti, PSOPs' continues to encourage the inclusion of gender-based results in project designs, to ensure that WPS and/or gender perspectives are reflected in new projects, and to support women's increased participation in improving peace and security in the country. For examples, PSOPs provided support to:
- Mercy Corps to help address youth and gang violence in Haiti by engaging and empowering girls, boys, and young adults to have a voice in community decision-making.
- CowaterSogema to increase the number of women police officers within the Haitian National Police, thereby contributing to improving security and peace in the country, and advancing intervention practices and the policing and security culture in Haiti.
- IOM to strengthen the Haitian Border Police's capacity to recognize the specific rights and needs of migrants, with significant integration of gender-equality and WPS considerations.
Results and Progress:
PSOPs partnered with Mercy Corp for a project entitled “Improving Security in Haiti through Relationship Building in the Community” which helped increased the participation of women in restorative justice activities and mediation processes. In this project, women play an essential role as mediators in conflict situations, and this approach ensures that the skills and perspectives of women are actively capitalized upon in mediating conflicts at community level. Mercy Corps made a concerted effort to involve women from the communities of Arcahaie and Miragoâne in the restorative justice process and as a result, 33% of trained Community Peace Officers were women (9F,18M) who played an important role in conflict mediation, and actively participated in conflict resolutions processes in the communities.
PSOPS also supported the International Organization for Migration (IOM) to strengthen the Haitian Border Police’s capacity to enforce security and to recognize the specific rights and needs of migrants, including girls, women, and vulnerable individuals. Sensitizing Haitian Border Police on key border management and protection issues from a gendered perspective contributed to their increased understanding of migrants’ rights and international standards. As such, the rights of vulnerable migrants, victims of criminal acts/human rights abuses and/or victims of trafficking, etc. - especially women and children- has been enhanced through increased access to protection mechanisms through referral to the Border Resource Centres (BRC), as well as other available social and governmental services. IOM, in collaboration with UN Women, also organized a training series on prevention and response to GBV for the Haitian Border Police agents; 38 participants benefited from the training, including 23 women (61%).
The project “Improving the Integration of Women in the Haitian National Police” with CowaterSogema was launched in October 2020. This PSOPs project aims to increase the number of women police officers within the Haitian National Police (HNP), and allow 200 young women, primarily from at-risk areas where violence and insecurity are prevalent, to contribute to the country’s peace and security efforts. The project also works to contribute to advancing intervention practices and the policing and security culture in Haiti by integrating more women into its police forces. This project was designed specifically to eliminate gender inequalities and empower women and girls, and has results and targets focused on gender equality and on women, peace and security.
Challenges:
COVID-19: Haiti is a beneficiary of the COVAX program, and the distribution of the first doses of the COVID-19 vaccine is expected to begin at the end of July 2021. The pandemic had a significant impact on all PSOPs’ projects, given that project recipients had to review and adapt the implementation of their activities to take into account measures required to operate during the COVID-19 pandemic, resulting in some delay to the implementation of some projects’ activities.
Security: More than 100 armed groups have been identified in Haiti. The most active are those in the capital city Port-au-Prince, and control the entry points. In addition, during the last quarter of 2020 Haiti saw a 200% increase in kidnappings that created a general sense of insecurity in the population, especially when moving between areas of Port-au-Prince.
Political situation: For more than a year, Haiti has been without a parliament due to a failure to hold elections for all levels of government, provoking demonstrations, mostly violent, that take place regularly to protest this situation. The political unrest has led to repeated protests, and road blocks, it was therefore sometimes difficult to adhere to the projects’ initially planned implementation schedule.
Economy: In the last quarter of 2020, the Haitian Government injected $36 M USD into the Haitian economy to stabilize exchange rates. As a result, the Gourde appreciated by more than 200% in just three months. This left some PSOPs’ partners, peer organizations, and USD-based economies with considerable financial implications to ensure contractual obligations were respected with less functional liquidity. Over the course of the past months, the Haitian Gourde has gradually re-depreciated, indicating a slowly stabilizing situation.
20. Colombia
Context: Colombia’s internal armed conflict with the Revolutionary Armed Forces of Colombia (FARC) was the longest running armed conflict in the Americas. It killed over 220,000 people; displaced more than 7.1 million and resulted in 60,000 disappearances. Although there is no official data, it is estimated that at least 500,000 women were targeted with sexual violence. Colombia has the second highest number of landmine victims in the world (after Afghanistan), and Colombians have suffered grave human rights violations and destabilization in rural areas. In 2016, the Government of Colombia and the FARC signed a peace agreement that ended over 50 years of internal armed conflict. The implementation of this agreement brings great opportunities for Colombia. However, challenges remain related to violence at the hands of other armed and guerilla groups, criminality, poverty, corruption, and human rights abuses, including an increase in the number of assassinations of human rights defenders (343 people between January 2017 and August 2018). The peace agreement with FARC includes specific provisions related to: advancing women’s rights to rural economic development and political participation; illicit drugs; victims’ assistance; and demobilization, disarmament and reintegration of former combatants. Canada is supporting these efforts.
Canada has a strong record of advancing GE, human rights and empowerment of women and girls in Colombia through international assistance, the CFLI, and PSOPs programming. In 2016, Canada announced $78 million in funding for initiatives to support Colombia’s peace implementation, including $20 million to the UN Multi-Partner Trust Fund for Post-Conflict in Colombia. This programming aims to empower women as agents of peace. Investments in rural development are supporting women’s increased and meaningful participation, including as decision-makers, in rural cooperatives and associations; as well as enabling equal access to and control over resources such as credit, infrastructure and land. Canadian supported initiatives acknowledge and address the differential impact of conflict on women and girls, and analyze the factors that support women to succeed in the marketplace and increase their skills, which is important in the post-conflict context. Canada also focused on education and youth programming to protect Colombian children and youth (particularly girls) from violence, exploitation and abuse. This work is supporting efforts to transform unequal gender relations among youth in conflict zones, and create educational opportunities for vulnerable girls and teenage mothers. In 2017-2018, Canada chaired Colombia’s International Cooperation Gender Coordination Group, coordinating the efforts of more than 40 organizations to advocate and advance GE and women's rights in Colombia. The Group has been instrumental in promoting the participation of women in Colombia’s peace negotiations.
Priorities: Support the increased and meaningful participation of women in peacebuilding, recovery and conflict resolution
20.1 Target: Canada increases the capacity of women engaged in peacebuilding, recovery and conflict resolution activities.
Target achieved to date as of March 31, 2021: Mostly on track/Objective 1
- 3 gender-sensitive initiatives supported the increasing meaningful participation of women and girls in peacebuilding, recovery and conflict resolution, as well as reintegrated women combatants.
- To note that numbers appear to have dropped because the projects funded under the UN MPTF are now funded by PSOPs and not through the Bogota Development program at the Canadian Mission. They are now reported through PSOPs own target for Columbia. See Target 20.4 below.
- Ten operational PSOPs projects in 2020 strengthened the participation, leadership and empowerment of women and women's organizations in peace building, recovery and conflict resolution.
Baseline:
- In FY 2016/17, Canada’s development program in Colombia supported two gender sensitive initiatives that increased meaningful participation of women and girls in peacebuilding, recovery and conflict resolution, as well as the reintegration of women combatants.
Activity:
- Fund projects/activities that support and strengthen the participation, leadership and empowerment of women and women's organizations in peace building, recovery and conflict resolution as well as the reintegration of women combatants
Indicator:
- # of gender sensitive initiatives that support increased and meaningful participation of women and girls in peacebuilding, recovery and conflict resolution as well as the reintegration of women combatants
Completed Activities:
- Provided mine risk education to populations, including indigenous communities in indigenous languages, living in mine affected zones and supported the work of demining teams.
- Supported the political and economic development of Colombia’s rural, conflict-affected regions also focused on women’s leadership and empowerment.
- Please see significant UN-MPTF projects reported separately under target 20.4.
- Twenty initiatives implemented by civil society organizations through the UN Multi-Partner Trust Fund (MPTF) that promote peaceful coexistence and reconciliation between community members and ex-combatants, benefitting 615 women and 886 men.
- Through our contribution to the MPTF, Canada’s funding supported the launch of a call for proposals that specifically focused on women and girls’ empowerment and leadership in promoting peace in Colombia. In total, 42 projects were supported, 17 of which were implemented by women’s organizations.
- Twenty civil society led initiatives were supported with the main purpose of promoting reconciliation between communities and former combatants in the territories, in which the beneficiaries were 615 women and 886 men.
- Through the project “Promoting Inclusion and the Rights and Participation of LGBTI Victims of the Armed Conflict in Colombia”, Canada funded three Colombian lesbian and trans organizations to promote LGBTI equality and local-level peacebuilding.
Results and Progress:
All PSOPs projects in Colombia were implemented in a gender-responsive manner, taking into account the needs of women and working to strengthen their capacities.
- The Organization of American State’s Mission to Support the Peace Process (MAPP) in Colombia monitored and reported on security contexts throughout the country, including the impacts on women and girls of different ethnicities in conflict-affected regions of the country. They engaged and supported women from conflict-affected regions to voice their concerns, advocated with authorities for their rights in the implementation of the peace agreement, and strengthened the capacities of women and men in leadership positions to better integrate gender considerations into their peacebuilding work.
- Through the Multi Partner Trust Fund (MPTF) for Colombia, PSOPs supported projects that contributed to women’s rights in terms of recovery, participation in peace and reconciliation activities and access to programs established through the Peace Agreement, such as the National Comprehensive Program for the Substitution of Illicit Crops.
- Through the project “From Conflict Actors to Architects of Peace: Promoting Security and Development across Borders” Canada supported the voices of women leaders from Colombia’s isolated borderland communities to engage with national level policy-makers from the security and humanitarian sectors to voice their concerns regarding the conflict dynamics affecting them in their regions.
Challenges:
Some delays occurred in transitioning activities to the virtual space in the context of the COVID-19 pandemic mobility restrictions, which consequently resulted in lapses for some projects. Connectivity issues with participants (women and men) from isolated regions posed some challenges to effective and smooth participation in project activities. The COVID-19 pandemic mobility restrictions (imposed by both State and non-state actors) also resulted in increased threats, violence and assassinations of both women and men social leaders and human rights defenders, and reduced abilities for victims to access services. Reports indicate increased domestic violence and SGBV against women and LGBTI populations.
Priorities: Enhance access to justice, compensation services and protection for women and girls
20.2 Target: Canada enhances access to justice, protection and compensation services for women and girls survivors of violence caused by the conflict.
Target achieved to date as of March 31, 2021: On track/Objective 3
- PSOPs supported four projects that included activities that supported women and girl victims of the conflict, including lesbian and trans women, in contributing to and accessing Colombia’s transitional justice mechanism.
- PSOPs supported three projects that include activities that focus on protecting women and girls, including Indigenous women and girls, residing in conflict-affected regions of Colombia.
Baseline:
- In 2016/17, Canada’s bilateral development program in Colombia supported three projects that promoted women’s and girls’ access to victims’ services in conflict-affected areas.
Activity:
- Fund projects/activities that support the Government of Colombia’s delivery of justice, protection and compensation services for women and girls
- Continue to support legal assistance for women and girls survivors in order to obtain reparations/ compensation and access to justice (e.g. transitional justice)
Indicator:
- # of projects/ activities that promote women’s and girls’ access to victims’ services in conflict-affected areas
Completed Activities:
- Thirty civil servants from the Colombian security, justice and social services sector, including 27 women and 3 men, were trained on protection mechanisms; women and girls’ human rights; and the inter-relations between the Indigenous law system and the Colombian law system.
- Ninety-nine early warning system alerts were emitted in response to risks of violence to vulnerable communities, of which 70% of which were Indigenous communities, 50% Afro-descendant communities, and 71% were women.
- 484 Indigenous women and 336 Indigenous men participated Colombian Truth Commission-led activities that focused on recognition of crimes carried out against Indigenous people in the context of the Government of Colombia’s conflict with the Revolutionary Armed Forces of Colombia (FARC).
- Fourteen technical assistance meetings were carried out between LGBTI civil society organizations and transitional justice institutions with the aim of sensitizing the institutions and promoting techniques to ensure that the work of the transitional justice institutions takes into account the experiences of LGBTI victims of the conflict.
- One cross-stakeholder event facilitated between civil society organizations from marginalized Colombian border regions and national-level policy-makers took place and focused on security concerns and conflict dynamics in border regions.
- Fifty women from conflict-affected regions of Colombia were sensitized on how to participate in transitional justice mechanisms.
- Pro bono legal representation was provided for 10 women and girl victims of the conflict in presenting emblematic cases of SGBV before the Special Jurisdiction for Peace.
- Mine risk education was delivered to 1555 women and girls and 1833 men and boys from municipalities with risks of landmine accidents and where military demining is occurring.to guarantee girls’ and boys’ rights in transitional justice and truth-seeking processes.
Results and Progress:
PSOPs’ interventions in Colombia focus on enhancing protection for women in conflict-affected regions and increasing women and girl victims’ effective participation in the transitional justice system. Results include:
- During this period, Canadian funding to the project “Peace Process in Colombia: Building Confidence in Transitional Justice” resulted in four significant advances on emblematic cases of violations against women and/or girls’ human rights.
- Through the project “Promoting Inclusion and the Rights and Participation of LGBTI Victims of the Armed Conflict in Colombia” the Truth Commission increased the inclusion of LGBTI considerations in their “Plural Listening Strategy”, further to technical assistance and recommendations made by Colombian LGBTI groups.
- Through the UN Multi-Partner Trust Fund (MPTF), Canada supported efforts to enhance the capacity of the Government of Colombia to guarantee victim’s rights to justice, reparations and participation in transitional justice processes, among others. Reconciliation spaces were created where meetings for truth were held, advancing confidence building and trust between communities.
- Furthermore, through the MPTF contribution, 379 women and 882 men, including those from ethnic communities, were strengthened in their abilities to report alerts to the Ombudsman’s early warning system.
- Through “From Conflict Actors to Architects of Peace: Promoting Security and Development across Borders” Canada’s support resulted in 15 local civil society actors (7 women and 8 men) from the borderlands of Colombia improving their skills to identify and express local, grounded security concerns to national-level policymakers, including security concerns faced by women.
- Though the project “Building Peace with Colombian Indigenous Communities”, Canada supported the development and approval of an access route to prevention and protection against sexual and gender-based violence, benefiting Sande Indigenous women from three municipalities in Nariño. Furthermore, 27 women and 3 men civil servants from the Colombian security, justice and social services sector, improved their knowledge on protection mechanisms; women and girls’ human rights; and the inter-relations between the Indigenous law system and the Colombian law system, thus contributing to improved efficacy and harmony in working with Indigenous communities on protection and legal issues.
- Through our contribution to the Office of the United Nations High Commissioner for Human Rights, Canada supported the design and implementation of a “Protective Environments” methodology (in partnership with UN Women) in Vista Hermosa, Meta. This initiative resulted in 28 commitments made by health, justice and protection institutions to women’s organizations, to enforce a protective environment that included a focus on gender-based violence and improves women’s enjoyment of economic, cultural and social rights.
- Through Canada’s contribution to the Organization of American States (OAS) Mine Action Program, 3388 people (1555 women and girls; and 1833 men and boys) from 30 prioritized municipalities for humanitarian mine clearance by Colombian military brigades demonstrated improved mine risk awareness and safer behaviors, resulting in no new reported landmine accidents in these municipalities during this period.
Challenges:
Some delays occurred in transitioning activities to the virtual space in the context of the COVID-19 pandemic mobility restrictions, which consequently resulted in lapses for some projects. The COVID-19 pandemic induced delays posed a number of challenges, particularly to the Truth Commission, whose mandate ends in November 2021. Connectivity issues with participants from isolated regions posed some challenges to effective participation. The COVID-19 pandemic mobility restrictions (imposed by both State and non-state actors) also resulted in increased threats, violence and assassinations of both women and men social leaders and human rights defenders, and reduced abilities for victims to access services. Reports indicate increased domestic violence and SGBV against women and LGBTI populations.
Priorities: Support women’s empowerment and the advancement of GE, including through the engagement of men and youth
20.3 Target: Canada enhances access to quality education and sustainable livelihoods for girls and women as key components for a sustainable peace.
Target achieved to date as of March 31, 2021: Mostly on track/Objective 3
- 20,642 women and girls were economically empowered through development projects.
- 5,078 women and girls received access to quality education in conflict-affected rural areas.
Baseline:
- In FY 2016/17, Canada’s development program in Colombia economically empowered 3,600 women through financial education and provided access to quality education in conflict affected rural areas to 2,109 boys and girls.
Activity:
- Fund projects/ activities that increase women’s access to resources and support their increased and meaningful participation in economic activities, particularly in rural areas and conflict-affected communities
- Fund projects/activities that increase access to quality education for young women and girls in conflict-affected rural areas and projects aiming to build the capacity of women to advocate for and monitor the adequate implementation of the aspects of the peace agreement that relate to their rights, including gender-sensitive security sector reform efforts
Indicator:
- # of women and girls economically empowered through development projects/activities
- # of women and girls with access to quality education in conflict-affected rural areas
Completed Activities:
- Supported women’s and girls’ empowerment through economic and educational projects by providing access to credit for women farmers, providing financial management training and technical assistance, and training on entrepreneurship and economic empowerment.
- Contributed to the access to quality rural education as a resilience mechanism and to provide alternatives for youth in conflict-affected regions
- Canada’s contribution to the Multi-Partner Trust Fund (MPTF) in Colombia supported economic recovery projects benefitting women and men in rural regions prioritized under the Government of Colombia’s Territorially-Focused Development Plans (PDET).
Results and Progress:
ViaCo-operative Development Foundation of Canada, financial and business development services were provided to 54 rural cooperatives and producer associations, benefitting 13,006 producers (30% women); while 10,048 producers from 45 organizations (30% women) accessed associative loan. Such loans are granted to the collective group, instead of individual producers, creating stronger relationships and organizational practices.
Through Alinea Canada, 618 producers (59% women) received technical assistance to adapt to climate change.
Through Plan Canada’s project, Leading for Peace, 2.617 women victims of the armed conflict received training in financial literacy and participate in Savings and Loans associations; 994 youth were trained on gender-transformative life skills and entrepreneurship (Women; 722, Men: 272); and 300 productive initiatives are being supported with seed funds and materials.
Through Cuso International, a total of 14,933 individuals (66% women), increased their participation in the labour market. 4,000 women are now linked to formal employment. An additional 247 micro-businesses have been supported increasing profitability for 464 women (62%).
Through Socodevi, 78 women have been supported and elected as full members of the executive boards of their association, increasing the minimum of 30% women representation in the 34 participating cacao producer associations from 47% to 64%. 11 additional associations have developed and approved a gender equality plan to guide their activities and enhance women empowerment. 52% of women involved in the cacao value chain have demonstrated increased level of empowerment, compared to 34% a year ago; this contrasts with the results of a control group (made up of women not benefitting from the project) set up in the same geographic areas, only 13% of which showed similar empowerment.
In FY 2020/21, the Profamilia project adapted to virtual and other remote methodologies brought on by the pandemic context. The project managed to reach 8,133 girls and boys (82% of the total group, 4,106 girls and 4,027 boys) through weekly online “challenges” to begin the reflection process about gender roles (delivered through the caregivers’ phones); as well as the design and delivery of physical booklets and a board game for those with limited communications in order to facilitate access to information.
Additionally, 523 teachers received virtual training in SRHR. The target for this year was 100 teachers and the total for the project is 550. This shows another unintended positive effect of the pandemic, as the change of methodology to virtual capacity building allowed more teachers to be regularly engaged.
Through the CFLI project called VerduPaz undertaken by Membru International in Cajibío, Cauca, 70 farm families improved their family farms through various agricultural inputs to make them organic and more productive, and 83 women participated in training on gender equality, structural gender-based violence, leadership, economic empowerment and entrepreneurship. Through another CFLI project in Puerto Asís, Putumayo, led by the Colombian Campaign Against Mines (CCCM), 10 productive initiatives were carried out where women affected by conflict improved their knowledge of animal husbandry. These inputs will result in an improvement of their family income and food security.
Through Canada’s contribution to the MPTF, 80 grassroots organizations strengthened their economic empowerment capacities in 60 municipalities, benefitting 2,251 women and 2,308 men.
Challenges:
The main challenge during this period were the COVID-19 pandemic related mobility restrictions and health risks, which resulted in projects needing to refocus their delivery approach to the virtual space, thus causing implementation delays and budget lapses for some projects. With connectivity issues common in much of rural Colombia, the inability to physically travel to some regions delayed implementation of some larger scale events. Others were able to adapt to the virtual space, although it was commonplace that those with bad connection had trouble actively contributing, which somewhat hindered the overall quality of the events.
As with the majority of education or training programming activities in development projects, partners have had to adjust project plans, activity work plans and in some cases overall expected project targets and/or results in response to an on-going pandemic context. Colombia rural areas in particular have been greatly impacted by COVID-19 cases and related closures. Programming partners such as Profamila, were challenged to pivot project annual work plans and find new ways to deliver a good portion of their activities. This impacted greatly project progress. Nonetheless, with time, partners were able to respond and find new ways of working, with some unintentional positive consequences. For many partners relying on education/training activities, the delays and challenging contexts have impacted project budgets, including burn rate ability for example, and thus requests for no-cost extensions of project agreements.
Priorities: Mainstream WPS and gender into peace and security efforts in Colombia
20.4 Target: Canada, through PSOPs, demonstrates support for women’s increased and meaningful participation in improving peace and security in Colombia by ensuring that WPS principles and/or gender perspectives are integrated in 75% of projects
Target achieved to date as of March 31, 2021: Target Achieved or Surpassed/Objective 3
- 4 out of 11 projects, or 36%, in Colombia explicitly targeted GE (GE03).
- 7 out of 11 projects, or 64%, in Colombia integrated GE considerations (GE02).
Baseline:
- In the FY 2016/17, there were 7 out of 11 projects (63%) that included WPS and/or gender perspectives.Footnote 14
Activity:
- Encourage the inclusion of gender-based results in project design and promote gender budgeting
- Ensure that WPS principles and/or gender perspectives are reflected in new PSOPs projects
Indicator:
- # and % of PSOPs projects in Colombia that integrate GE considerations (GE01 and GE02 levels)
- # and % of PSOPs projects in Colombia that explicitly target GE (GE03 level)
Completed Activities:
- 7 out of 11 projects (64%) in Colombia integrate GE considerations (GE02).
- 4 out of 11 projects (36%) in Colombia explicitly target GE (GE03).
- Five new projects became operational in FY 2020/21 (4 GE02 and 1 GE03) for which PSOPs worked closely with the implementing partners to encourage the inclusion of gender-based results throughout the lifecycle of the projects.
- For operational projects, PSOPs worked to ensure that narrative reporting included sufficient details on the gender aspects of activities and results.
Results and Progress:
PSOPs’ interventions in Colombia focus on promoting the inclusion of women in the implementation of the peace process and in addressing the ongoing post Peace Agreement violence. PSOPs supports women’s empowerment to become agents of change in this environment, and to address the different needs of women, men, girls and boys. This is exemplified in the following initiatives:
- Though the project “Building Peace with Colombian Indigenous Communities”, Canada supported the development and approval of an access route to prevention and protection against sexual and gender-based violence, benefiting Sande Indigenous women from three municipalities in Nariño. As a part of this initiative, the new “Women’s Counseling Committee” was also established and integrated in the Sande Indigenous community´s governance structure and Indigenous legal system. This committee plays an important role for accessing services and acts as a key advisory body for the Sande Indigenous Governor on matters affecting women, including cases of abuse.
- Canada’s funding to the Organization of American States (OAS) Mission to Support the Peace Process in Colombia (MAPP) enabled the MAPP to make recommendations on incorporating the WPS agenda into the Policy on the Dismantling of Criminal Organizations and Criminal Behavior. They were approved by the National Commission on Security Guarantees (CNGS) and included in the “Recommendations of the Gender Thematic Session for the Construction of the Diagnosis of the Criminal Dismantling Policy”. Given that synergies between the security, crime, peace and gender agendas is still under construction, the MAPP’s recommendations contribute to an important paradigm shift for peacebuilding in Colombia.
- Through the project “Peace Process in Colombia: Building Confidence in Transitional Justice”, Canada supported efforts that resulted in increased knowledge and capacities of four CSOs, including two women’s and one LGBTI group, to access rights to justice, truth processes, reparation and non-repetition for women, LGBTI and Indigenous victims of the conflict.
Challenges:
The main challenge during this period were the COVID-19 pandemic related mobility restrictions and health risks, which resulted in projects needing to refocus their delivery approach to the virtual space. This has caused implementation delays and budget lapses for some projects. With connectivity issues common in much of rural Colombia, the inability to physically travel to some regions delayed implementation of some larger scale events. Others were able to adapt to the virtual space, although it was commonplace that those with bad connection had trouble actively contributing, which somewhat hindered the overall quality of the events.
In addition to this, Colombian enforced mobility restrictions resulted in harsh economic struggles for the more vulnerable Colombians that work in informal economic settings and were struggling to support themselves. In these instances, project partners reported some challenges in engaging target populations given that these groups were more focused on sustaining themselves day-to-day rather than project work.
Asia
21. Afghanistan
Context: Decades of conflict and fragility have deepened and legitimized the practices that deny women and girls their human rights, mobility and opportunity, and ultimately their equal status with men and boys. Women and girls throughout Afghanistan are disadvantaged by: their low participation in politics and governance; un-implemented laws that protect women; limited access to justice; pervasive SGBV; cultural practices that undermine women’s and girls' rights; poor access to health services; poverty and economic dependence on men; and inadequate access to education and high female adult illiteracy. In addition, women continue to face major obstacles regarding economic opportunities, as well as norms that discourage women from working outside of the home and seeking financial independence. Most women lack literacy and financial management skills. Most Afghan businesswomen are unable to access credit or financing. Though laws protect women’s rights to property and inheritance, in reality many women still struggle to claim their economic and property rights. Despite modest gains over the past decade, ongoing conflict hampers the overall progress of women’s economic, political and social rights.
Development programming in Afghanistan is focused on empowering women and girls through increased support to women organizations and improved access to education and health care services. Canada will continue supporting the delivery of reproductive, maternal, newborn and child health care to women and girls living in hard-to-reach communities.
Canada supports Afghanistan’s NAP on UNSCR 1325 (2015-2022) through its programming, policy dialogue, and diplomatic engagement. Afghanistan’s NAP was initiated in 2013 by the Afghan Ministry of Foreign Affairs and developed in consultation with 21 government institutions, leading CSO, and the Afghan Women’s Network, which convened seven provincial consultations to feed into the development of the Plan. It was publicly launched in June 2015. Afghanistan’s NAP aims to increase women’s participation in peace processes and the security sector, as well as to address issues around protection and relief and recovery services for women. Canada is also a strong proponent of ensuring the retention and recruitment of women in the Afghan National Defence and Security Forces and their observation and implementation of the WPS agenda. Canada also supports Afghanistan’s NAP through programming that advances women’s social and economic empowerment, including addressing SGBV and supporting the Elimination of VAW Law.
Priorities: Support the increased representation of women in the Afghan National Defence and Security ForcesFootnote 15
21.1 Target: Canada actively supports the implementation of Afghanistan’s NAP on UNSCR 1325. Afghan National Defence and Security Forces have targets for recruitment of qualified women, particularly at the low and middle management level, as part of the Afghan National Defence and Security Forces sustainment. The goal is to reach the targets set for women within the Afghan National Police and the Afghan National Army: 5% for the police and 0.75% for the army.
Target achieved to date as of March 31, 2021: On track/Objective 1
- Afghan National Police enrollment figures (source: April 2021 Quarterly SIGAR Report): 3,831 female personnel out of a total 121,088 (3.16%).
- Afghan National Army enrollment figures (source: April 2021 Quarterly SIGAR Report): 2,062 female personnel out of a total 186,859 (1.1%). This exceeds the Canada National Action Plan on Women, Peace, and Security’s target for the recruitment of women in the ANA.
Baseline:
- Canada supports recruitment of qualified women within the Afghan National Defence and Security Forces through ongoing dialogue with the Ministry of the Interior and Ministry of Defence, as well as targeted projects under the Law and Order Trust Fund and the Afghan National Army Trust Fund. (In 2016, Afghan National Police recruitment levels were 2% and Afghan National Army recruitment levels were 0. 53%)
Activity:
- Take a leading role in supporting the Ministry of the Interior and Ministry of Defence, via both the Law and Order Trust Fund and the Afghan National Army Trust Fund, respectively. The goal will be to target GE projects through both of these mechanisms
- Continue to co-chair the Ministry of Interior Support Team and take on potential new role as co-chair of the International Police Coordination Board, both of which will engage on support of Afghanistan’s NAP
Indicator:
- # of occasions policy dialogue was undertaken in relevant forums on implementation of Afghanistan’s NAP on WPS
- % of women recruited into the National Police and Afghan National Army
Completed Activities:
- Supported the Ministry of the Interior and Ministry of Defence, via both the Law and Order Trust Fund and the Afghan National Army Trust Fund, respectively. Targeted GE projects through both of these mechanisms.
- Canada successfully completed its role as co-chair of the Ministry of Interior Support Team.
- Supported the Afghan Ministry of Foreign Affairs on the implementation of Afghanistan's National Action Plan on WPS through the Heart of Asia society.
Results and Progress:
Since the previous reporting period, the number of women in the ANDSF has increased slightly (from 1.82 to 1.91% %). As reported in the April 2021 Special Inspector General for Afghanistan Reconstruction (SIGAR) report, the vast majority of ANDSF female personnel serve in the Afghan National Police in low and middle management levels. Of the female personnel in the Afghan National Army, 149 serve in the Afghan Air Force (AAF) and 332 in the Afghan Special Security Forces (ASSF).
A flagship project of the Afghan National Army Trust Fund (ANATF) is the Women Police Town project, which aims to improve the recruitment of female members into the defence and security forces. Once completed, it is anticipated to house 300 ANP police women and their families. It incentivizes female police and security forces by providing safe housing for active serving members and rewarding long term veterans, the martyred, the disabled and their families.
The ANDSF have made considerable gains in furthering the WPS agenda by recruiting and retaining women in the last decade despite ongoing challenges, such as creating a protective environment for women. Despite the progress made towards recruiting and retaining women in the security forces, female service members face a daunting array of problems: social stigma, discrimination from male colleagues, restricted career development, resistance from the communities where they work, and harassment and abuse from their male colleagues. Consultations with key stakeholders in Afghanistan highlight the importance of high-level international advocacy in support of the WPS agenda within the ANDSF as well as improvements in complaints mechanisms to address sexual harassment and adopting to progressive social norms. In addition, support for the participation of women in the peace talks will be essential for ensuring that women’s rights and gender equity remain a priority. While much of the focus has been put on the participation pillar of WPS within the ANDSF, the “protection pillar” is increasingly more important.
The withdrawal of international troops and their gender advisors is particularly affecting the role of women in the security institutions. The international advisors were instrumental in supporting gender-related issues as well as pushing the leadership of security institutions to ensure that women receive the required political attention and support, messages which were reinforced by the NATO and US Commanders. Because of the withdrawal, a recent decline in political will and high-level support for the Ministry of Interior (MoI) and Ministry of Defence (MoD)’s Gender Directorates have been reported. Gender Directorates are the lead policy units on gender issues within their respective departments; they lead on strategic gender-integration plans and gender-related priorities. Canada recently issued a letter on behalf of donors to Afghan security ministers, followed by a demarche to the National Security Advisor on the need for more support for women.
Canada, in coordination with others donors through the Heart of Asia Society, supported the Directorate of Human Rights and Women’s International Affairs within the Afghan Ministry of Foreign Affairs on the implementation and tracking of Afghanistan’s National Action Plan on Women, Peace and Security. This initiative informs Canada’s own National Action Plan commitments, with the intention to support other countries’ efforts to build their own National Action Plans.
Priorities: Support women’s rights organizations in advancement of Afghanistan’s NAP on WPS
21.2 Target: In direct support of the goals outlined in Afghanistan’s NAP on WPS, 35 Afghan women’s rights organizations are supported through the Women’s and Girls’ Rights and Empowerment sector programming.
Target achieved to date as of March 31, 2021: On track/Objective 1
- 54 Afghan women’s rights organizations are supported through Women’s and Girls’ Rights and Empowerment (WGRE) programming (excluding Canada Fund for Local Initiatives).
- 100 local, Afghan CSO partners were supported during the reporting period, with the goal of advancing gender equality and women’s empowerment. Of these, 3 local organizations focused specifically on promoting peace at the grassroots level.
In FY 2020/21, Canada’s Afghanistan bilateral programming had the following gender integration profile:
- 49.9% of projects targeted gender equality as a specific objective (GE03)
- 43.8% of projects integrated gender equality (GE01-GE02)
- 6.3% of project did not advance gender equality (GE00)
In FY 2020/21, the PSOPs projects in Afghanistan had the following profile:
- 33.3% of PSOPs projects in Afghanistan integrated gender perspective (GE01 and GE02)
- 66.7% of PSOPS projects in Afghanistan explicitly target WPS and have GE as the principal objective (GE03).
Baseline:
- In FY 2016/17, Canada supported one women’s rights organization through policy dialogue and Women’s and Girls’ Rights and Empowerment sector programming.
Activity:
- Support Afghan women’s rights organizations through policy dialogue and dedicated women’s and girls’ rights and empowerment programming
Indicator:
- # of Afghan partners supported by Women’s and Girls’ Rights and Empowerment sector programming in direct support of the goals outlined in Afghanistan’s NAP on WPS
Completed Activities:
- 54 Afghan women’s rights organizations were supported through Women’s and Girls’ Rights and Empowerment sector programming, notably by providing training on the Elimination of Violence against Women (EVAW) law and women’s legal rights.
- The Women’s Voice and Leadership project implemented by the Asia Foundation provided capacity building, multi-year and fast responsive funding directly to local, Afghan women’s rights organizations (WROs). 20 WROs were supported through the Fast Responsive Fund to address emerging needs in response to women’s issues and crises. 9 WROs were selected for multi-year funding, capacity and alliance building.
- The Ambassador of Canada to Afghanistan and senior GAC officials frequently delivered messaging on WPS and the protection of Afghan women’s rights through press releases, joint donor statements, social media as well as at WPS-related events and international fora. Such occasions included the 16 Days of Activism against Gender-Based Violence campaign, the September 2020 Afghanistan donor pledging conference, the Friends of Afghan Women Ambassador Group, in the context of the peace process and troop withdrawal, as well as in various op-eds.
- Meetings held with Afghanistan government officials at which Canada conveyed its support for the Afghan National Action Plan and prioritization of WPS.
- Multiple meetings with local civil society actors, international NGOs and UN agencies focusing specifically on elements of WPS.
- On October 2, 2020, the Ambassador of Canada to Afghanistan participated in the first Afghan Women Ulema Conference, which virtually convened 32 women activists and scholars from across the country to amplify their demands for an inclusive peace process and calls for an immediate ceasefire.
- One Canada Fund for Local Initiatives (CFLI) project supported local Afghan civil society efforts on WPS-related priorities. Two additional CFLI projects supported complementary goals in terms of women’s empowerment and the protection of women’s rights.
- The Embassy’s social media messages consistently prioritized WPS and gender equality.
- Cordaid has been providing training for the Core Group of Women to build their skills in strategic communications, coalition-building, advocacy and outreach.
- Cordaid’s Sharia Toolkit has been completed, inaugurated and signed off by Ministry of Hajj and Religious Affairs
Results and ProgressFootnote 16:
Canada’s programming on Women’s and Girls’ Rights and Empowerment addresses sexual and gender-based violence and supports the Elimination of Violence against Women (EVAW) law by strengthening implementation of policies and programs, amounting to CAD$8.3 M in FY 2020/21. In this reporting period, Canada worked with eight regional and international partners and a total of 54 Afghan women’s rights organizations across Afghanistan to implement its programming in this sector. Canada’s Women’s and Girls’ Rights and Empowerment programming achieved tangible results in terms of reaching women and men with sensitization and messaging on women’s rights, training and empowering women to participate in income-generating activities, strengthening mechanisms and systems for responding to gender-based violence and, ultimately, improving women’s decision-making ability at both the household and community level.
Canada’s support to the Strengthening Afghanistan’s Future through Empowerment project, with War Child Canada, aims to broaden and strengthen the enabling environment for rights, protection and empowerment of women in Afghanistan. In FY 2020/21, 228 legal actors, government officials and community leaders received training on the EVAW law and 840 Community-Based Protection Mechanism members were identified to refer and respond to gender-based violence cases in their communities. During the reporting period, more than 700 men and women, including gender-based violence survivors, accessed legal aid counselling and more than 1,110 accessed psychosocial support services. As a result, supported districts were able to more effectively promote the rights of women and girls to participate in decision making at the household level and protect them against GBV.
Relief International's Women’s Enterprise, Advocacy and Training program, funded by GAC, promotes an enabling environment for gender equality by providing access to necessary information and assets, and building women’s confidence to participate in decision-making processes. The project trains prosecutors, paralegals and police on strategies and established referral services survivors of gender-based violence. During FY 2020/21, more than 2,350 women participated in awareness sessions around women’s rights, confidence building, psychological first aid, child marriage and women’s economic empowerment. Through these and other targeted interventions, Relief International increased women and girls’ resilience to GBV.
Canada contributed to the development of regional networks of women media practitioners through the Her Voice, Her Rights project. The implementing partner, BBC Media Action, supported six FM radio stations to produce gender-sensitive and gender-transformative radio shows, in order to raise awareness on social challenges, showcasing success stories of women in leadership roles and shedding light on the impact of harmful masculinities. As of FY 2020/21, the radio stations had produced 150 radio programmes that promoted the rights of women and girls, as well as 150 gender-themed episodes of the popular radio drama, New Home New Life. As a result of these capacity building activities, civil society and media organizations in Afghanistan were more effectively coordinated in advocating and promoting the rights of women and girls.
The Afghanistan Women's Empowerment Program, implemented by the Aga Khan Foundation Canada, successfully increased the participation of women in economic and public life by emphasizing women's ability to successfully engage in income-generating opportunities. During the reporting period, 90 women completed vocational training and another 140 were supported to start their own agri-business.
Through contributions to the World Bank-led Afghanistan Reconstruction Trust Fund (ARTF)’s Women Economic Empowerment Rural Development Project (WEE-RDP), Canada supported activities to remove legal barriers to women’s participation; training in literacy, business management, and labor skills; ensure inclusive access to finance; improve access to agricultural inputs, extension services, and markets; and promote access to creative economy markets. WEE-RDP was active in over 4,000 villages across the country.
During the reporting period, the COVID-19 pandemic situation posed challenges for the implementation of these programs, particularly in hosting group-based training activities and larger-scale advocacy events. Just as programs were adapted to align with lockdown restrictions, project mitigation measures were employed during FY 2020/21 as a result of a deteriorating security situation. Since the beginning of intra-Afghan peace negotiations in September 2020, a sharp increase in civilian casualties has been observed, particularly the targeting of human rights defenders, women’s rights activists, civil society actors, journalists, moderate imams and others. This has required project staff and beneficiaries to exert heightened caution and discretion in certain circumstances, such as when participating in high-visibility, rights-based advocacy activities.
Cordaid has become the ad hoc focal point organization to coordinate side events at high-level talks between the Government of the Islamic Republic of Afghanistan (GIRoA) and the Taliban, advocating for women’s voices to be at the table of the negotiations.
Cordaid has also been incorporating the perspectives and views of a diversity of Afghan women and has been consistently engaged with the 4 female members of the negotiation team.
Canada Fund for Local Initiatives (CFLI)
In FY 2020/21, through the Canada Fund for Local Initiatives, Canada supported 4 Afghan partners aligned with Canada’s National Action plan, including:
Equality for Peace and Democracy (EPD): EPD mobilized local leaders, religious scholars and women activists to raise awareness on the COVID-19 pandemic and the primary and secondary effects on women. EPD provided training and raw materials to 50 women to produce face masks and support their families economically. In order to reduce the GBV-related cases, EPD provided training sessions for local leaders, particularly religious leaders and women’s rights activists, to collaborate in the campaign for the reduction of violence against women and raise awareness among families and communities. The door-to-door awareness campaign on the COVID-19 pandemic and GBV reached approximately 1200 families, in addition to many students, community councils and community members during Friday’s sermons.
Afghanistan and Central Asian Association (ACAA): In response to the COVID-19 pandemic and ensuing GBV crisis, the project established three free and independent legal advice clinics in Kabul, Balkh and Paktia provinces, in order to improve women’s access to justice and support the protection of their rights. The project employed a group of professional women to train and empower a network of local volunteer women to work in these legal advice clinics, provide free legal support to women in need and advocate for the rights of women in the community level. In total, 94 women received free legal advice. A parallel career development program further enhanced the professional capacity of 300 women and strengthened their role within their communities.
Afghanistan Youths Civic Engagement and Educational Organization (AYCEED): The project advocated for the meaningful participation of youth in the ongoing Afghan peace process by empowering 150 girls and boys through critical thinking and peacebuilding training, as well as through debates, public speaking and civic education. The project participants then shared these skills and information with hundreds of other youth in their respective communities. The project activities helped youth to make informed decisions, actively engage in civic activities and advocate for an inclusive peace process in the country.
Human Rights Research and Advocacy Consortium (HRAAC): In order to address the increase in GBV cases due to the COVID-19 pandemic situation in Helmand province, HRAAC organized awareness sessions for local leaders and CSO members to better advocate for the reduction of violence against women in the context of the COVID-19 pandemic. These awareness sessions increased the level of trust between communities and government officials while positively impacting GBV service delivery and reducing domestic violence and GBV in communities. In total, 120 men and youth received training on how to prevent, address and report GBV related cases in their communities. In addition, the project built the capacity of 120 women in tailoring skills, particularly making face masks and clothes, which helped in promoting the economic empowerment of women in Helmand province.
22. Myanmar
Context: Since August 25, 2017, the grave humanitarian and security crisis that continues to unfold in Myanmar stands as a global tragedy, which has led more than 730,000 Rohingya to flee their homes in Rakhine State and seek refuge in neighbouring Bangladesh. SGBV has featured significantly in this conflict and Canada will continue to advocate for the human rights of the Rohingya and on the need to bring perpetrators of violence to account.
The Rohingya crisis starkly underscores the importance of pursuing GE in Myanmar. To date, Myanmar’s progress in GE includes equality in legal and policy frameworks, such as constitutional guarantees for equal rights without discrimination against any Myanmar citizen on the basis of sex. Myanmar has ratified and endorsed the major international conventions and agreements on GE and women’s and children’s rights, and its National Strategic Plan for the Advancement of Women (2013–2022) is based on the priority areas of the Beijing Platform for Action. Significant challenges remain despite this progress, including limited public sector capacity, policy implementation gaps, varied performance among and within sectors, traditional cultural values related to women’s roles and responsibilities that shape familial relationships, limited women’s participation in decision making and access to resources, and allowing GBV to occur with impunity. Moreover, Myanmar’s peace process has largely excluded gender concerns and women’s participation in both process and substance. The level of women’s inclusion during peace agreement negotiations has been low.
In response, Canada’s bilateral development program will work with partners to integrate GE results across development programs, increase support for SRHR, including ending SGBV, and increase support for women and girls’ and GE through the support of local organizations. PSOPs programming in Myanmar will support and strengthen the capacities of various groups, including women’s groups, to increase their participation and capacity to influence decisions on the peace process. In addition, PSOPs programming opportunities in Myanmar will take gender perspectives into account when deciding which initiatives to fund.
Priorities Support local women’s rights organizations and movements working to advance GE and WPS
22.1 Target: Canada strengthens the integration of GE and women and girls’ empowerment in bilateral development programming to 90% of funding by the end of the FY 2021/22 to increase GE and meaningful participation of women in public life in Myanmar
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Internal capacity and efficiency
- 91% of Canada’s bilateral development funding in Myanmar significantly integrated gender equality or specifically targeted gender equality and women’s and girls’ empowerment.
- Same result as FY 2019/20 as portfolio of projects in Myanmar funded by GAC did not change in FY 2020/21 although activities were adjusted to support civil society organizations after the February 1, 2021 Coup.
Baseline:
- 73% of funding integrates GE in results (FY 2017/18).
Activity:
- Identify new projects with significant integration of GE results or targeted specifically at women’s empowerment and support to women’s organizations by the end of FY 2021/22
Indicator:
- % of bilateral development funding that significantly integrates GE or that specifically targets GE and women’s and girls’ empowerment by the end of FY 2021/22
Completed Activities:
- Through the Support for Democratic Transition in Myanmar (K4DM) project (2017-2021, $10M), the International Development Research Center (IDRC) supported researchers and think tanks fill the gap in local research on gender and inclusion. The project improves the capacity of and collaboration among state and non-state actors and is advancing the use of research for evidence-based gender transformative economic and democratic policy development.
- The Improving Market Opportunities for Women Agricultural Producers (IMOW) project (2015-2019, $16M), implemented by the Mennonite Economic Development Associates (MEDA), aiming to improve women small farmers’ incomes and status as well as their economic role, trained women in public speaking and other soft and livelihood skills.
- The Women’s Voice and Leadership Myanmar (WVL) project (2019-2024, $5M), implemented by the Nordic International Support Foundation (NIS), specifically targets gender equality and women’s empowerment through the capacity building of women’s rights organizations (WROs). During the reporting period, 11 pre-selected WROs underwent capacity building and coaching to increase their ability to deliver quality programming and advocacy efforts and engage in alliance building. WROs supported the development of women leaders and leadership capabilities across generations through individual capacity strengthening support and leadership skills training and community awareness raising to foster support for women in leadership.
- Canada supports the Livelihoods and Food Security Fund (LIFT) in Rakhine program (2019-2022, $16M), implemented by UNOPS. In 2020, LIFT partners understood quite quickly that the pandemic would impact women and men differently, and therefore used social media and produced guide notes in local languages to ensure that women and girls needs were addressed during the response. In addition, the COVID-19 pandemic presented a good opportunity to expand partnerships with local civil society organizations (CSOs) in Rakhine through the Small Grant Fund, while increasing individuals’ resilience to the spread and impact of the COVID-19 pandemic. For example, 6 women’s groups were selected to deliver psychosocial support services, counselling, training on gender-based violence and discrimination against women. They also provided supplementary food to households with pregnant women, elderly people, widows and people with disabilities. LIFT partners also provided financial services to 112,505 women, primarily in the form of micro loans.
- Through the Strengthening Federalism and Inclusive Governance project in Myanmar (2019-2025, $6.9M), implemented by the Forum of Federations, decision-makers in Myanmar were provided activities and trainings to build their ability to develop and implement gender-sensitive federal policies. All participants indicated an increase in their capacity to do so.
- Through the Health Empowerment and Rights (HER) for Vulnerable Populations in Myanmar project (2018-2023, $18M), UNICEF and UNFPA supported an online youth-led campaign that reached 4.5 M people, including 1.6 million adolescents and youth.
- Through the Inclusive Democratic Development (IDD) in Myanmar project (2014-2021, $18.5M), Inter Pares supported a number of local initiatives that directly respond to the needs of ethnic minority and conflict-affected communities. Achievements include supporting Myanmar’s first ever land title to a collective of six ethnic Karenni villages and helping implement a new federal health policy in Shan State adopted by the Shan Health Department. As well, the project-supported Salween Peace Park gained global recognition and was awarded the Goldman Environmental Prize and the Equator Prize in 2020.
- Canada supports the Myanmar Peace Process by virtue of its membership of the Joint Peace Fund (JPF) (2017-2021, $9.65M). The JPF is deeply committed to gender inclusion in principle, funding strategy, and technical advisory support that aims to foster women’s leadership, while simultaneously pushing to meet the agreed 30% inclusion target committed to by the parties in Myanmar’s peace process through the provisions of the Nationwide Ceasefire Agreement (NCA). Despite the programmatic challenges and the impact of the global pandemic on Myanmar and JPF’s operations in 2020 – and following sustained advocacy on the part of the Embassy of Canada – there has been continued support to and operationalization of gender mainstreaming in partners’ project design and activities, in keeping with JPF’s gender marker framework and guidance for their application. Canada also advocated for greater consideration of the WPS agenda and core principles in JPF internal operations, while being informed by the historic and emerging needs and analysis of the various contexts in the country, including but not limited to a dedicated WPS expert in the JPF Technical Secretariat.
- Canada sits on the Funding Board of the Women’s Peace and Humanitarian Fund (WPHF, 2016-2021, CAD$5.5M), implemented by UN Women. This global pooled funding mechanism is designed to accelerate action and support for women’s participation, leadership and empowerment in humanitarian response and peace and security settings. In March 2021 the Funding Board decided to allocate an initial $1M USD to Myanmar for grants focusing on institutional support to women CSOs; support for women CSOs work on policy and advocacy on WPS; and support for women CSO led responses to emerging humanitarian needs of women and girls.
- The Advancing Leadership Skills of Female Potential Candidates project (2019-2021, CAD$92,690), implemented by the Women's Initiatives Platform (WIP), specifically targeted gender equality and women’s empowerment by preparing women leaders to be nominated and run for office. During the reporting period, WIP conducted several intensive, week-long workshops focused on feminist leadership, effective public speaking, and campaign strategy to women leaders representing diverse political parties.
Results and Progress:
Supported by the Support for Democratic Transition in Myanmar (K4DM) project, the Gender Equality Network organization provided recommendations and suggestions to the Protection and Prevention of Violence against Women bill. 50 percent of these were adopted. Five other supported think tanks produced and disseminated contextualized outputs on women’s participation in democratic processes at all levels and women and minority participation in the peace process. These studies have translated into photo-essays, reports and briefing notes that informed the public and policymakers of barriers to political participation women face.
MEDA has delivered training sessions in farming, finance and leadership to women. The Improving Market Opportunities for Women Agricultural Producers (IMOW) project has translated in increased household incomes and the respect of women as valuable community actors in villages. 549 women have been elected in leadership positions in social, development and administrative committees in their community. IMOW also promoted men engagement in gender equality that resulted behavior changes such as playing new roles by men in their households.
The WROs supported by the Women’s Voice and Leadership Myanmar (WVL) project are all operating despite significant challenges and have reported an increased ability to deliver quality services and advocacy efforts to the communities they serve. WRO’s work in closing the gender gap and the development of women as leaders has contributed to an approximate increase of 7% (from 10% to 17%) of women elected in parliaments at all levels during the November 2020 elections. As well, as a result of their ongoing advocacy efforts in the lead up to the 2020 general election, one WVL Myanmar implementing partner was successful in compelling the Kachin State People Party to endorse and implement a formal Gender Policy guaranteeing that 30 percent of all candidates for pre-selection must be women and/or youth. Out of 11 WROs, 8 organizations responded to challenges of women and girls including, marginalized communities, resulting from the COVID-19 pandemic crisis in coordination with additional 13 WROs.
All participants in the training sessions delivered by the Forum of Federations indicated that the Strengthening Federalism and Inclusive Governance project increased their capacity to contribute to the federal state’s future, and all students were confident with the relevance of the project at level 4 and 5.
The youth-led campaign supported by the Health Empowerment and Rights (HER) for Vulnerable Populations in Myanmar project empowered youth to act as agents of change by encouraging them to protect each other, and supported help-seeking behaviors from girls, young women and women in instances of violence and abuse during social isolation, and peer-to-peer support.
The efforts by Inter Pares, through the Inclusive Democratic Development (IDD) in Myanmar project, contributed to a gradual increase in women’s participation in the four 21st Century Panglong Union Peace Conferences (UPC) held between 2016 and 2020, with a 4% increase between the first and the fourth conference. Another sign of participation to public life is that 33% of the 583 interviews provided to Myanmar and international media agencies were conducted with women.
A recent evaluation of the Joint Peace Fund (JPF) support to WROs and their engagement in the Myanmar peace process found emergent results occurring in the areas of increased capacity, confidence, and community awareness; a stronger evidence base for women’s participation in the peace process, more informed by the voices of local women; some strengthened relationships that can be used for influencing; and some signs of peace process stakeholder responsiveness. The evaluation also found that advocacy efforts appear to be leading onward to new opportunities. For example, lobbying meetings appear to be generating increased demand for the involvement of WROs in further discussions, and sharing prepared evidence appears to be triggering new technical assistance requests.
As of December 2020, the WPHF has provided US$428,000 through 2 grants supporting 13 CSO partners in Myanmar, reaching 12,377 direct beneficiaries, including 7,551 women and girls. In 2021, Canada assumed the Chair of the Women’s Peace and Humanitarian Fund (WPHF) national level steering committee in Myanmar, and will work closely with the United Nations, fellow donors, and Myanmar CSOs to channel urgently-needed funds to local and grassroots civil-society organizations working on women, peace and security and humanitarian action in Myanmar.
More than 250 women leaders completed training delivered by the Women’s Initiatives Platform (WIP). Among these, more than 50 women were pre-selected by their respective political parties to run for office in Myanmar’s November 2020 election. During the reporting period, 48 of these leaders were nominated as candidates, and six went on to win seats in their constituencies. Although election results were annulled by the February 1 coup d’état, many of the women leaders trained by WIP continue to work for the advancement of democracy in Myanmar.
Challenges:
Between the COVID-19 pandemic restrictions and the coup d’état, it has been a difficult year for implementation of activities in Myanmar. However, Canada’s partners have been able to quickly adapt and respond to emerging needs with impressive success. One of the main challenges has been the difficulty to reach and maintain contact with beneficiaries, either due to limited access to internet, travel restrictions or competing immediate priorities. For example, LIFT partners were unable to reach beneficiaries with technical and vocational training due to prohibition on social gatherings. However, they quickly moved to digitize content for students with internet access/mobile devices. For students without devices, arrangements were put in place to provide them with access, including remote training to community-based staff and volunteers, who then cascaded learning to communities. In 2020, 5 of LIFT’s implementing partners (DRC, SCI, ILO, RI and Metta) provided training to 1,254 individuals (757 females) on technical, vocational skills and enterprise development in Rakhine, of which 760, started or extended their own business by applying the skill they have learnt.
Since the February 1, 2021, coup, another key issue for partners has been the diminishing space for CSOs to operate freely, openly and safely on topics deemed sensitive by regime leaders, such as human rights, democratization, freedom of expression, peace (building), inclusion, and equality. Many implementing partners have been forced on the run and into hiding without access to communications, computers, and records. Communications blackouts and shutdowns imposed by the regime exacerbated this. Further, targeting of implementing partners receiving foreign funding, international sanctions, and the collapse of the banking sector, made financial disbursements difficult. These challenging and fluid circumstances required sensitive but continued support for civil society to enable human rights defenders and activists to continue their essential work, without putting them at undue risk due to information leaks regarding their activities or affiliation with western governments.
Priorities: Increase the support for SRHR and rights including ending SGBV
22.2 Target: The support for SRHR and ending SGBV in bilateral development programming is increased by 2021/22.
Target achieved to date as of March 31, 2021: On track/Objective 2
- No new project was approved during the current fiscal year as the program focuses on the implementation of the initiatives listed below and on adjusting the current and planned projects to a new operating context after the February 1, 2021 Coup. The program is planning new initiatives to support SRHR and end SGBV that will be launched in 2021-2022.
Baseline:
- No projects target SRHR in the FY 2017/18.
Activity:
- Identify projects and partners to support SRHR including ending SGBV
Indicator:
- # of projects (or percentage of funding) on SRHR and ending SGBV
Completed Activities:
- Through the Inclusive Democratic Development (IDD) in Myanmar project, Inter Pares enabled health partners to provide comprehensive health services, including sexual and reproductive health and rights (SRHR), in ethnic majority areas to over 525,000 people (50% female) living in over 1,500 villages.
- The Health Empowerment and Rights (HER) for Vulnerable Populations in Myanmar project continued its work to address systemic barriers to the full realization of SRHR and ending sexual and gender-based violence (SGBV) among marginalized populations by supporting the government adopt gender-sensitive policies and through local and national SRHR access and education. During the reporting period, the project improved access to services and information.
- WVL provided quick funding to WROs delivering services to women survivors of violence through the Rapid Response Fund, a fund that provide nimble, flexible funding to WROs when unpredicted, emerging needs arise.
- From November 25 to December 10, 2020, the Embassy of Canada in Myanmar held a social media campaign during the 16 Days of Activism featuring videos from 9 partners working to prevent SGBV, as well as supporting women’s empowerment efforts that contribute to minimizing frequency and impact of GBV.
Results and Progress:
Through its activities, the project HER improved the quality and accessibility of SRHR information and services. It developed Comprehensive Sexuality out-of-school Education curriculum “Youth Empowerment, Safety and Sexuality” first manual. In addition, 4,808 children and adolescents (2,693 girls) were reached through adolescent networks, community or religious groups to engage in behavior change campaigns promoting girls’ access to services. 2,343 people downloaded the mobile application Love Question, Live Answer through which they received correct information on SRHR. As well, 1,627 young persons were provided with ASRHR services through both static and mobile clinics. 676 basic health staff were trained for Reproductive health commodity logistics system and and 37 focal persons were trained for automated electronic logistics management information system eLMIS.
The Women’s Voice and Leadership Myanmar (WVL) project’s support was instrumental in helping WROs benefiting from the Rapid Response Fund and providing safe houses to survivors of SGBV maintain their operation during the COVID-19 pandemic, despite restrictions and an increased demand for shelters.
The Embassy of Canada’s virtual campaign during the 16 days activism events reached more than 10,000 individuals in English and 700 in French, with videos of Canada’s-funded activities in Myanmar. This contributed to cementing Canada’s leadership in this area as one of the few existing feminist development partners in the country.
Challenges:
One of the biggest challenges partners have faced when addressing SRHR and SGBV issues this year has been the inability to engage with the government following the coup and competing priorities due to the COVID-19 pandemic. Some partners had a strong working relationship with the democratically elected government. This relationship was instrumental to implement several activities such as the adoption or improvement of some policies and bills. These activities had to be cancelled or shifted.
Similarly, following the coup, all programming that directly supported or benefited the government was stopped or redirected. For the “Climate Change and Disaster Resilience in Myanmar” project (2017-2021, $10M), a government capacity building project with the Asian Development Bank (ADB), this meant that a large proportion of programming needed to be adjusted or halted. Though nearing a close, these adjustments ultimately led to an early termination of the project.
Priorities: Mainstream WPS and gender into peace and security efforts in Myanmar
22.3 Target: Canada, through its PSOPs, demonstrates support for women’s increased and meaningful participation in improving peace and security in Myanmar by ensuring that WPS principles and gender perspectives are integrated in 75% of projects.
Target achieved to date as of March 31, 2021: Target achieved or surpassed/Objective 3
- PSOPS successfully integrated gender considerations and/or supported women’s participation in all projects in its Myanmar portfolio.
- In FY 2020/21, 5 out of 7 (71%) projects in Myanmar integrated WPS considerations (GE01 and GE02) and 2 out of 7 (29%) projects in Myanmar explicitly targeted WPS (GE03).
Baseline:
- In the FY 2016/17, there was 1 project (50%) that integrated WPS principles and gender perspectives in Myanmar.Footnote 17
Activity:
- Ensure that WPS principles and/or gender perspectives are reflected new PSOPs projects
- Encourage the inclusion of gender-based results in project design and promote gender budgeting
Indicator:
- # and % of PSOPs projects in Myanmar that integrate WPS considerations (GE01 and GE02 levels)
- # and % of PSOPs projects in Myanmar that explicitly target WPS (GE03 level)
Completed Activities:
- PSOPs successfully integrated gender considerations and/or supported women’s participation in all projects in its Myanmar portfolio.
- In FY 2020/21, 5 out of 7 (71%) projects in Myanmar integrated WPS considerations (GE01 and GE02) and 2 out of 7 (29%) projects in Myanmar explicitly targeted WPS (GE03).
- All of PSOPs programming in Myanmar took gender considerations into the design, implementation and monitoring of projects. Work will continue to take advantage of opportunities over the coming year to advocate for the full inclusion of women in prevention of further violence following the coup d'état and to bring women and women's issues to the forefront of conflict resolution and peacebuilding. Given the control of the military in Myanmar, this will prove to be more and more difficult, but all the more important for an inclusive, sustainable peace and return to democratic order.
- PSOPs will continue to work closely with diplomatic, development and humanitarian colleagues to promote a peace-positive approach in Myanmar and to find synergies amongst initiatives and programming.
Results and Progress:
PSOPs is supporting the Global Network of Women Peacebuilders (GNWP) for their work in both Myanmar and Bangladesh. In 2020, GNWP trained 25 young women leaders from Cox’s Bazar, Bangladesh, and 27 young women leaders and male gender equality allies from Myanmar to reduce tensions between host communities and refugees. The workshops enabled them to meaningfully participate in, influence and lead peacebuilding and political processes, such as the implementation of the WPS and YPS resolutions and advocacy for gender equality, women’s rights, and human rights. The young women leaders developed lesson plans for gender-sensitive, age-appropriate literacy and numeracy classes, integrating issues related to health and nutrition, confidence building, peace education, conflict mediation, human trafficking, family planning, and child marriage into the lesson plans. They have also held community dialogues on the gendered impacts of the COVID-19 pandemic and accountability for gender-based violence.
For the past five years Canada has supported the Joint Peace Fund, a multi-donor trust fund to advance the peace process in Myanmar. Building on the successes captured in 2019, where JPF committed to excluding any “gender blind” projects supported going forward. In 2020, there were no projects that did not include some aspect of gender inclusion activities in their design and implementation. JPF is exceeding its gender mainstreaming programme target of 15% of total funding – with the current total at 17%. Partners have been increasingly motivated to improve their own gender mainstreaming practices, which has resulted in increased levels of technical support from JPF staff to address needs and demands, including refining and customizing tools, training sessions, and partner-led responses from a diversity of partners across the portfolio.
An evaluation commission by the JPF revealed its support to women’s rights organizations and their engagement in the peace process found emergent results occurring in the areas of increased capacity, confidence, and community awareness; a stronger evidence base for women’s participation in the peace process, more informed by the voices of local women; some strengthened relationships that can be used for influencing; and some signs of stakeholder responsiveness. The evaluation also found that advocacy efforts appear to be leading onward to new opportunities; for example, lobbying meetings appear to be generating increased demand for the involvement of women’s rights organizations in further discussions, and sharing prepared evidence appears to be triggering new technical assistance requests.
All stakeholders in Myanmar’s peace process (prior to the coup d’etat) agreed to a 30% target for women’s involvement in the formal peace process. However, while some improvements have been made, the rate of women’s participation has remained significantly below that target: for 2020, the Union Peace Conference, women’s participation, was only 17%. Of the female participants this year, only 60% held “substantive roles”.
Challenges:
Throughout the course of year, FY 2020/21, conditions in Myanmar continued to deteriorate in relation to COVID 19, making it extremely difficult to conduct a large number of activities. A lot of initiatives were also in relation to the general elections held in November, 2020, an election that was thwarted by a coup d’etat by the Myanmar military (Tatmadaw) on 1 February, 2021. This has led to a reversal of democratic gains, a country-wide civil disobedience movement and increasing violence against civilians. Following the coup d’etat in Myanmar in February 2021, GAC, led by PSOPs, undertook a detailed scenario planning exercise to generate a whole-of-government view on the most likely scenario to unfold in the country over the next year and highlight key considerations for Canadian engagement. PSOPs is working with each project recipient to see how its programming activities must respond, pivot or cease due to the changing circumstances in Myanmar.
These challenges made it difficult to achieve many of the objectives intended for this programming in Myanmar. Numerous implementers had to halt, pivot or cease operations to ensure the safety and security of their staff. PSOPs is working closely with partners to determine new opportunities to support WPS initiatives and peace goals in Myanmar, into 2021-2022.
Annex 1: Methodology for Objective Ratings
The ratings for individual targets were assigned with the following considerations:
- Year-over-year progress;
- Change in target, activities and indicators; and
- Contexts in which implementation takes place.
To ensure quality control, the Action Plan coordination team at Global Affairs Canada reviewed all target ratings for accuracy, consistency and cohesion across the departmental reports. Feedback and recommendations were provided to responsible focal points, resulting in each individual target rating undergoing several rounds of consultations, discussion, and approval. This extensive process allowed for reduced subjectivity and improved accuracy.
Rating scale for achievement of targets:
Rating | Description |
---|---|
0 | Too Early to Report: We launched a new initiative the reporting fiscal year. We cannot report on progress. |
1 | Attention Required: Our efforts are not on track to achieve the target by the end of action plan/specified date Experiencing serious problems and intervention is required to ensure the target will be met by the end of action plan/specified date. |
2 | Mostly on Track: Our efforts are mostly on track to achieve the target by the end of action plan/specified date Experiencing manageable problems and minor attention/intervention is required to ensure the target will be met by the end of action plan/specified date. |
3 | On Track: Our efforts are on track to achieve the target by the end of action plan/specified date. Normal procedures/level of effort are sufficient to achieve the target by the end of action plan/specified date. |
4 | Target Achieved or Surpassed: We achieved or surpassed the target by the end of action plan/specified date. |
Annex 2: Summary of progress in meeting targets
Internal capacity and efficiency | Objective 1 Conflict prevention, resolution and peacebuilding | Objective 2 Prevent and address SGBV and SEA | Objective 3 Gender equality, human rights and empowerment | Objective 4 Gender-responsive humanitarian action and SRHR | Objective 5 WPS in peace operations | Total | |
---|---|---|---|---|---|---|---|
Too early to report on | 0 | 0 | 0 | 1 | 0 | 0 | 1 |
Attention required | 1 | 0 | 0 | 1 | 0 | 0 | 2 |
Mostly on track | 1 | 12 | 2 | 9 | 0 | 1 | 25 |
On track | 13 | 12 | 7 | 8 | 2 | 3 | 45 |
Target achieved or surpassed | 5 | 6 | 0 | 12 | 0 | 0 | 23 |
Total | 20 | 30 | 9 | 31 | 2 | 4 | 98 |
Annex 3: Tracking of International Assistance Investments to advance Women, Peace and Security
Background: While there is no internationally agreed method to track international assistance investments to advance WPS, Canada has developed a methodology to track WPS spending that builds on the OECD’s Development Assistance Committee (OECD-DAC) approach to capturing international assistance spending allocated to advancing gender equality in fragile states. This method is based on a combination of OECD-DAC purpose codes, Global Affairs Canada’s gender equality (GE) codes and a list of fragile and conflict-affected states created using 3 indices: the Fragile States Index, Global Peace Index and OECD States of Fragility Report. The projects are captured in our project database using these search criteria. Because of the application of OECD-DAC codes, the method can more accurately capture the relevant WPS components of projects, thereby providing more accurate reporting on funding amounts.
WPS funding: Based on this method, preliminary reporting demonstrates that GAC disbursed approximately $692 million to projects advancing the WPS agenda in 2020-21, as compared to $679 million in 2019-20, $497 million in 2018-19, $408 million in 2017-18, and $221 million the year prior, before the second Action Plan’s adoption. The 2020-2021 figures stem from 298 projects that fully integrated gender considerations (GE-02) and from 153 projects that aimed to advance gender equality (GE-03).
In the Action Plan’s countries of focus, GAC disbursed the following amounts to WPS programming:
- $50.1 million in South Sudan
- $35.8 million in Lebanon
- $38.1 million in Jordan
- $31.1 million in Iraq
- $25.3 million in Afghanistan
- $22.9 million in Syria
- $23.6 million in Haiti
- $24.1 million in Myanmar
- $21.4 million in Colombia
- $19.9 million in Mali
- $17 million in the DRC
- $3.7 million in Guatemala
- $1.6 million in Burundi
Below is a breakdown of GAC’s programming disbursements broadly aligned with the Action Plan’s 5 main objectives. Some objectives capture a much broader range of issues than others, which is reflected in the funding amounts.
The total amount of WPS funding increased slightly from the previous fiscal year, while a decrease appeared in 3 main objectives. It is important to note that these amounts represent disbursements made throughout the life cycle of a project, which may explain fluctuations in funding levels year to year. Many projects also contribute substantially to more than 1 objective, and their alignment for reporting purposes under the principal objective can also create shifts that under-report actual funding to complementary objectives.
- Gender-responsive peacebuilding, peacemaking, and post-conflict state-building, including support to women and women’s groups working on peace-related issues: $42.3 million in 2020-21 as compared to $21.8 million in 2019-20, $24.5 million in 2018-19, and $27 million in 2017-18, representing an increase of 94%Footnote 18 over the previous fiscal year.
- Prevention and response to sexual and gender-based violence, including ending impunity and providing services to survivors, and addressing sexual exploitation and abuse: $38.9 million in 2020-21 as compared to $ 50.4 million in 2019-20, $55.7 million in 2018-19, and $60.4 million in 2017-18, representing a decrease of 22.8%Footnote 19 over the previous fiscal year.
- Promotion and protection of women’s and girls’ human rights and empowerment in fragile and conflict-affected settings, including support to a gender-responsive security sector, women’s political participation, girls’ primary education and combatting violent extremism: 182.3 million in 2020-21 as compared to $205 million in 2019-20, $130 million in 2018-19, and $106.3 million in 2017-18, representing a decrease of 11.1% over the previous fiscal year.
- Advancing gender equality in humanitarian settings: $276.2 million in 2020-21 as compared to $170 million in 2019-2020, $100 million in 2018-19, $100.7 million in 2017-18, representing a significant increase of 62.5%Footnote 20 over the previous fiscal year.
- Sexual and reproductive health and rights in fragile, conflict-affected states and humanitarian settings: $149.9 million in 2020-21 as compared to $ 222.6 million in 2019-20, $ 160.9 million in 2018-19, and $113 million in 2017-18, representing an decrease of 32.6%Footnote 21 over the previous fiscal year.
- Strengthening the capacity of peace operations to advance WPS: $2.1 million in 2020-21 as compared to $9.2 million in 2019-20, $25.5 in 2018-19 and $664,000 in 2017-18, representing a decrease of 77.2%Footnote 22 over the previous fiscal year.
Report a problem on this page